Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹2.8 L | L1 | Accepted-AOC AOC |
| 2 | L2₹2.9 LRejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹2.9 L | L2 | Rejected-AOC Not L1 bidder |
| 3 | L3₹2.9 LRejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹2.9 L | L3 | Rejected-AOC Not L1 bidder |
| Sl No | Description | Qty | Unit | TRIDEO CONSTRACTION L1 | TRIBHUWAN ENTERPRISES L3 | A.K. ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | I. 133B -240m belt changing . (a)Shifting of new belt | 4.72 | MT | 1,400 ₹6,605.20 | 1,450 ₹6,841.10 | 1,420 ₹6,699.56 |
| 2.00 | (b) Dismantling of old belt and Lifting of take-up arrangment | 6.4 | MT | 2,150 ₹13,766.45 | 2,200 ₹14,086.60 | 2,160 ₹13,830.48 |
| 3.00 | (c) Dismantling of take-up arrangement and Installation of new belt. | 7.89 | MT | 4,200 ₹33,142.20 | 4,250 ₹33,536.75 | 4,220 ₹33,300.02 |
| 4.00 | (d) Shifting of old belt at site. | 3.23 | MT | 1,400 ₹4,522 | 1,450 ₹4,683.50 | 1,420 ₹4,586.60 |
| 5.00 | II. 116B -222m belt Changing (a)Shifting of new belt | 4.37 | MT | 1,400 ₹6,111 | 1,450 ₹6,329.25 | 1,420 ₹6,198.30 |
| 6.00 | (b) Dismantling of old belt and Lifting of take-up arrangment | 5.98 | MT | 2,150 ₹12,859.15 | 2,200 ₹13,158.20 | 2,160 ₹12,918.96 |
| 7.00 | (c) Dismantling of take-up arrangement and Installation of new belt. | 7.36 | MT | 4,200 ₹30,903.60 | 4,250 ₹31,271.50 | 4,220 ₹31,050.76 |
| 8.00 | (d) Shifting of old belt at site. | 2.99 | MT | 1,400 ₹4,183.20 | 1,450 ₹4,332.60 | 1,420 ₹4,242.96 |
| 9.00 | III.118B -60m belt changing (a) Shifting of new belt and old belt at site | 1.99 | MT | 1,400 ₹2,783.20 | 1,450 ₹2,882.60 | 1,420 ₹2,822.96 |
| 10.00 | (b) Dismantling of old belt | 0.81 | MT | 2,150 ₹1,737.20 | 2,200 ₹1,777.60 | 2,160 ₹1,745.28 |
Tender Value
₹2.8 L
EMD Value
₹3,500
Closing Date
3 Mar 2026, 6:00 pmClosed
ANOOP KUMAR SINGH
KEDLA WASHERY
Belt changing of BC-133B, BC-116B, BC-118 and snub drum lagging work of BC 133B and fixing of derailed re-installation of conveyor 118A repairing of Pre Washery.
2026_CCL_353753_1
PO/KW/E-Tender/25-26/88 Date 19.02.2026
Open Tender
Electrical and Maintenance Works
7 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
24 Apr 2026
19 Feb 2026
5 Mar 2026
20 Feb 2026
3 Mar 2026
20 Feb 2026
20 Feb 2026 - 26 Feb 2026
I. 133B -240m belt changing . (a)Shifting of new belt
(b) Dismantling of old belt and Lifting of take-up arrangment
(c) Dismantling of take-up arrangement and Installation of new belt.
(d) Shifting of old belt at site.
II. 116B -222m belt Changing (a)Shifting of new belt
(b) Dismantling of old belt and Lifting of take-up arrangment
(c) Dismantling of take-up arrangement and Installation of new belt.
(d) Shifting of old belt at site.
III.118B -60m belt changing (a) Shifting of new belt and old belt at site
(b) Dismantling of old belt
(c) Installation of new belt
IV. 133B 04 Nos. snub drum lagging (a) Take-up lifitng/dismantling cost.
(b) Take-up installation cost.
V. 118A de-railted carriage re-installation (a) Re-installation cost.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_366561.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid