Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹17.5 L+₹13,737.20 (0.79%)Accepted-AOC | L2 | Accepted-AOC Accepted | |
| 2 | L1₹17.4 LRejected-AOC 0 NEAR SHIV MANDIR KALYANIPURA KRIPAL NAGAR AJMER RAJASTHAN 305001 UDYAM RJ 01 0091182 | AJMER | RAJASTHAN | 305001 | L1 | Rejected-AOC L1. Non bonafide due to minimum fare wages | |
| 3 | L3₹18.3 L+₹90,541.20 (5.21%)Rejected-AOC | L3 | Rejected-AOC Being L3 | |
| 4 | L4₹18.3 L+₹92,276.80 (5.31%)Rejected-AOC | L4 | Rejected-AOC Being L4 | |
| 5 | L5₹18.4 L+₹1.0 L (5.92%)Rejected-AOC | L5 | Rejected-AOC Being L5 |
Tender Value
Refer Docs
EMD Value
₹36,700
Closing Date
15 Oct 2020, 6:00 pmClosed
CWE AF JODHPUR
HQ CWE AF JODHPUR
Manning and Operation Resources For Comprehensive Maint of HT LT Underground Cable Overhead electric supply and assets Under GE AF No-2 Jodhpur at AFS Mandore
2020_MES_378788_1
85863/E8
Open Tender
Miscellaneous Works
Item Rate
300 days
JODHPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE AF NO 2 JODHPUR
₹36,700
Yes
12 Dec 2020
18 Sept 2020
17 Oct 2020
18 Sept 2020
15 Oct 2020
2 Oct 2020
Manning, operation and maintenance of External electric installation at 750 SU mandore in three shifts round o clock i.e 1st shift from 0600 Hrs To 1400 Hrs , 2nd Shift from 1400 Hrs To 2200 Hrs and 3rd shift from 2200 Hrs TO 0600 Hrs. with one Electrician in each shift. Electrician will be responsible for following operation and maintenace of Power Sub station as under : Note :-The contractor shall be ensure proper functioning of Power Sub station at 750 SU Mandore, maintenance/operation/repair and servicing of HT VCB, transformer, LT Panels, voltage stabilizer, with joints, GO/DO, repair to street/security lights, all internal/external electric supply works as per site requirement and as directed by Engineer-in-Charge, by providing communication facility for lodging complaint, making complaint slips, recording of daily work done, getting users signature after completing the job card/complaint slips and providing necessary information to Engineer-in-Charge as and when asked for. For all these, the cost shall be deemed to be included in the quoted rates:- (a)-Any complaint/Job given by Engineer-in-Charge other than receiving at service center shall be attended and rectified the defects/complete the job by duty staff without any extra cost to Govt. (b)- Arrangement shall b
Month
(b) Ditto all as per item no.1 above but ESI as per existing rules for Electrician.
(d) Ditto all as per item no.1 above but Contribution of Bonus as per existing rules for Electrician.
(e) Ditto all as per item no.1 above but over head charges and profit on Srl No.(a) to (d) above.
(f) Ditto all as per item no.1 above but LWC as per existing rules.
(g) Ditto all as per item no.1 above but GST as per existing rules.
All as per item No 01 above but at balasmand site in three shifts of eight hours each shift (total 24 hrs) with one Electriction in each shift. Electricition will be responsible for operation and maintenace of the Electric installation.
Rate required to be quoted for execution of work as described in Srl No.2 here in before for the following.
(b) Ditto all as per item no.1 above but ESI as per existing rules for Electrician.
(d) Ditto all as per item no.2 above but Contribution of Bonus as per existing rules for Electrician.
(e) Ditto all as per item no.2 above but over head charges and profit on Srl No.(a) to (d) above.
(f) Ditto all as per item no.2 above but LWC as per existing rules.
(g) Ditto all as per item no.2 above but GST as per existing rules.
M/S SHARADA ASOCIATE
Bid Rank
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .