Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.2 LAccepted-AOC | L1 | Accepted-AOC Being a Lowest | |
| 2 | L2₹48.7 L+₹4.6 L (10.3%)Rejected-Finance CONTR VILL MATLA PO ROPA TEHSIL SAINJ DISTT KULLU HP | L2 | Rejected-Finance Being a 2nd Lowest | |
| 3 | L3₹49.6 L+₹5.5 L (12.4%)Rejected-Finance NEAR NEW BRIDGE PARLA BHUNTER DISTT KULLU H P | BHUNTAR | KULLU | HIMACHAL PRADESH | L3 | Rejected-Finance Being a 3rd Lowest | |
| 4 | L4₹49.9 L+₹5.7 L (13.0%)Rejected-Finance | L4 | Rejected-Finance Being a 4rth Lowest | |
| 5 | L5₹49.9 L+₹5.8 L (13.1%)Rejected-Finance S O SH BHAWANI SINGH VPO BHRAIN TEHSIL BHUNTAR DISTT KULLU HP PIN 175125 | KULLU | HIMACHAL PRADESH | 175125 | L5 | Rejected-Finance Being a 5th Lowest |
| Sl No | Description | Qty | Unit | RANDHIR JAMWAL L5 | PANKAJ GUPTA L6 | GIRDHARI LAL L2 | Mohinder Rana L4 | kotkandiconstructionpvt.ltd. L3 | varnag banasari infra construction pvt ltd L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc. in earth work in all kinds of soil such as pick jumper work, blasting work and hard blasting work saturated soil including chiselling here blasting is not possible or any other mixed variety of soil dewatering and removal of slush and other incidentials lift upto any height stacking the excavated soil upto any lead from the edge of excavation and then returning the stacked soil in 15cm (Fifteen centimetre) thick layer when required into plinths si des of foundations etc. consolidating each osited layer by ramming and watering and then disposing of al surplus excavated earth with in all leads and lift of materials and as per direction of Engineer-in-charge. | 115.54 | Per Cubic metre | 150 ₹17,331 Lowest | 200 ₹23,108 | 190 ₹21,952.6 | 170 ₹19,641.8 | 200 ₹23,108 | 200 ₹23,108 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:3:6 (1 Cement : 3 coarse sand) : 6 gradedstone aggregate 20 mm (Twenty millimetre) nominal size) with in all leads and lift of materials and as per direction of Engineer-in-charge. | 6.44 | Per Cubic metre | 3,650 ₹23,506 Lowest | 5,000 ₹32,200 | 4,500 ₹28,980 | 4,200 ₹27,048 | 4,800 ₹30,912 | 4,000 ₹25,760 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4: (1 Cement : 4 coarse sand) : 8 gradedstone aggregate 20 mm (Twenty millimetre) nominal size) with in all leads and lift of materials and as per direction of Engineer-in-charge. | 4.32 | Per Cubic metre | 3,550 ₹15,336 Lowest | 4,500 ₹19,440 | 4,500 ₹19,440 | 4,000 ₹17,280 | 3,950 ₹17,064 | 3,800 ₹16,416 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for with in all leads and lift of materials and as per direction of Engineer-in-charge. (a) foundation, footing bases of columns, etc. for mass concrete | 38.16 | Per Square metre | 260 ₹9,921.6 | 200 ₹7,632 | 200 ₹7,632 | 180 ₹6,868.8 Lowest | 300 ₹11,448 | 350 ₹13,356 |
| 5.00 | b) lintels, beams, plinth beams, girdirs , bressumers and cantilevers | 136.4 | Per Square metre | 320 ₹43,648 | 400 ₹54,560 | 280 ₹38,192 Lowest | 380 ₹51,832 | 450 ₹61,380 | 375 ₹51,150 |
| 6.00 | c) Column pillar post and structs | 34.68 | Per Square metre | 330 ₹11,444.4 Lowest | 500 ₹17,340 | 400 ₹13,872 | 470 ₹16,299.6 | 450 ₹15,606 | 375 ₹13,005 |
| 7.00 | d) Suspended floor, roofs, landing, balconies and access platform etc. | 23.1 | Per Square metre | 340 ₹7,854 Lowest | 500 ₹11,550 | 400 ₹9,240 | 460 ₹10,626 | 450 ₹10,395 | 450 ₹10,395 |
| 8.00 | e) Edges of slab and breaks in floors and walls 20 cm (Twenty centimetre) wide. | 19.4 | Per Running metre | 150 ₹2,910 | 19 ₹368.6 Lowest | 300 ₹5,820 | 190 ₹3,686 | 100 ₹1,940 | 100 ₹1,940 |
| 9.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- all works up to plinth level: 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm (Twenty millimetre) nominal size) with in all leads and lift of materials and as per direction of Engineer-in-charge. | 2.27 | Per Cubic metre | 6,450 ₹14,641.5 | 5,500 ₹12,485 | 5,500 ₹12,485 | 5,000 ₹11,350 Lowest | 6,600 ₹14,982 | 6,500 ₹14,755 |
| 10.00 | Providing and laying mechanically mixed and vibrated reinorced cement concrete 1:1.5:3 ( one cement :one and half sand : three graded crushed stone aggregate 20mm (Twenty milimetre) nominal size and curing complete excluding cost of form work and einforcement for reinforced cement concrete work in Columns, pillars, posts and struts up to any floor level and hauling/ carriage of all labour equipements and materials to various locations through all modes of transportations with in all leads and lift of materials and as per direction of Engineer-in-charge. | 45.68 | Per Cubic metre | 6,850 ₹3,12,908 | 9,500 ₹4,33,960 | 8,500 ₹3,88,280 | 9,000 ₹4,11,120 | 7,300 ₹3,33,464 | 6,500 ₹2,96,920 Lowest |
Tender Value
₹55.5 L
EMD Value
₹1.1 L
Closing Date
13 Apr 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ER. V. K. HAZRI
EE KULLU DIVISION HP PWD KULLU
Extension and special repair of NCC Hanger at Bhunter Airport SH Building portion including Civil work, water supply and sanitary installation etc.
2023_PWD_72001_1
No.260-75 dated 06.04.2023
Open Tender
Civil Works - Buildings
Item Rate
60 days
KULLU
AS REFER TO BIDD DOCUMENTS
9 documents required · 9 mandatory
₹2,000
EE KULLU DIVISION
₹1.1 L
Yes
13 Nov 2026
6 Apr 2023
17 Apr 2023
6 Apr 2023
13 Apr 2023
6 Apr 2023
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .