Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹83.1 LAccepted-AOC | ₹83.1 L | l1 | Accepted-AOC Accepted. Winner in Lottery |
| 2 | L1₹83.1 LRejected-AOC | ₹83.1 L | L1 | Rejected-AOC Accepted |
| 3 | l1₹83.1 LRejected-AOC ODISHA | ₹83.1 L | l1 | Rejected-AOC Accepted |
| 4 | l1₹83.1 LRejected-AOC JAGANNATHPOSH HAMIRPUR PANCHAMAHALA SUBDEGA SUNDARGARH | MALKANGIRI | ODISHA | 764044 | ₹83.1 L | l1 | Rejected-AOC Accepted |
| 5 | l1₹83.1 LRejected-AOC | ₹83.1 L | l1 | Rejected-AOC Accepted |
Tender Value
₹83.2 L
EMD Value
₹83,199
Closing Date
30 Mar 2026, 5:00 pmClosed
O/o the SE Sundargarh R and B Division, Sundargarh
O/o the SE Sundargarh R and B Division, Sundargarh
Construction of RI office cum Residence at Sundargarh the District of Sundargarh for the year 2025.26 including EI and PH works
2026_EICCL_127318_1
Bid Identification No-SE-R AND B-SNG-33 OF 2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Sundargarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹83,199
Yes
19 Aug 2026
18 Mar 2026
31 Mar 2026
18 Mar 2026
30 Mar 2026
18 Mar 2026
18 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of RI office cum Residence at Sundargarh the District of Sundargarh for the year 2025.26 including EI and PH works | |||||
| 1.1 | Ground Floor
Dismantling brick or stone masonary in cement mortar under 3.00m height including all costs complete. Stacking the useful materials for reuse and removing the debris 50 mtr lead. | 115.92 | Cum | 1,611.7 | ₹1,86,828.26 |
| 2 | Dismantling and removing RCC columns,beams,slab,staircase landing,lintels including stacking the useful materials for reuse and removing the debris within 50m lead. | 9.63 | Cum | 1,696.9 | ₹16,341.15 |
| 3 | Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C. | 83.76 | Cum | 276.89 | ₹23,192.31 |
| 4 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | 58.53 | Cum | 843.01 | ₹49,341.38 |
| 5 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 30.38 | Cum | 5,646.77 | ₹1,71,548.87 |
| 6 | Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Foundation and Plinth including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | 35.56 | Cum | 5,532.7 | ₹1,96,742.81 |
| 7 | Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Superstructure including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | 24.08 | Cum | 5,566 | ₹1,34,029.28 |
| 8 | Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:4) in Superstructure including including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of Engg-in -charge. | 5.08 | Cum | 5,752 | ₹29,220.16 |
| 9 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.
Footing | 14.28 | Cum | 6,010.56 | ₹85,830.8 |
stage.html
html • 0.12 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_585304.xls
BOQ • 0.50 MB
DTCN1_BUILDINGS.pdf
Tender Documents • 4.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .