Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | Admitted-Finance |
Tender Value
₹19.7 L
EMD Value
₹19,700
Closing Date
3 Jan 2024, 3:00 pmClosed
Block Development officer BP
Panchayat Union Manapparai
Construction of 6.00 M Span RCC Slab Culvert at K.Udayapatti - Mahilipatti Uppathuvarri in Kannudaiyanpatti Panchayat Manapparai Block in Tiruchirappalli District under CSR - 2023-24
2023_RDTN_403012_1
A2/2156/2023 dt 22.12.2023
Open Tender
Civil Works - Bridges
Item Rate
60 days
manapparai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹19,700
4 Jan 2024
26 Dec 2023
3 Jan 2024
26 Dec 2023
3 Jan 2024
26 Dec 2023
Amount
Construction of 6.00 M Span RCC Slab Culvert at K.Udayapatti - Mahilipatti Uppathuvarri in Kannudaiyanpatti Panchayat Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Cement concretein C M 1:3:6 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoringshutteringbalingout water etc., complete For Abutment &wing
Supplying & fabrication of steel for RCC works including cost and conveyance of steel to site including labour charges for cutting bending and tying rods and placing the grills in position for premeasurement asper steel schedule.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for arrangement all includingcharges etc., completefor Deck Slablabour with centering
Centering charges for the deck slab bottom to site including labour charges etc complete
Bottom
Providing and Fixing Tar Paper for bearing between Bed Block & Deck Slab in etc
Providing Weep Holes in brick Masonary Stonee masonary Plain Reinforced Concrete Abutment Wing Wall Return Wall Etc Complete
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CSR CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .