Loading…
Loading…
Tender Value
₹8.2 Cr
EMD Value
₹8.2 L
Closing Date
25 May 2026, 6:00 pmClosed
Executive Engineer Sipu Project Division, Palanpur
Restoration and Repairing Work of Sipu Main Canal Between Ch.0.50 Km to 21.63 km. (3rd Attempt)
301717
Notice No.2 of 2026-27
Open
Civil Works - Canal
Banaskantha
14 documents required · 13 mandatory · 1 optional
₹12,000
Executive Engineer, Sipu Project Division, Palanpur
₹8.2 L
5 May 2026
5 May 2026
5 May 2026
25 May 2026
5 May 2026
Item Rate In
specification and reference to book Quantity Unit Amount
No figures
of specifications)
Jungle clearance of specified category and bushes
for canal/dam work as directed with disposing
materials etc. complete. (Excluding tree of girth
above 0.5 Mt.) (c) For heavy Dence
Excavation in all sorts of soil (including wet and
slushy condition of soil) with yellow, sandy,
gravelly soil including soft murrum & H.M.
including sorting & stacking and depositing the
2 excavated stuff in uniform layers as and where 392.00 Cu.M. 71.00
directed upto lead of 30 m and lift as shown below
including clearing the site etc. compute (including
dewatering). (B) For foundation trenches of C.D.
work (a) 0 to 3 Mt. depth
Dismentalling road surface including sorting &
stacking of useful and unuseful material from the
dismentalled materials as directed under detailed
specifications etc. complete. (a) Cement Concrete
Removing the damaged precast CC block lining
including breaking the joints, removing the same
sorting and stacking of useful and unuseful
material from the dismentalled material upto lead
of 200 mt.as directed under detail specification
etc. complete.(a) Up to 7.50cm thick
Providing & laying 7.50 cms thick cast in situ C.C.
1:2:4 grade with the use of crushed aggregates for
canal ling works incl. use of all equipments,
scaffolding, centering form work etc, with finishing
as required to the exposed surface, making
asphalt joints as directed & watering & curing
(without sleepers) with all lead and lifts etc.
Providing and laying CC 1:2:4 grade using cement,
sand & crushed metal incuding providing &
erecting necessary form work, centering, vibrating,
smooth finishing, watering & curing as directed
with all leads & lifts etc. complete. (a) Sub
structures
(b) Super structures 588.00 Cu.M. 4949.30
Providing & laying 10 cms thick cast in situ C.C.
1:2:4 grade with the use of crushed aggregates for
canal ling works incl. use of all equipments,
scaffolding, centering form work etc, with finishing
as required to the exposed surface, making
asphalt joints as directed & watering & curing
(without sleepers) with all lead and lifts etc.
Providing and laying HYSD/TMT Fe-415,500D steel
bar reinforcement for R.C.C. works and anchor
bars with providing binding wires including
cutting, bending, welding, binding in position,
hooking, placing in position with all leads & lifts
etc. complete. (c) TMT Fe-500D
Providing and Laying HDPE Liner of 750 Micron in
bed and Slopes of Canal at Required level Below
10450.00 Sq.Mtr. 177.68
lining as per Drawing and as Directed etc.
Earth work in embankment from borrow pits in all
sorts of soil and soft murrum or other suitable
strata as directed including breaking the clods and
10 dressing to the design sections including cutting 23550.00 Cu.M. 78.00
the proud section with lead as under and all lift
including site clearing etc. complete. (c) 200 to
Dry rolling of earth work with light rollers (upto
11 ton capacity) as directed with all lifts etc. 23550.000 Cu.M. 7.20
Extra lead charges for each additional km lead or
12 part thereof beyond 1.0 km and upto 5.0 km for 14130.00 15.00
embankment work including all lifts etc. complete. Km.
Total `
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(in words)………………………………………………….………………………………………………...
(C)Net Tendered Amount (A-B) (in figure) ………………………………
(in words)………………………………………………….………………………………………………...
1. The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Sr. Divisional Accounts Officer Executive Engineer
Sipu Canal Sub Division No-2 Sipu Project Division Sipu Project Division
Dantiwada Palanpur Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Nivida No-2 of 2026-27 (Gujarati-English) (F).pdf
SCH-B CC lining 0.50 to 21.63 km- with PCC.pdf
SBD CC lining 0.50 to 21.63 km- with PCC.pdf
Download all tender documents and submit your bid