Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | +9.77% | ₹5.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.0 L+₹1.6 L (28.5%)Admitted-Fee/PreQual/Technical/Finance | +41.00% | ₹7.0 L+₹1.6 L (28.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.2 L+₹1.8 L (32.1%)Admitted-Fee/PreQual/Technical/Finance | +45.00% | ₹7.2 L+₹1.8 L (32.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-As per Bye laws, vide S.No. 3 the working area of the Society is limited to Madhuban village |
Tender Value
₹5.9 L
Closing Date
8 May 2026, 5:00 pmClosed
ACE, SIJUA
OFFICE OF ACE, SIJUA
Cleaning of existing, Drain no.1 and Drain No- 07/10 of Tetulmari colliery under Sijua area
2026_BCCL_359010_1
GM/SA/Civil/2026-27/eNIT-04
Open Tender
Civil Works - Others
Percentage
20 days
Tetulmari
Please refer Tender document
4 documents required · 4 mandatory
Exempted
30 Jul 2026
4 May 2026
9 May 2026
4 May 2026
8 May 2026
4 May 2026
4 May 2026 - 8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Item Description/ Heading | |||||
| 1(A) Painting and Upkeep Work | |||||
| 1.01 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 3,600 | sqm | 20.4 | ₹73,440 |
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. sqm 10.50 | 3,600 | sqm | 10.5 | ₹37,800 |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1,731.68 | cum | 154.9 | ₹2,68,237.23 |
| 1.04 | Carriage of Materials by mechanical transport including loading, unloading and stacking : | 519.5 | cum | 179 | ₹92,991.22 |
| 1.05 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. | 1.46 | cum | 4,419.25 | ₹6,452.11 |
| 1.06 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :Flush/ Ruled pointing | 7.29 | sqm | 248.5 | ₹1,811.57 |
| 1.07 | Supplying of labour for Cleaning of culvert etc. | 30 | Each | 619.85 | ₹18,595.5 |
| 1.08 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.32 MB
BOQ_371880.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .