Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-AOC | ₹1.8 L | 1 | Accepted-AOC Award of Contract has been issued in favour of M/s. Z. L. CONSTRUCTION PVT LTD (BID ID -8291106) |
| 2 | 2₹1.9 LRejected-AOC | ₹1.9 L | 2 | Rejected-AOC EMD may be released if paid Online. |
| 3 | 3₹2.3 LRejected-Finance | ₹2.3 L | 3 | Rejected-Finance L3 |
| 4 | 4₹2.3 LRejected-Finance 25 NEW MALLICK COLONY PAT BARI LANE KOLKATA 57 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700057 | ₹2.3 L | 4 | Rejected-Finance L4 |
| 5 | 5₹2.3 LRejected-Finance 35 P C SEN STADIUM BUILDING JANNAGAR ROAD MAHESH SERAMPORE HOOGHLY 712202 | SERAMPORE | HOOGHLY | WEST BENGAL | 712202 | ₹2.3 L | 5 | Rejected-Finance L5 |
Tender Value
₹2.3 L
EMD Value
₹4,581
Closing Date
12 Mar 2026, 6:55 pmClosed
MANAGING DIRECTOR
West Bengal Livestock Development Corporation Ltd. Bldg. No. 2, LB-2, Sector- III, Salt Lake City, Kolkata - 700106
Repair of Worn-out Floor at 4th Floor Mini Conference Room of the ARD Department and other allied Plumbing Works at Wash Room Area at H.Q. Prani Sampad Bhaban, LB-2, Sector-3, Salt Lake City, Kolkata 700106.
2026_ARD_1014425_1
WBARD/WBLDC/NIT-1012e/2025-26 Dated 23/02/2026
Open Tender
Miscellaneous Works
Percentage
30 days
H.Q. Prani Sampad Bhaban, LB-2, Sector-3, Salt Lake
SITE VISIT- 02/03/2026 (Mandatory) (from 12-00 Noon to 1-30 P.M.) PRE BID MEETING (Mandatory) TO BE HELD ON 05/03/2026 at 11-30 A.M., H.Q. (West Bengal Livestock Development Corporation Ltd. Bldg. No. 2, LB-2, Sector- III, Salt Lake City, Kolkata)
8 documents required · 8 mandatory
₹0
₹4,581
Yes
H.Q., Salt Lake City, Kolkata - 700106
18 Aug 2026
26 Feb 2026
14 Mar 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
26 Feb 2026 - 12 Mar 2026
5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling carefully wooden walling, flooring of ceiling and stacking dismantled materials as directed | - | SQM | 14 | - |
| 1.02 | Supplying, fitting and fixing 8mm thick Laminated wooden Flooring Work conforming to EN13329:2006 with plank size not Iess than 1200mmX 190 mm (with unilin/tongue-roove locking arrangement) having 0.2mm thk top abrasive layer over a decorative layer followed by a High-density fibreboard (HDF) having density > 940 kg/m3 substrate core ver a rasin saturated backing layer and installing through unilin or tongue- groove system (having locking strength not less than 1000 kg/m) over a 2 mm thk underlayer polyurethene foam on polythene sheet 250 micron, over a smooth, flat, hard subfloor free from moisture (< 8%), grease etc. complete in all respect with requisite accessories like end profile, transition profile, reducer 'T' profile etc. wherever required and preparation of base including all other incidental works as per direction & satisfaction of Engineer in charge. Cost of Laminate Floor Accessories only (Skirting,End edge, T- moulding,Reducer )shall have to be added separately, wherever required. ln Ground FIoor: ategory: High Footfall ; Class- 23;Abrasion resistance:-AC4 Thk on Swelling:- < 15% ;Impact resistance:- IC 2 Add extra for each addl, floor over the rate for Ground Floor
(I) upto 4 th floor- Rs. 12/-per Sq.m | - | SQM | 1,323 | - |
| 1.03 | Supplying Laminate Floor Accessories (Skirting, End edge, Tmoulding, Reducer ) to 8mm thick Laminated wooden Flooring Work conforming to EN13329:2006 with plank size not Iess than 1200mmX 190 mm (with unilin/tongue-groove locking arrangement) having 0.2mm thk top abrasive layer over a decorative layer followed by a High-density ibreboard(HDF) having density > 840 kg/m3 substrate core over a rasin saturated backing layer and installing through unilin or tongue- groove system (having locking strength not less than 1000 kg/m) over a 2 mm thk underlayer polyurethene foam on polythene sheet 250 micron, over a smooth, flat, hard subfloor free from moisture (< 8%), grease etc. complete in all respect as per direction & satisfaction of Engineer in charge. Cost of labour charge for fitting & fixing of Laminate Floor Accessories only (Skirting,End edge, - moulding,Reducer )shall have to be added separately, wherever required. (Note: This work should not be executed without specific permission of Superintending ngineer). ln Ground FIoor: Catagory: Normal/High Footfall Add extra for each addl, floor over the rate
for Ground Floor
(I) upto 4 th floor- | - | mtr. | 349 | - |
| 1.04 | A) Supplying & laying of approved brand of scratch proof, semi flexible P.V.C. blended homogeneous marble Vinyle flooring in tiles conforming to IS:3461, fixing with synthetic acrylic adhesive after preparing the floor, levelling & smothaning when necessary with suitable putty, as per the design & instruction of the Engineer-in-charge.
2 mm thick | - | SQM | 578 | - |
| 1.05 | Taking out carefully tiles from floor stacking seviceable tiles at site and removing rubbish as directed within a lead of 75m. | - | SQM | 62 | - |
| 1.06 | Supplying and laying true to line and level Anti-Skid, Full Body, Homogeneous & Granular finish Vitrified Tiles conforming to IS:15622-2006 & IS 4457-2007 and testing shall be made in accordance with IS:13630 [Non- modular sizes for tiles with Skid resistance > 0.5, Mohr's hardness > 5.0, Staining resistance: Class-1, Water Absorption: E < 0.5%], MOR > 35 N/sq.mm in Internal area of building e.g. Toilet Block, Passage, Corridor, Accessible Open Terrace etc. set in 20 mm sand cement mortar (1:4) and 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg./Sqm or using Polymerised Adhesive (6 mm thick layer applied directly over finished artificial stone floor/ Mosaic etc without any backing course) laid after application slurry using 1.75 Kg of cement per Sqm below mortar only, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles/ epoxy grout materials of approved make as directed and removal of wax coating of top surface of tiles with warm water and polishing the tiles using soft and dry cloth upto mirror finish complete including the cost of materials, labour and all other incidental charges complete true to the manufacturer's specification and direction of Engineer-in-Charge. (White cement, synthetic adhesive and grout material to be supplied by the contractor). Sizes-600 mm x600mm x10 mm with reaking strength > 1500 N Add extra for each addl, floor over the rate above Ground Floor | - | SQM | 1,628 | - |
| 1.07 | i) Hydraulic door closer of approved quality as per I.S.I. standard fitted and fixed complete.
(a) Heavy type (I.S.I. size 3) | - | each | 1,665 | - |
| 1.08 | Taking out old iron higes and fitting, fixing the same with new steel screws. (d) 90mm. Long butt hinge. | - | each | 10 | - |
| 1.09 | Anodised aluminium butt hinges of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 205/66) and fitted and fixed with cadmium plated screws: (v) 100 x 63 x 3.2mm. | - | each | 72 | - |
| 1.1 | Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed complete: a) With continuous plate base (Hexagonal/ Round rod) (ii) 100 mm grip x 10 mm dia rod. | - | each | 69 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_2491807.xls
BOQ • 0.30 MB
CorrigendumDate3.pdf
PDF • 0.32 MB
CorrigendumDate2.pdf
PDF • 0.31 MB
CorrigendumDate1.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].