Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC 512 CHITTILAKATTU IRIPANAM TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.7 L+₹2,700 (0.57%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.8 L+₹6,400 (1.36%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹4.8 L+₹9,500 (2.02%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹5.3 L+₹58,000 (12.3%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
2 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Suraj Kumar Singh
AM D P AND P FACT LTD
RLNG Conversion of Dryer A and B in NP Plant,FACT CD during ATA 21.
2021_FACT_610419_1
04096/2020-2021/E22831
Limited
Miscellaneous Works
Item Rate
120 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM105A)
3 documents required · 3 mandatory
₹0
₹12,000
Yes
1 Mar 2021
18 Jan 2021
3 Feb 2021
18 Jan 2021
2 Feb 2021
18 Jan 2021
180 days
RLNG Conversion of Dryer A & B in NP Plant,FACT CD during ATA 21
Fabrication of Front End Plate of Dryer Combustion Furnace A & B: Necessary site arrangements,collection and transportation of required tools and tackles,materials,Plate (ASTM A 516 GR 70,10mm Thick),Structural etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] to the site for carrying out the fabrication of Front End Plate of Dryer Combustion Furnace A & B.The work shall be carried out strictly as per M/s.FACT CD Drawing no.TS/M/N-334 R1 dated 28.06.1999,M/s.FCS (P) LTD Drawing no.19-4163-02-A01 R4 dated 31.07.2020 and as per the instruction of Engineer-in-charge.Marking,cutting,Edge preparation with single/double bevel and proper grinding,fit up and tack welding of the 10 mm thick plate shall be carried out as per the above said drawings and instruction. Burner mounting plate from the new Burner Unit assembly shall be dismantled and to be fixed on this fabricated Front End plate by tack welding after obtaining the fit up.On getting clearance,Root weld of the joints and DP test shall be carried out.Defects found, if any, during testing shall be rectified as per the instruction of Engineer-in-charge.After inspection Full welding of the joint and chipping shall be carried out properly.Necessary structural stiffeners,Inspection door and Erection hooks with pad plate (to facilitate the erection) shall be welded on the plate and thus complete the fabrication work.Site cleaning,Transportation of unused plates/structural/scrap to area ear marked/scrap yard shall be in the scope of the contractor. Two nos. Front End plate unit assembly to be fabricated ( One for each stream of NP Plant) and approximate weight of one unit is 01 MT.Quantity indicated in the schedule is approximate and weight of the finished unit shall be calculated for finalizing the quantity.
Fabrication of Air Duct for Dryer Combustion Furnace A & B: Necessary site arrangements,collection and transportation of required tools and tackles,materials,Plate (MS Plate 6/8 mm thick),Structural etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] to the site for carrying out the fabrication of Air Duct for Dryer Combustion Furnace A & B.The work shall be carried out strictly as per M/s.FCS (P) LTD Drawing no.19-4163-02-A03 R2 dated 30.06.2020 and as per the instruction of Engineer-in-charge.Marking,cutting,Edge preparation with single bevel and proper grinding of the MS plate shall be carried out as per the above said drawing and instruction.Rolling of the plate shall be carried out to acheive the required duct dimension.Rolled duct pieces shall be aligned properly and the correct fit up to be achieved.Required Miter Elbows shall be fabricated as per the said drawing and to be tack welded to the duct piece.Tansition duct piece from Air Duct outlet to Burner Windbox inlet shall be fabricated by the contractor as per the drawing and proper alignment on either ends to be achieved.Duct pieces along with Miter elbows and transition piece with perforated plate shall be tack welded to form the required length of duct as per available drawing. Provision for installing Annubar and manual measurement points for flow measurement in the duct shall be provided as per the instruction.After getting clearance,Root weld of the joints and DP test shall be carried out.Defects found, if any, during testing shall be rectified as per the instruction of Engineer-in-charge.After inspection Full welding of the joint and chipping shall be carried out properly.Necessary erection hook with pad plate, as per standards shall be welded on each piece to facilitate the erection at high altitude site.Additional ducts/mitre elbows required to be fabricated for successful completion of the work shall also be under the scope of contractor.Site cleaning and Transportation of unused plates/structural/scrap to area ear marked/scrap yard shall be done by the contractor. Two nos. Air Duct unit assembly to be fabricated ( One for each stream) and approximate weight of one unit is 01 MT having length 15 m (approx.).Quantity indicated in the schedule is approximate and weight of the finished unit shall be calculated for finalizing the quantity.
Dismantling and Transportation of Existing Front End plate of Combustion furnace,Air Duct,Unwanted structural & pipeline and Metal scrap to Scrapyard/earmarked area [For both the streams A & B]:- Required tools & tackles,Chain Pulley blocks and other materials shall be collected from Workshops/Tool crib for the safe dismantling of existing front end plate of the furnace and its accessories.After getting Clearance from Process Dept.,necessary arrangements of scaffolding shall be done with proper scaffolding pipes and clamps as per I S standard and as per the site condition.The exisitng burner unit shall be dismantled properly as per the instruction.After the removal of inside refractory lining of the furnace by Civil Dept.,the Front end plate of the furnace shall be removed by cutting / grinding, after providing temporary supports where ever neccessary. Removal of Refractory lining is NOT IN the scope of the contractor. Cutting and removal of the exisiting Air Duct, unwanted Pipe line & structural shall also be done by the contractor in the same manner, after getting proper clearance and as per the instruction of Engineer in Charge.The dismantled units shall be transported to scrap yard after cutting the same into number of pieces for easy handling.The site shall be cleaned after the work. All the scrap materials to be removed from the site and shall be transported to scrap yard and deposited in the appropriate area earmarked. Removal of unwanted structural/pipeline,if any,collection,transportation and loading/unloading of scrap material generated during the work/unused plates/pipe/strucutural etc to scrap yard/area earmarked and final site cleaning for acheiving the successful completion of the subject work of RLNG conversion of Dryer in NP Plant,shall be under the scope of the contractor.
Transportation and Erection of BMS Panel: Necessary site arrangements,collection and transportation of required tools and tackles,Chain Pulley Blocks,materials etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] for carrying out the Transportation and Erection of BMS Panel.After getting clearence,BMS Panel shall be transported from Stores Dept. to site,unloaded from trailer,lead to Dryer floor of NP plant and shall be Erected in site with fabricated structural base frame as per the instruction of Engineer-in-charge.Necessary works to be carried out for acheiving correct Level and orientation of the BMS panel shall be in the scope of contractor. Two nos. BMS Panel assembly to be erected ( One for each stream of NP Plant) and approximate weight of one unit is 2.5 MT.
Transportation and Erection of RLNG Skid Assembly: Necessary site arrangements,collection and transportation of required tools and tackles,Chain Pulley Blocks,materials etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] for carrying out the Transportation and Erection of RLNG Skid Assembly.After getting clearence,RLNG Skid Assembly shall be transported from Stores Dept. to site,unloaded from trailer,lead to Skid platform at Dryer floor of NP plant and shall be Erected in the skid platform as per the instruction of Engineer-in-charge.Necessary works to be carried out for acheiving correct Level and orientation of the Skid assembly in the paltform,fixing of skid assembly in the platform by means of welding/bolting shall be in the scope of contractor. Two nos. RLNG Skid Assembly to be erected ( One for each stream of NP Plant) and approximate weight of one unit is 1 MT having dimension 7.5x1.5 m.
Transportation and Erection of Burner Unit Assembly: Necessary site arrangements,collection and transportation of required tools and tackles,Chain Pulley Blocks,materials etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] for carrying out the Transportation and Erection of Burner Unit Assembly.After getting clearence,Burner Unit Assembly shall be transported from Stores Dept. to site,unloaded from trailer,lead to Dryer floor of NP plant.Transported Burner unit shall be bolted to the fabricated Front End Plate of Dryer Combustion Furnace as per M/s.FCS (P) LTD Drawing no.19-4163-02-A01 R4 dated 31.07.2020 and as per the instruction of Engineer-in-charge.The entire unit shall be erected in the shell of Dryer combustion furnace after achieving correct centering,orientation and fit up of shell and burner unit (by tack welding).Necessary edge preparation with single/double bevel and proper grinding for acheiving this shall be done by the contractor on both side (shell end side and front end plate side).On getting clearance,Root weld of the joints and DP test shall be carried out.Defects found, if any, during testing shall be rectified as per the instruction of Engineer-in-charge.After inspection Full welding of the joint and chipping shall be carried out properly.Necessary structural stiffeners and Inspection door shall be welded on the plate and thus complete the work. Two nos. Burner Unit Assembly to be erected ( One for each stream of NP Plant) and approximate weight of one unit is 1 MT.
Transportation and Erection of Air Duct: Necessary site arrangements,collection and transportation of required tools and tackles,Chain Pulley Blocks,materials etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] for carrying out the Transportation and Erection of Combustion Air Duct.After getting clearence,Air Duct Assembly shall be transported from fabriaction yard to site,unloaded from trailer,lead to Dryer floor of NP plant and shall be Erected as per M/s.FCS (P) LTD Drawing no.19-4163-02-A03 R2 dated 30.06.2020 and as per the instruction of Engineer-in-charge.Hook up joint area at Burner wind box inlet and Blower outlet shall be bevelled before welding.Necessary temporary supports shall be provided for the hook up.For acheiving correct alignment and fit up of the duct necessary spool pieces,miter elbows shall be fabricated by the contractor.After acheiving the correct fit up ( by tack weldng) and on getting clearance,Root weld of the joints and DP test shall be carried out.Defects found, if any, during testing shall be rectified as per the instruction of Engineer-in-charge.After inspection Full welding of the joint and chipping shall be carried out properly. Two nos. Air Duct unit assembly to be Erected ( One for each stream) and approximate weight of one unit is 01 MT having length 15 m (approx.)
Fabrication and Erection of Structural Support:- Necessary site arrangements,collection and transportation of required tools and tackles,materials,Plate,Structural etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] to the site for carrying out the fabrication and erection of new structural supports including,Base frame for BMS Panel,Pipe supports,saddle supports,Support for Air duct & vent lines etc. shall be fabricated and erected as per relevant drawings and instruction of Engineer- in -charge to meet site requirement.All welding joints shall be full welded with proper edge preparation.Strengthening of exisiting supports and providing temperory supports necessary for the successful completion of the job shall be in the scope of contractor.
Fabrication and Erection of CS/SS Pipe:- Necessary site arrangements,collection and transportation of required tools and tackles,materials,Pipe etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] to the site for carrying out the fabrication and erection of CS/SS Pipe in connection with the subject work.Necessary fabrication and erection of pipe line works includes but not limited to the required modification works in existing RLNG line & RLNG skid assembly,establishing connection between existing RLNG line to Skid inlet,Instrument Air lines to Skid assemby, BMS Panel & Burner unit and Skid to BMS Panel,RLNG Pilot line to Burner unit from skid assembly,providing necessary vent lines,drain lines & spool pieces,modification/re-routing of exisiting pipelines etc. shall be done with necessary fittings and with out any leakage to suit the site condition & as per the instruction of Engineer in charge.Erection of the pipeline shall be carried out without any strain and the rework required if any, for achieving this shall be carried out by the contractor. Pipe size vary from 15NB to 150 NB.
Installation of Valves/Hoses/elbows etc. and assistance for purging/flushing/leakage test. Necessary site arrangements,collection and transportation of required tools and tackles,materials,Valves,Flexible hoses etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] to the site for carrying out installation and hook up of Valves,Flexible Hoses,Elbows etc. required for the sucessful completion of the subject work.Dismantling/installation of Valves/Hoses/elbows etc. as per relevent drawing and as per the instruction of Engineer in charge shall be in the scope of the contractor.Installing Valves/Hoses/elbows etc. shall be done by Bolting (with proper gasket)/welding as per instruction and leak free joints shall be acheived. Necessary dismantling/fixing back of flanges,valves etc. required for purging/flushing/leakage test of the entire RLNG system for the sucessful completion of the project as per the instruction of engineer in charge shall be in the scope of contractor. Size vary from 15 NB to 150 NB
M A ALI
M A Shamsudeen
GOPINATHA PANICKER ENGINEERING CONTRACTOR
PAREETH V V
BASHEER V P
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_641584.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .