Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B 403 BHARTI VIHAR S NO 78 BHARTI VIDYAPITH CAMPUS KATRAJ PUNE PUNE MAHARASHTRA 411046 | PUNE | MAHARASHTRA | 411046 | Admitted-Finance |
| 2 | Admitted-Finance 93A JANAKI ENCLAVE SAROORNAGAR HYDERABAD HYDERABAD TELANGANA 500035 | RANGA REDDY | TELANGANA | 500035 | Admitted-Finance |
Tender Value
₹33 L
EMD Value
₹33,000
Closing Date
2 Aug 2023, 12:00 pmClosed
SE EDC-1 Azamgarh
Hydle colony Sidhari Azamgarh
Engagement of BEE accredited Energy Audit Agency for conduct of Energy Audit in PuVVNL.
2023_PVVNV_820104_1
30-EDC I (A)/(MD)/PUVVNL/CE(Com)/2023
Open Tender
Electrical Works
Item Rate
365 days
Discom Varanasi
see term and condition
2 documents required · 2 mandatory
₹3,540
EE ETD-1 Azamgarh
₹33,000
10 Aug 2023
15 Jul 2023
2 Aug 2023
15 Jul 2023
2 Aug 2023
15 Jul 2023
15 Jul 2023 - 2 Aug 2023
Amount
Validation of feeder data in 11 KV Metering Points (Approximately 4616 11 KV Feeders and 2900 11 KV Consumers ) The rate will be paid when above are completed without any valid objection of incharge of each test division
Validation of energy flow data and losses by checking functional and communication status of meters at: The rate will be paid when three subcomponents of above are completed without any valid objection of incharge of each test division
1. DISCOM’s input energy metering points (Transmission Source Points)
Validation of energy flow data and losses by checking functional and communication status of meters for all Divisions with AT&C losses greater than 25% (Nos of Distribution Divisions -85 )
Verify metering and connection status of Agriculture (Metered and Un-metered), Govt. category connection (ULB, RLB etc.), and LT Industrial of consumers (Considering 40000 Consumers)
DTs where communicable meters were already installed (For approximately 7500 DTs)
Foot survey of feeders to check for thefts/ hooking (Assuming 40 Nos 11 KV Feeders and 30 Nos Locations having theft on each feeders )
Computation of AT&C losses for each division (for 96 Divisions): 1. Input energy data: 2. Billing and collection data: 3. Computation of distribution loss, collection efficiency and AT&C loss at a division level 4. Identify high-loss divisions and network segments: 5. Identify overloaded segments/ infrastructure: The rate will be paid when all five subcomponents of above are completed without any valid objection of incharge of each distribution division
Computation of subsidy assessed based on energy accounting data (for 96 Divisions): 1. Computation of category wise subsidy: 2. Computation of Average Billing Rate (ABR): The rate will be paid when both subcomponents of above are completed without any valid objection of incharge of each distribution division
Submission of Quarterly Report to BEE by Conducting Annual Energy Audit with necessary Pre-requisites and reporting requirements as per the regulation of BEE by Accredited Energy Auditor (AEA) Certified by BEE
Submission of Annual Report to BEE by Conducting Annual Energy Audit with necessary Pre-requisites and reporting requirements as per the regulation of BEE by Accredited Energy Auditor (AEA) Certified by BEE, complete in all respect.
PPS Energy Solutions Private Limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .