Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.3 L+₹36,665.62 (12.5%)Rejected-Finance | ₹3.3 L+₹36,665.62 (12.5%) | L2 | Rejected-Finance L2 rejected |
| Sl No | Description | Qty | Unit | ARUNLAL C L1 | CHRISTUDAS L L2 |
|---|---|---|---|---|---|
| 1.00BUILDING MAINTENANCE | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1.6 | cum | 1,935.5 ₹3,094.86 Lowest | 2,177.17 ₹3,481.29 |
| 1.00 | OD120019/2026-2027: DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.created from spec 60.7.3 | 1.51 | cum | 688.41 ₹1,042.94 Lowest | 774.36 ₹1,173.16 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 2.88 | cum | 326.9 ₹940.16 Lowest | 367.72 ₹1,057.56 |
| 1.00 | OD114285/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.Spec derived from 60.7.1 | 1.42 | cum | 3,629.08 ₹5,153.29 Lowest | 4,082.21 ₹5,796.74 |
| 1.00 | OD120024/2026-2027:DRY RUBBLE MASONRY(DEPARTMENTAL) _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.Spec derived from 60.7.1 | 1.14 | cum | 1,868.06 ₹2,122.12 Lowest | 2,101.31 ₹2,387.09 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.8 | cum | 7,582.19 ₹13,670.69 Lowest | 8,528.9 ₹15,377.61 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 4.9 | sqm | 693.28 ₹3,394.3 Lowest | 779.84 ₹3,818.1 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.46 | cum | 9,531.73 ₹4,375.06 Lowest | 10,721.86 ₹4,921.33 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1.31 | cum | 289.41 ₹380 Lowest | 325.55 ₹427.45 |
Tender Value
₹3.3 L
EMD Value
₹8,258
Closing Date
13 Aug 2026, 5:00 pmClosed
Biju D
O/o EE, TMC
Annual Plan-TVM Corporation -Pro.No.706/27-Transferred Institution maintenance-Balance work for the maintenance of Centre No.33 Subhash Nagar Anganawadi in Powdikkonam ward in Sreekariyam zonal-General Civil Work
2026_LSGD_864123_2
03/E16/EEN/5397741/2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram Corporation
Please refer Tender documents.
7 documents required · 7 mandatory
₹730
Yes
₹8,258
Yes
14 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING MAINTENANCE | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.002 | OD120019/2026-2027: DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.created from spec 60.7.3 | 1 | cum | - | - |
| 1.003 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.004 | OD114285/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.Spec derived from 60.7.1 | 1 | cum | - | - |
| 1.005 | OD120024/2026-2027:DRY RUBBLE MASONRY(DEPARTMENTAL) _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.Spec derived from 60.7.1 | 1 | cum | - | - |
| 1.006 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.008 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.009 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1462084.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.02 MB
BOQ_1462084.xls
BOQ • 0.34 MB
viewsbd.pdf
Tender Documents • 2.07 MB
prelim.pdf
Tender Documents • 0.12 MB
fot.pdf
Tender Documents • 0.01 MB
affida.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .