Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95,747Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | L1 | Accepted-Finance Being lowest bidder | |
| 2 | L2₹96,726+₹979 (1.02%)Rejected-Finance | L2 | Rejected-Finance Not lowest bidder | |
| 3 | L3₹99,347+₹3,600 (3.76%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance Not lowest bidder |
Tender Value
Refer Docs
Closing Date
13 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer MID Jammu
Repair/replacement of worn out parts of 3 cusec x 10m head pumping unit no.1 along with allied works at LIS Datriyal and replacement of worn out parts of 5 cusec pumping unit no.5 along with allied works at LIS Batera.
2021_IFC_149597_1
MID/J/e-NIT/2021-22/97
Open Tender
Repair and Maintenance Works
Lump-sum
10 days
Datriyal Batera
As per tender notice
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
Exempted
Jammu
18 Dec 2021
23 Nov 2021
14 Dec 2021
23 Nov 2021
13 Dec 2021
8 Dec 2021
23 Nov 2021 - 13 Dec 2021
7 Dec 2021
180 days
Amount
Repair/replacement of worn out parts of 3 cusec x 10m head pumping unit no.1 along with allied works at LIS Datriyal.
Decoupling of 03 cusec x10m head Horizontal casing pump of unit no.1 of LIS Datriyal from the motor assembly and dismantling the pump from the base frame at site. Carriage of the dismantled 03cusec Horizontal casing pump set, to the nearest roadside approx.400m using manual labour, head load to nearest road side, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to the 03 cusec Split casing pump set at workshop by way of dismantling for extraction of damaged internal parts. Repairs to the damaged pump shaft by way of re-metalling, turning, straightening, & finishing to accurate size, threading at ends and making of new key way. Repair to impeller by way of brazing, turning and finishing to accurate size including making of new key way of the same size and specifications. Providing and fitting of new bush- 02 Nos. , new check nuts, new gland rings-02 nos., new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, re-assembling of pump at workshop after carrying out necessary repairs and then back carriage to the LIS. Fitting/reinstallation at the base frame, coupling and making proper alignment of the pump motor and testing on part/full load at site. Job also includes Providing and fitting of new coupling nuts/bolts & rubber bushes. Complete job including cost of material and labour charges. Complete Job
Rebate on Old Parts
Replacement of worn out parts of 5 cusec pumping unit no.5 along with allied works at LIS Batera.
Decoupling of 5cusec x 24m head Horizontal split casing pump of unit no.5 from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled pump set by using manual labour, head load to the nearest roadside, loading in transport vehicle, carriage to the workshop in the mechanical transport. Dismantling of 5cusec Split casing pump set at workshop by way of extraction of damaged internal parts. Replacement of old damaged impeller as per sample and fitting of the same. Job includes rectification of pump shaft by way of welding, turning, aligning, threading at ends and making of new keyways and straightening of the same to proper size. Replacement of old bushes-2 Nos., check nut, gland rings, bearings as per sample, studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembling of pump set. Shifting back to the LIS Batera after carrying out necessary replacements at workshop and then fitting/reinstallation at the base frame, coupling with the motor by making proper alignment and testing on partial/full load. Complete job including cost of material and labour charges etc. C/job
Rebate on Old Parts
TRIKUTA ELECTRICAL AND MECHANICAL WORKS
BEE AAR ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .