Tender Value
₹37.9 L
EMD Value
₹37,935
Closing Date
10 Sept 2026, 3:30 pmDue tomorrow
SE PRED PR KAKINADA
Kakinada
Providing CC road from Villagae Main Road to Pushkar Ghat at B. V. Lanka (V) of Alamuru in Dr B R Ambedkar Konaseema District Est cost Rs.50.00 Lakhs
980781
NIT No 49/Pushkaralu/2026-27 Dt:18-08-2026 of the superintending Engineer,PR circle,kakinada
OPEN - NCB
Road Work
KONASEEMA, ANDHRA PRADESH
11 documents required · 9 mandatory · 2 optional
₹1,343
₹37,935
27 Aug 2026
27 Aug 2026
27 Aug 2026
Name of the Work - Providing CC road from Villagae Main Road to Pushkar Ghat at B. V. Lanka (V) of Alamuru in Dr B R Ambedkar Konaseema District Est cost Rs.50.00 Lakhs Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20 respectively and and spreading in uniform layers with tractor grader on prepared surface and copacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD, 305 MoRT&H by using machinery including all over heads and Contractors profit, But excluding GST & Seignarage charges, etc, complete.
Construction of granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of Engineer in charge including contractors profit & Over head charges but excluding GST& Seignorage Charges.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Construction of Shoulders by providing Selected earth having minimum CBR of 10% , MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20 respectively and and spreading in uniform layers with tractor grader on prepared surface and copacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD, 305 MoRT&H by using machinery including all over heads and Contractors profit, But excluding GST & Seignarage charges, etc, complete.
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (precast) for Ordinary Kilometre stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (precast) for 200m Stone
Construction of un-reinforced, plain cement concrete pavement, using M30 nominal mix , thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.22 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints using Mastic pad/ primer, construction joint, admixtures as approved, curing of concrete slabs for 14 days, and water finishing to lines and grade as per drawing and technical specification clause 1501.22 including seignorage charges.(with dowel bars) including Cement,Sand,Metal As per circular Memo 1073 dated: 25-1-2016 of PS to Govt.including contractors profit & Over head charges, GST and Seigniorage etc.,
Provision for name board including lettering & Paintings etc.., .including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-
Sub estimate:600mm dia Pipe culvert Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts 600mm dia
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQBVLANKAAlamuru.xlsx
TENDER_DOCUMENT • 0.75 MB
SBDBVlanka50.doc
TENDER_DOCUMENT • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .