Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAdmitted-Finance | ₹9.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.8 Cr+₹10.6 L (1.09%)Admitted-Finance 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹9.8 Cr+₹10.6 L (1.09%) | L2 | Admitted-Finance |
| 3 | L3₹10.8 Cr+₹1.1 Cr (11.6%)Admitted-Finance D C 6 SIDCO INDUSTRIAL ESTATE SIDCO INDUSTRIAL ESTATE THUVAKUDI TIRUCHIRAPPALLI TIRUCHIRAPPALLI TAMIL NADU 620015 | TIRUCHIRAPPALLI | TAMIL NADU | 620015 | ₹10.8 Cr+₹1.1 Cr (11.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GEECO ENERCON PVT LTD L3 | Arvos Energy India Pvt. Ltd. L1 | BHEL L2 |
|---|---|---|---|---|---|---|
| 10.00 | HOT/INTERMEDIATE BASKET FOR PAPH,TYPE-E | 12 | NO | 3,82,500 ₹4,87,458 | 3,98,400 ₹4,70,112 | 3,55,308 ₹4,19,263.44 Lowest |
| 20.00 | HOT/INTERMEDIATE BASKET FOR PAPH,TYPE-D | 36 | NO | 9,50,940 ₹12,11,877.94 | 9,82,800 ₹11,59,704 | 8,85,312 ₹10,44,668.16 Lowest |
| 30.00 | HOT/INTERMEDIATE BASKET FOR PAPH,TYPE-A | 24 | NO | 7,40,160 ₹9,43,259.9 | 7,37,760 ₹8,70,556.8 | 6,86,568 ₹8,10,150.24 Lowest |
| 40.00 | HOT END BASKET E | 48 | NO | 17,55,648 ₹22,37,397.81 | 18,10,080 ₹21,35,894.4 | 16,93,296 ₹19,98,089.28 Lowest |
| 50.00 | HOT END BASKET C | 24 | NO | 11,00,880 ₹14,02,961.47 | 11,33,760 ₹13,37,836.8 | 10,68,816 ₹12,61,202.88 Lowest |
| 60.00 | HOT END BASKET AB | 12 | NO | 4,23,000 ₹5,39,071.2 | 4,35,840 ₹5,14,291.2 | 4,09,836 ₹4,83,606.48 Lowest |
| 70.00 | HOT END BASKET;G27;FOR APH 27VI80T STG I | 84 | NO | 40,19,400 ₹51,22,323.36 | 38,15,280 ₹45,02,030.4 Lowest | 42,96,012 ₹50,69,294.16 |
| 80.00 | HIE BASKET;E;FOR APH 27 VI 80(T) | 132 | NO | 55,36,080 ₹70,55,180.35 | 51,57,240 ₹60,85,543.2 | 49,94,220 ₹58,93,179.6 Lowest |
| 90.00 | HIE BASKET;AB;FOR APH 27 VI 80(T) | 84 | NO | 34,43,580 ₹43,88,498.35 | 30,89,520 ₹36,45,633.6 Lowest | 31,13,544 ₹36,73,981.92 |
| 100.00 | HOT END BASKET;E;FOR APH27VI80T STG I | 132 | NO | 50,98,500 ₹64,97,528.4 | 46,43,760 ₹54,79,636.8 Lowest | 54,94,500 ₹64,83,510 |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
5 Jul 2022, 1:00 pmClosed
Prakash M Gharat Sr. Manager (C and M) CPG-2
Sipat Super Thermal Power Proj PO Ujwal Nagar District Bilaspur 495555
APH basket for NTPC Singrauli
2022_NTPC_64341_1
NTPC/USSC-CPG2/9900240316
Limited
Miscellaneous Goods
Supply
120 days
Sipat Super Thermal Power Proj PO Ujwal Nagar Dist
6 documents required · 6 mandatory
₹0
₹10 L
Yes
22 Aug 2022
26 May 2022
8 Jul 2022
26 May 2022
5 Jul 2022
26 May 2022
26 May 2022 - 2 Jun 2022
HOT/INTERMEDIATE BASKET FOR PAPH,TYPE-E
HOT/INTERMEDIATE BASKET FOR PAPH,TYPE-D
HOT/INTERMEDIATE BASKET FOR PAPH,TYPE-A
HOT END BASKET E
HOT END BASKET C
HOT END BASKET AB
HOT END BASKET;G27;FOR APH 27VI80T STG I
HIE BASKET;E;FOR APH 27 VI 80(T)
HIE BASKET;AB;FOR APH 27 VI 80(T)
HOT END BASKET;E;FOR APH27VI80T STG I
HIE BASKET;D;FOR APH 27 VI 80(T)
HIE BASKET;F;FOR APH 27 VI 80(T)
HOT END BASKET;AB;FOR APH27VI80T) STG I
COLD END BASKET-FC27 APH;27VI80(T) STG I
COLD END BASKET-F27 APH;27VI80(T) STG I
COLD END BASKET-E APH;27VI80(T) STG I
COLD END BASKET-DC APH;27VI80(T) STG I
COLD END BASKET-D APH;27VI80(T) STG I
COLD END BASKET-C APH;27VI80(T) STG I
HE BASKET;D;FOR APH 27 VI 80(T)
HE BASKET;F;FOR APH 27 VI 80(T)
HIE BASKET;G27;APH;27VI80(T)
HOT END BSKT;T:D;H=850TH=0.63STG2
HIT BSKT;T:F;H=700T=0.63MATL PAPH
HIT BSKT;T:C;H=700T=0.63;MATL PAPH
HE BASKET;C;FOR APH 27 VI 80(T)
HOT END BSKT;T:F;H=850T=0.63 STG2
HIE BASKET;C;FOR APH 27 VI 80(T)
H.E.BSKT;T:G27;H=850;T=0.63MATL PAPH
H.ID.BSKT;T:G27;H=700T=0.63MATL PAP
GEECO ENERCON PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .