Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | ₹2.9 Cr Quoted ₹60.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.7 Cr+₹18.0 Cr (2978.0%)Rejected-Finance | ₹18.7 Cr+₹18.0 Cr (2978.0%) | L2 | Rejected-Finance L2 BIDDER |
Tender Value
₹56.3 L
EMD Value
₹50,000
Closing Date
30 May 2023, 11:00 amClosed
Chief Executive Officer
4th Floor, Felicity Square, Opp. AGs Office, M G Road, Statue,Thiruvananthapuram Kerala 695 001
EPC contractor for the design as per site conditions, erection, testing and commissioning of Grid Tied Rooftop Solar Photo Voltaic (SPV) Power plants, on the Roof of buildings with a total installed capacity of 95 kWp in total 3 locations with OM
2023_SCTLT_574626_1
SCTL/PRJ/232/2023/ Solar/02
Open Tender
Solar Power Plants
Item Rate
90 days
Smart City Thiruvananthapuram
All requisites as per RFP Tender documents
2 documents required · 2 mandatory
₹3,250
₹50,000
Smart City Thiruvananthapuram
4 Sept 2023
3 May 2023
31 May 2023
3 May 2023
30 May 2023
18 May 2023
4 May 2023 - 15 May 2023
16 May 2023
Amount
SANSKRIT COLLEGE, PALAYAM, TRIVANDRUM
Supply, Installation,Testing and commissioning of ongrid Solar Photovoltaic Power plant confirming to MNRE specifications, consisting of Mono Perc half cut crystalline silicon solar cells, net metering facility, neccessary protections, earthing, mounted on Aluminium Alloy structure of adequate strength with following components complete as required :- a) Solar Photovoltaic Module of reputed manufacture with capacity of 550 Wp or above , manufactured in india, comfirming to IS 14286/IEC 61215, IS/IEC 61730- Part -1, IS/IEC 61730- Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 21%. b) Power Conditioning Unit (PCU) of 200-1000 V DC Input Voltage range and output 400V AC, three phase,4 wire,50 Hz suitable to generate AC power with efficency not less than 98%,with standard IEC conditions, suitable for ambient temprature from 0 to 50 degree C. c) Essential Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands,lugs and other accessories etc. as required. e)Lightning and surge voltage protection. f) Connections and interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, mian power cable to grid supply PCU along with supplying & fixing of neccessary channel / conduit lugs and other accessories etc. as required. g)BoS as applicable if any. h)Integrating system as per Engineer In Charge i)Earthing of the plant as per standard IEC 60364/IS 3043 (1987) where neccessary.
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for first year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for second year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for third year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for fourth year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for fifth year
AR CAMP, NANDAVANAM, TRIVANDRUM
Supply, Installation,Testing and commissioning of ongrid Solar Photovoltaic Power plant confirming to MNRE specifications, consisting of Mono Perc half cut crystalline silicon solar cells, net metering facility, neccessary protections, earthing, mounted on Aluminium Alloy structure of adequate strength with following components complete as required :- a) Solar Photovoltaic Module of reputed manufacture with capacity of 550 Wp or above , manufactured in india, comfirming to IS 14286/IEC 61215, IS/IEC 61730- Part -1, IS/IEC 61730- Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 20%. b) Power Conditioning Unit (PCU) of 200-1000 V DC Input Voltage range and output 400V AC, three phase,4 wire,50 Hz suitable to generate AC power with efficency not less than 98%,with standard IEC conditions, suitable for ambient temprature from 0 to 50 degree C. c) Essential Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands,lugs and other accessories etc. as required. e)Lightning and surge voltage protection. f) Connections and interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, mian power cable to grid supply PCU along with supplying & fixing of neccessary channel / conduit lugs and other accessories etc. as required. g) BoS as applicable if any. h)Integrating system as per Engineer In Charge i)Earthing of the plant as per standard IEC 60364/IS 3043 (1987) where neccessary.
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for first year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for second year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for third year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for fourth year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for fifth year
MLCP, THAMPANOOR, TRIVANDRUM
Supply, Installation,Testing and commissioning of ongrid Solar Photovoltaic Power plant confirming to MNRE specifications, consisting of Mono Perc half cut crystalline silicon solar cells, net metering facility, neccessary protections, earthing, mounted on Aluminium Alloy structure of adequate strength with following components complete as required :- a) Solar Photovoltaic Module of reputed manufacture with capacity of 550 Wp or above , manufactured in india, comfirming to IS 14286/IEC 61215, IS/IEC 61730- Part -1, IS/IEC 61730- Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 21%. b) Power Conditioning Unit (PCU) of 200-1000 V DC Input Voltage range and output 400V AC, three phase,4 wire,50 Hz suitable to generate AC power with efficency not less than 98%,with standard IEC conditions, suitable for ambient temprature from 0 to 50 degree C. c) Essential Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands,lugs and other accessories etc. as required. e)Lightning and surge voltage protection . f) Connections and interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, mian power cable to grid supply PCU along with supplying & fixing of neccessary channel / conduit lugs and other accessories etc. as required. g) BoS as applicable if any. h)Integrating system as per Engineer In Charge i)Earthing of the plant as per standard IEC 60364/IS 3043 (1987) where neccessary.
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for first year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for second year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for third year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for fourth year
Operation & maintenance including cost of replacement of all parts after sucessful commissioning of Roof top Solar PV system as per the scope of work & technical specifications under O&M to be quoted for fifth year
INKEL LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .