Loading…
Loading…
Tender Value
₹5.5 Cr
EMD Value
₹5.5 L
Closing Date
1 Sept 2026, 6:00 pm4d left
Executive Engineer, P.H. Works Division, Khambhalia. GWSSB.
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as elevated service reservoirs (E.S.R), Sump, WTP, Pump house, All distribution pipelines, valves, pumping machinery & electrical equipment etc. for the Harshad regional water supply schemes, including supply of 6.03 MLD potable water to all the 16 villages & 4 Hemlet for 60 months period. Taluka:- Kalyanpur District:- Devbhumi Dwarka based on Narmada Pipe line NC-21 excluding supply of PAC/Alum, Bleaching Powder/Chlorine Gas etc
330702
13/2026-27
Open
Water Supply/ Sanitation Works
Works
Devbhumi Dwarka
6 documents required · 6 mandatory
₹12,000
Executive Engineer, P.H.Works Division khambhalia
₹5.5 L
3 Aug 2026
3 Aug 2026
3 Aug 2026
1 Sept 2026
3 Aug 2026
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as
elevated service reservoirs (E.S.R), Sump, WTP, Pump house, All distribution pipelines, valves,
pumping machinery & electrical equipment etc. for the Harshad regional water supply schemes,
including supply of 6.03 MLD potable water to all the 16 villages & 4 Hemlet for 60 months period.
Taluka:-Kalyanpur District:- Devbhumi Dwarka based on Narmada Pipe line NC-21. Excluding supply
of PAC/Alum, Bleaching Powder/Chlorine Gas etc. complete.
Amount up to 2 decimals
Part Description
Operation & Maintenance of Civil & Electromechanical assets such as
elevated service reservoirs (E.S.R), sump,WTP,pump house, all
distribution pipelines, valves, pumping machinery & electrical
equipment etc. for the Harshad RWSS including supply of 6.03 MLD
potable water to all the 16 villages and 4 Hemlet for 60 months
period. Taluka:-Kalyanpur District:- Devbhumi Dwarka based on
Narmada Pipe line NC-21. Including supply of PAC/Alum, Bleaching
Powder/Clorine Gas etc. complete.
Maintenance activities, measured and paid separately, such as
painting, cleaning of reservoirs/ tanks, procurement and replacement
of filter media etc complete as per this tender document
C Repair, upgradation of non-functional assets which are crucial for safe
and efficient functioning of RWSS
Total Amount (A+B+C)
Total Amount (A+B+C)
Total of Schedule B in Rupees Five Crore Fifty four lac thirteen thousand four hundred sixty five and
zero nine paise only.
I / We am / are willing to carry out the work at_________ % above / Below percent (should be
written in figure and words) of the estimated rates mentioned above amount of my / our tender
works out as under.
Estimated amount Put to tender: Rs. 55413465.09 Estimated amount Put to tender: Rs.
Deduct ______ % above Rs. ____________ Add ______ % above Rs.
In words Rupees __________________________ In words Rupees __________________________
Rates to be quoted exclusive of GST.
Part A is payable on monthly basis whereas part B & C are subject to completion of activities
and approval of the measurement.
Water supply of target quantity of water to all villages on a daily basis. If due to breakdown,
agency is not capable of supplying water then such quantity should be supplied the next day
to cope up with the shortage. Such that the water supplied on the next day will be 2 times the
regular per day target.
Contractor should quote rate in words & figure both.
Insurance Policy should be procured in favour of Executive Engineer, PH Works Division,
Khambhaliya, and contractor has to produce it before entering into agreement with
department, for the full period of O&M.
The bidders should strictly note that rate will be fixed and firm. No escalation will be given
during the maintenance period.
The work should be carried out as per the terms and conditions laid down in the tender
The cost of raw water, electricity will be borne by GWSSB.
GWSSB will supply necessary stock of Chlorine gas, PAC & bleaching powder. All other
required material for O&M work shall be brought by the contractor at his own cost including
loading, unloading and carting and the same material shall get approval from the Engineer-in-
charge before use in the work.
The cost is including all type of taxes (other than GST), octroi, freight, loading, unloading,
carting labour charges payment to labour including insurance, P.F. and all other liabilities for
the staff engaged for the O&M work.
All replaced material (provided from the department’s store) shall be returned to department
store by the contractor at his own cost.
Painting of overall structures:Internal/external painting of civil structures, machineries,
manifolds, valves etc.
Interior Paint: Distemper paint to all civil assets
Exterior paint: shall be acrylic emulsion paint colour (like APEX): pump house, treatment
plants, treated water pumping stations, GSRs, ESRs, sump, stores, etc all.
Oil paint colour: All type of doors, windows, ventilation, shutter, pump, motor, all valves &
equipment inside pump house, transformer yard, D.P. structure, transformer etc
Black Japan colour: air valve, sluice valve, riser pipe of air valve, zero velocity valve, butterfly
valve (outdoor), bypass arrangement etc.
Breakup of Schedule B
Part A: Operation & Maintenance
Qty. Unit Item Per Amount in
Operation & Maintenance of Civil &
Electromechanical assets such as elevated
service reservoirs (E.S.R), HGLR, sump,
pump house, all distribution pipelines,
valves, pumping machinery & electrical
equipment etc. for the raval supply schemes,
including supply of 5.37 MLD potable water
to all the 09 villages & 1 city for 60 months
period. Taluka:-Kalyanpur District:-
Devbhumi Dwarka based on Narmada Pipe
line NC-21. Including supply of PAC/Alum,
Bleaching Powder/Chlorine Gas etc.
i 12 Months First Year 708606.00 Month
ii 12 Months Second Year 751122.36 Month
iii 12 Months Third Year 796189.70 Month
iv 12 Months Fourth Year 843961.08 Month
v 12 Months Fifth Year 894598.75 Month
Total for Part A in. Rupees Four Crore seventy nine lakh thirty three thousand seven hundred thirty
four & seventy three paise only
Part B- Maintenance (separately payable on actuals, as measured)
Qty. Unit Item Per Amount in
Inside-Outside Painting to all Functional civil
structures, as per schedule (twice in the
contract period)
Sqm Pump House 113.40 Sqm
Sqm Compound Wall
Qty. Unit Item Per Amount in
Oil paint colour: All type of doors, windows,
B1 ventilation, shutter, pump, motor, all valves &
(ii) equipment inside pump house, transformer
yard, D.P. structure, transformer etc(twice in 104.27
the contract period)
B1 2317.32 Food Grade epoxy coat: Inside of storage
sqm 1451.00 .Sqm
(iii) reservoir/ tanks as per schedule. (twice in the
contract period)
Sub Total- Part B1 (i, ii, iii) 6096912.36 N
Cleaning of Storage reservoir: UG sumps,
B2 ESR, HGLR/ GLCC and all village level
sumps every six month s(10 times in the
contract period)
a 10 Job Sump - 40.00 Lakh Lit - 01 No. 34483.00 Job
b 10 Job Sump - 16.00 Lakh Lit - 01 No. 14567.00 Job
c 10 Job Sump - 5.00 Lakh Lit - 01 No. 5463.00 Job
d 10 Job Sump - 9.00 Lakh Lit - 01 No. 8421.00 Job
e 10 Job Kalyanpur HW 3.6 Lakh Liter ESR 20 meter 3528.00 Job
f 10 Job Ganesh gadh HW 3.0 Lakh Liter ESR 20 meter 3187.00 Job
g 10 Job Satapar HW 4.50 Lakh Liter ESR 12.00 meter 4439.00 Job
Sub Total- Part B2
Total- Part B (B1+B2)
Total for Part B in. Rupees Sixty Eight lakh Thirty seven thousand seven hundred ninty two & thirty six
Part C- Upgradation or Repair of non-functional legacy assets
Qty. Unit Item Per Amount in
Upgradation or Repair of non-functional
legacy assets (separately payable on
actuals, as measured)
Mechinacial machinery 641938.00
Total- Part C Rs.
Total for Part C in. Rupees Six lakh forty one thousand nine hundred thirty eight only
Part C: Detailed BOQ
Description of Item Qty. Unit Rate Amount
Supply& Installation of SM Pump Set:
Supply & Installation of Horizontal Sub-Mono Pump Set
Phase 400/440 Volt, 50 c/s, A.C. Supply & 2900 RPM with
M Copper Cable following IS 14220 and MOC:- Casing- CI
FG260, Impeller- CF8M & Shaft- SS410.
SM- (1300 LPM X 50 M X 25 HP ) Parallal rate taken of SM-
3.7 as per Mech SOR-2022-23 Section-E item No.5(13) Page
No.36,& Installation Item No.51(C) page No.93
Supply& Installation of SM Pump Set:
Supply & Installation of Horizontal Sub-Mono Pump Set
Phase 400/440 Volt, 50 c/s, A.C. Supply & 2900 RPM with
M Copper Cable following IS 14220 and MOC:- Casing- CI
FG260, Impeller- CF8M & Shaft- SS410.
SM- (690 LPM X 40 M X 15 HP) Parallal rate taken of SM-2.7
as per Mech SOR-2022-23 Section-E item No.5(4) Page
No.35,& Installation Item No.51(B) page No.93
Supply& Installation of SM Pump Set:
Supply & Installation of Horizontal Sub-Mono Pump Set
Phase 400/440 Volt, 50 c/s, A.C. Supply & 2900 RPM with
M Copper Cable following IS 14220 and MOC:- Casing- CI
FG260, Impeller- CF8M & Shaft- SS410.
SM- (1860 LPM X 34 M X 25 HP) Parallal rate taken of SM-
4.7 as per Mech SOR-2022-23 Section-E item No.5(17) Page
No.36,& Installation Item No.51(C) page No.93
Supply& Installation of SM Pump Set:
Supply & Installation of Horizontal Sub-Mono Pump Set
Phase 400/440 Volt, 50 c/s, A.C. Supply & 2900 RPM with
M Copper Cable following IS 14220 and MOC:- Casing- CI
FG260, Impeller- CF8M & Shaft- SS410.
SM- (1000 LPM X 58 M X 25 HP ) Parallal rate taken of SM-
2.5.6 as per Mech SOR-2022-23 Section-E item No.5(9)
Page No.36,& Installation Item No.51(C) page No.93
Brief note on operational issues and need for the repairs:______________________________
_______________________________________________________(include notes from inspection
by DEE and the need for such items)
Abstract of BOQ for Part C
Total Estimated Cost of Part C: Rs.6,41,938/-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.O AND M DTP Vol I Harshad Rwss Ok.pdf
2.O AND M DTP Vol II harshad updated Ok.pdf
3.Detailed Spec Part B ok.pdf
4.Tech Speci mech Harshad ok.pdf
5.Harshad Juth REMODELING DWG.pdf
6.SD EMD GR 26-27.pdf
SCHEDULE A.pdf
SCHEDULE B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].