Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | -31.33% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.8 L+₹1.3 L (15.8%)Admitted-Fee/PreQual/Technical/Finance | -20.50% | ₹9.8 L+₹1.3 L (15.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.2 L+₹1.8 L (21.0%)Admitted-Fee/PreQual/Technical/Finance | -16.90% | ₹10.2 L+₹1.8 L (21.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.4 L+₹1.9 L (23.0%)Admitted-Fee/PreQual/Technical/Finance | -15.55% | ₹10.4 L+₹1.9 L (23.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹11.0 L+₹2.5 L (29.6%)Admitted-Fee/PreQual/Technical/Finance | -11.01% | ₹11.0 L+₹2.5 L (29.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.3 L
EMD Value
₹24,640
Closing Date
15 Jun 2026, 4:00 pmClosed
Executive Engineer PHE Division Sopore
Executive Engineer PHE Division Sopore
Laying and fitting of HDPE pipes for tail portion of Adipora of WSS Zaingeer under CDF of Honble MLA Sopore (Irshad Rasool Kar) for the year 2026-27
2026_PHE_310998_1
ENIT No. 02/PHE/SPR of 05/2026 dated 26-05-2026
Open Tender
Civil Works
Percentage
30 days
Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer PHE Division Sopore
₹24,640
Yes
19 Jun 2026
26 May 2026
16 Jun 2026
26 May 2026
15 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: within a lead of 50 meter. In all kinds of soils | 316.5 | Cum | 256.85 | ₹81,293.03 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m. | 284.9 | Cum | 218.4 | ₹62,222.16 |
| 3 | Providing, Laying and Fitting HDPE pipe conforming to IS 4984: 1995 with latest amendments and conveying to work site including loading and unloading at both destinations and rolling, lowering into the trenches, laying true to line and jointing of pipes and specials by electro fusion welding as per standard procedure and guidelines, including encasing the pipe around to a depth not less than 15 cms with soft earth or selected earth available from the excavation etc., complete giving hydraulic test as per relevant ISI with all leads and lifts including testing commissioning. The rate is inclusive of required specials and fittings etc (Couplers, Tee, Reducer, Bend, End Caps conforming with BS EN12201: Part-3) wherever required complete (Contractor will make own arrangements for procuring water for testing) HDPE pipe PE100, PN10. incld carriage of pipes upto site of work (90mm dia ISI Marked HDPE Pipe) | 2,500 | Mtr | 403.9 | ₹10,09,750 |
| 4 | Providing, Laying and Fitting HDPE pipe conforming to IS 4984: 1995 with latest amendments and conveying to work site including loading and unloading at both destinations and rolling, lowering into the trenches, laying true to line and jointing of pipes and specials by electro fusion welding as per standard procedure and guidelines, including encasing the pipe around to a depth not less than 15 cms with soft earth or selected earth available from the excavation etc., complete giving hydraulic test as per relevant ISI with all leads and lifts including testing commissioning. The rate is inclusive of required specials and fittings etc (Couplers, Tee, Reducer, Bend, End Caps conforming with BS EN12201: Part-3) wherever required complete (Contractor will make own arrangements for procuring water for testing) HDPE pipe PE100, PN10. incld carriage of pipes upto site of work (50mm dia ISI Marked HDPE Pipe) | 300 | Mtr | 139.2 | ₹41,760 |
| 5 | Providing, Laying and Fitting HDPE pipe conforming to IS 4984: 1995 with latest amendments and conveying to work site including loading and unloading at both destinations and rolling, lowering into the trenches, laying true to line and jointing of pipes and specials by electro fusion welding as per standard procedure and guidelines, including encasing the pipe around to a depth not less than 15 cms with soft earth or selected earth available from the excavation etc., complete giving hydraulic test as per relevant ISI with all leads and lifts including testing commissioning. The rate is inclusive of required specials and fittings etc (Couplers, Tee, Reducer, Bend, End Caps conforming with BS EN12201: Part-3) wherever required complete (Contractor will make own arrangements for procuring water for testing) HDPE pipe PE100, PN10. incld carriage of pipes upto site of work (40mm dia ISI Marked HDPE Pipe) | 300 | Mtr | 91.9 | ₹27,570 |
| 6 | Hire charges for welding plant for necessary repairs of pipe network/structures etc as per requirement including C/O operator,genrator,welding rods ,wiring and carriage of men and mechinary complete in all respects as per requirement at site but exculding additional materias like collar,pipe specials,steel section etc. | 8 | Hrs | 1,200 | ₹9,600 |
stage.html
html • 0.02 MB
finance_1006697.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_1006697.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .