Tender Value
₹30.6 L
EMD Value
₹50,000
Closing Date
5 Oct 2026, 6:00 pm
Executive Engineer
O/o the Executive Engineer, Harbour Engineering TVM Division, Kamaleshwaram
GENERAL-IB-Expansion of Inspection Bungalow at Vizhinjam - Phase 2-General Civil Work
2026_HED_873209_1
HED/CEHED/TR/209/2026_5_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
180 days
Vizhinjam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
26 Sept 2026
26 Sept 2026
7 Oct 2026
26 Sept 2026
5 Oct 2026
26 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishion and Dismantling | |||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | cum | - | - |
| 1.002 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.96 | cum | - | - |
| 1.003 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.1 | cum | - | - |
| 1.004 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 21 | each | - | - |
| 1.005 | 15.12.2:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area beyond 3 sq. metres | 1 | each | - | - |
| 1.006 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 0.3 | cum | - | - |
| 1.007 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 10 | cum | - | - |
| 1.008 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 254.27 | sqm | - | - |
| 1.009 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 32.4 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 0.13 MB
Tendernotice_4.pdf
PDF • 0.13 MB
Tendernotice_5.pdf
PDF • 0.22 MB
Tendernotice_6.pdf
PDF • 0.17 MB
BOQ_1481342.xls
BOQ • 0.30 MB
sbdIBPHASE2.pdf
Tender Documents • 2.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .