| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC 41 KANNAN KAL AVSAR | ₹3.8 L | L1 | Accepted-AOC AGREEMENT EXECUTED ON 02.03.2026 |
| 2 | L2₹4.1 LRejected-Finance | ₹4.1 L | L2 | Rejected-Finance HIGHEST QUOTED |
| 3 | L3₹4.2 LRejected-Finance | ₹4.2 L | L3 | Rejected-Finance HIGHEST QUOTED |
| 4 | L4₹4.3 LRejected-Finance | ₹4.3 L | L4 | Rejected-Finance HIGHEST QUOTED |
| 5 | L5₹4.5 LRejected-Finance NO 21794 KERALA | KANNUR | KERALA | 670002 | ₹4.5 L | L5 | Rejected-Finance HIGHEST QUOTED |
| Sl No | Description | Qty | Unit | AVANTHIKA TIMBERS L4 | K AND J BUILDERS L1 | P DEVARAJAN L5 | JAYAMON JOSEPH L3 | SREEKUMAR M L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00SIDE WALL CONSTRUCTION | ||||||||
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 21.22 | cum | 799.61 ₹16,964.53 | 500 ₹10,608 | 826 ₹17,524.42 | 840 ₹17,821.44 | 753.37 ₹15,983.5 |
| 1.00 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 57.53 | cum | 5,813.76 ₹3,34,453.99 | 5,000 ₹2,87,640 | 6,011 ₹3,45,800.81 | 5,500 ₹3,16,404 | 5,477.53 ₹3,15,111.35 |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 4.53 | cum | 8,394.1 ₹38,008.48 | 8,800 ₹39,846.4 | 8,680 ₹39,303.04 | 8,800 ₹39,846.4 | 7,908.64 ₹35,810.32 |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.2 | tonne | 85,271.28 ₹17,395.34 | 90,000 ₹18,360 | 88,183 ₹17,989.33 | 98,000 ₹19,992 | 80,339.8 ₹16,389.32 |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 3.06 | cum | 8,111 ₹24,819.66 | 8,800 ₹26,928 | 8,388 ₹25,667.28 | 8,800 ₹26,928 | 7,642.41 ₹23,385.77 |
Tender Value
₹5.1 L
EMD Value
₹12,710
Closing Date
16 Feb 2026, 5:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF ASSISTANT ENGINEER, LID AND EW SECTION, THENMALA GP
URUKUNNU NETHAJI ROAD SIDE WALL CONSTRUCTION-317/25-26
2026_LSGD_834677_8
04/2025-26/AE/LIDEW/TML
Open Tender
Civil Works - Roads
180 days
THENMALA GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,125
Yes
₹12,710
Yes
7 Mar 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
9 Feb 2026 - 16 Feb 2026
SIDE WALL CONSTRUCTION
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1404580.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.75 MB
affi.pdf
Tender Documents • 0.24 MB
preli.pdf
Tender Documents • 0.26 MB
fot.pdf
Tender Documents • 0.25 MB
ipact.pdf
Tender Documents • 0.24 MB
epay.pdf
Tender Documents • 0.24 MB
feeremi.pdf
Tender Documents • 0.27 MB
317sbdmerged.pdf
Tender Documents • 2.33 MB
BOQ_1404580.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid