Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC 26 2579 THEVARA PO KOCHI ERNAKULAM KERALA 682013 | KOCHI | ERNAKULAM | KERALA | 682013 | L1 | Accepted-AOC BEING L1 AND HENCE ACCEPTED |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
24 Dec 2024, 6:00 pmClosed
Shri Santosh Kumar Rai IDSE SE CWE NB
Commander Works Engineer NB Kochi Kataribagh Naval Base PO Kochi 682 004
REPAIR/MAINT OF COOLING APPLIANCES LIKE SPLIT/WINDOW ACS, WATER COOLERS, DEEP FREEZER ETC AT INS DRONACHARYA AND SMA RAMESWARAM UNDER GE FORT KOCHI.
2024_MES_685169_1
81168
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
FORT KOCHI
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE FORT KOCHI
₹20,000
Yes
14 Jan 2025
22 Nov 2024
26 Dec 2024
22 Nov 2024
24 Dec 2024
6 Dec 2024
Amount
AIR CONDITIONING:- S & F factory built hermatically sealed compressor unit suitable for 1.5 Ton capacity split / window type AC, testing the leak of compressor by charging Dry Nitrogen gas, evacuating the system and charging R-22 /304 a /407a /134 Refrigerent gas including taking out old unserviceable compressor from the split type AC complete all as specified and directed
S & F factory built hermatically sealed compressor unit suitable for 2 Ton capacity split / window type AC, testing the leak of compressor by charging Dry Nitrogen gas, evacuating the system and charging R-22 /304 a /407a /134 Refrigerent gas including taking out old unserviceable compressor from the split type AC complete all as specified and directed
S & F factory built hermatically sealed compressor unit suitable for 2.5 Ton capacity split / window type AC, testing the leak of compressor by charging Dry Nitrogen gas, evacuating the system and charging R-22 /304 a /407a /134 Refrigerent gas including taking out old unserviceable compressor from the split type AC complete all as specified and directed
Material & Labour for Leak testing of Window / Split type AC, Water cooler, Refrigerator, Deep freezer etc including filling of nitrogen gas for pressure testing, finding leaks, Vacuuming the system, necessary brazing work, charging with refrigerant gas (R-22/R-32) of required quantity, testing for proper functioning complete all as specified and directed
M&L on site servicing 1.5 / 2.0 / 2.5 Ton capacity split / window type AC of any description by cleaning air filter, cooling / condensor coil and outer cabinet with pressurised water and detergent solution, applying new insulation to torn/damaged insulation complete all as specified to the satisfaction of Engr in charge.
S & F condensor fan motor with capacitor and mounting materials, single phase, 230 Volts, 50 Hz suitable for 1.0/1.5/2.5 Ton capacity split type AC including taking out old unserviceable blower motor complete all as specified.
S & F in repair thermostatic switch suitable for 1.5 / 2.0 / 2.5 Ton capacity split / window type AC complete all as specified and as directed.
S & F in repair overload relay suitable for 1.5 Ton capacity window type AC complete all as specified.
S & F in repair starting relay suitable for 1.5 /2.0 Ton capacity window type AC complete all as specified.
S & F in repair copper condenser suitable for 1.5 Ton capacity split / window type AC complete all as specified.
S & F in repair copper condenser suitable for 2.0 Ton capacity split type AC complete all as specified.
S & F in repair copper condenser suitable for 2.5 Ton capacity split type AC complete all as specified.
S & F in repair 30 / 36 mfd running capacitor suitable for 1.5 / 2.0 / 2.5 Ton capacity split / window type AC complete all as specified.
S & F in repair PVC fan blade suitable for 1.5/2.0/2.5 Ton capacity split / window type AC complete all as specified.
.Supply and replace Prime Control Remote Board and temperature digital display sensor suitable for split type/Window AC of any capacity, make or model all as per site requirement complete all as directed.
S & F in repair liquid strainer suitable for 1.5 / 2.0 / 2.5 Ton capacity split type AC complete all as specified.
S & F in repair capillary tube for 1.5 / 2.0 / 2.5 Ton capacity split type AC complete all as specified.
REFRIGERATION:- S & F factory built hermatically sealed compressor unit suitable for 175 / 205 Ltrs capacity Refrigerator, testing the leak of compressor by charging dry Nitrogen gas, evacuating the system and charging R-134 / R-600 Refrigerent gas including taking out old unserviceable compressor from the Refrigerator complete all as specified and directed
S&F factory built hermatically sealed compressor unit suitable for 285 / 310 / 340 Ltrs capacity Refrigerator, testing the leak of compressor by charging dry Nitrogen gas, evacuating the system and charging R-134 / R-600 Refrigerent gas including taking out old unserviceable compressor from the Refrigerator complete all as specified and directed.
S & F in repair thermostatic switch suitable for 175 / 205 / 285 / 290 / 310 / 340 Ltrs capacity Refrigerator complete all as specified.
S & F in repair starting relay suitable for 175 / 205 / 285 / 290 / 310 / 340 Ltrs capacity Refrigerator complete all as specified.
S & F in repair door switch suitable for 175 / 205 / 285 / 290 / 310 / 340 Ltrs capacity Refrigerator complete all as specified.
S & F in repair drier filter of size 1/4" x 1/4" flare connection suitable for 175 / 205 / 285 / 290 / 310 / 340 Ltrs capacity Refrigerator complete all as specified.
S & F in repair overload relay suitable for 175 / 205 / 285 / 290 / 310 / 340 Ltrs capacity Refrigerator complete all as specified.
S & F in repair electronic fan motor, single phase, 230 Volts, 50 Hz suitable for 425 Ltrs capacity Deep freezer complete all as specified.
S & F in repair thermostatic switch suitable for 425 Ltrs capacity Deep freezer complete all as specified.
WATER COOLER:- S&F factory built hermatically sealed compressor unit suitable for 40 / 60 / 80 Ltrs capacity water cooler, testing the leak of compressor by charging dry Nitrogen gas, evacuating the system and charging R-134/R-22 Refrigerent gas including taking out old unserviceable compressor from the water cooler complete all as specified and directed
S&F factory built hermatically sealed compressor unit suitable for 100/150 Ltrs capacity water cooler, testing the leak of compressor by charging dry Nitrogen gas, evacuating the system and charging R-134/R-22 Refrigerent gas including taking out old unserviceable compressor from the water cooler complete all as specified and directed
S & F in repair starting relay assembly suitable for 40 / 60 / 80 / 120 Ltrs capacity water cooler complete all as specified.
S & F in repair running capacitor suitable for 40 / 60 / 80 / 120 Ltrs capacity water cooler complete all as specified.
S & F in repair overload relay suitable for 40 / 60 / 80 / 120 Ltrs capacity water cooler complete all as specified.
S & F in repair thermostatic switch suitable for 40 / 60 / 80 / 120 Ltrs capacity water cooler complete all as specified.
S & F in repair 15mm dia brass chromium plated push cock / lifting cock suitable for 40 / 60 / 80 / 120 Ltrs capacity water cooler complete all as specified.
S & F in repair 15mm dia PVC high pressure release valve complete all as specified.
S & F in repair condensor fan motor, single phase, 50 Hz, 230 Volts suitable for 40 / 60 / 80 / 120 Ltrs capacity water cooler complete all as specified.
S & F in repair 15mm dia, 450mm long, PVC connection with brass check nuts, complete all as specified.
S & F in repair liquid strainer suitable for any capacity of water cooler complete all as specified.
S & F in repair capillary tube suitable for any capacity water cooler complete all as specified.
M & L comprehensive maint of water purifier, electrically operated, Best Water Doctor / Cross Field by servicing parts, attending break down, renewal of parts including checking the equipment by the Service Engineer once in a month complete all as specified & directed. (4 Nos x 11 Months = 44 Jobs) Note :- (i) Renewal of parts will be measured and paid as supply only separately. (ii) The cost of labour and consumables required for renewal of parts shall deem to include in the unit rate quoted by the contractor.
Supply only D2 Main PCB suitable for water purifier complete all as specified.
Supply only compressor suitable for water purifier capacity upto 10 ltr complete all as specified.
Supply only solenoid valve suitable for water purifier complete all as specified.
Supply only two way valve suitable for water purifier complete all as specified.
Supply only PF candle (Industrial) suitable for water purifier complete all as specified.
Supply only PF Bowl & cap suitable for water purifier complete all as specified.
Supply only compressor relays suitable for water purifier complete all as specified.
Supply only compressor fan motor suitable for water purifier complete all as specified.
Supply only thermostat (cooler) suitable for water purifier complete all as specified.
Supply only thermostat (heater) suitable for water purifier complete all as specified.
Supply only heating element suitable for water purifier complete all as specified.
S & F SPN enclosure with two pin and earth plug and socket complete with one MCB, SP, 20 Amps, having breaking capacity 10 kA, dual termination, isolation function with visual indication complete all as specified and directed.
S & F in repair 3 core, 2.5 Sqmm copper conductor, PVC insulated sheathed flexible cord complete all as specified.
S & F in repair 3 core, 4.0 Sqmm copper conductor, PVC insulated sheathed flexible cord complete all as specified.
S & F in repair 3 core, 6.0 Sqmm copper conductor, PVC insulated sheathed flexible cord complete all as specified.
S & F in repair industrial plug top suitable for industrial socket complete all as specified. Make : Legrand / Standard / Havells or equivalent as approved by GE.
Material & Labour in repair to voltage stabilizer 5 KVA by rewinding the main stabilizing unit and replacing PCB, sensing unit, power relay, connector piece and testing on completion all as specified and as directed
Material & Labour in repair to voltage stabilizer 4 KVA by rewinding the main stabilizing unit and replacing PCB, sensing unit, power relay, connector piece and testing on completion all as specified and as directed
S & F in repair copper pipe OD of any size including connecting to split type AC and applying insulation complete all as specified.
Material and labour for general servicing of 10 KVA, UPS by servicing of all parts, tightening of all electrical connections, applying petroleum gelly to battery terminals, repair / renewal of battery leads, attending the break down, repair / renewal of any parts except battery complete all as specified and directed.
S & F in repair PCB suitable for 10 KVA, 3 phase UPS complete all as specified. Make : Aplab or equivalent as approved by GE.
S & F in repair transformer unit for 10 KVA, 3 phase UPS complete all as specified. Make : Aplab or equivalent as approved by GE.
S & F in repair display unit for 10 KVA, 3 phase UPS complete all as specified. Make : Aplab or equivalent as approved by GE.
S & F in repair maint free battery 12 Volt, 42AH in fully charged condition complete all as specified. Make : Exide / Amron or equivalent as approved by GE.
S & F PVC drain pipe one meter long 32mm dia heavy duty with two nos of galvanized adjustable clamps including taking down existing complete all as specified and directed.
S & F PVC float valve suitable 15 mm dia assembly and comprising valve assembly AL rod, PVC ball for water cooler/ desert coolers including taking down existing complete all as specified and directed. Make :- Paryag / Polytuff or equivalent as approved by GE.
S & F Overload protector relay 2613 including taking down existing complete all as specified and directed . Make: Techemshah/ Hitachi or equivalent as approved by GE.
Opening of Refrigerators freeze of capacity 285/310 ltrs refixing the same after flushing out and removal of blockage brazing, renewal of liquid line filter and recharging the refrigerator with freon-12 refrigerant to obtain the desired cooling ( Temperature) complete including testing all as specified and directed .
Opening of Refrigerators freeze of capacity upto 265 ltrs refixing the same after flushing out and removal of blockage brazing, renewal of liquid line filter and recharging the refrigerator with freon-12 refrigerant to obtain the desired cooling ( Temperature) complete including testing all as specified and directed .
Supply and replace Prime Control Remote Board and temperature digital display sensor suitable for 3 phase Tower AC of any capacity, make or model all as per site requirement complete all as directed.
Supply and replace factory made MS bracket or Stand duly painted suitable for outdoor unit of split AC including necessary PCC work, making surface matching with existing etc, all as specified.
Supply and fill Refrigerant Gas-R-22 complete all as specified and directed.
Supply and fill Refrigerant Gas-410a (Penta & Di Fluoroethane)/304 a /407a /134 complete all as specified and directed.
Supply and fill Refrigerant Gas R- 32 complete all as specified and directed.
Material & Labour for Sealed compressor unit suitable for 2.5/3 TR capacity 3 phase Tower AC including first filling of refrigerant gas, compressor oil etc. testing and commissioning , including taking down of old unserviceable one complete all as specified and as directed
Material & Labour for servicing of condenser coil of Tower split AC 2.5/5 TR capacity, Cleaning / Pressure washing of choked condenser fins, tubes etc, with water soluble material including leak testing complete all as specified and as directed
Supply& Fix in repair Fan motor suitable for outdoor unit of 3 phase tower AC of any capacity make or model all as specified. and as directed.
Writing letters or figures for permanent marking of MES No with anti corrosive enamel paint not exceeding 03 cm in height as numbers obtained from Engineer-in-charge in window AC/Split ACs inner and outer unit and water cooler /refrigertaor etcwith thick approved colour paint complete all as specified and directed.
Supply and replace non inverter indoor type of 1.5/2TR of make by dismantling the old indoor and connecting up with existing outdoor unit including copper pipe and necessary brazing as per site requirement complete all as specified and directed.
Material & Labour for disconnecting the unserviceable stabilizer of any capacity 230 volts, any make from site and servicing complete and refixing back with necessary nuts/bolts fixed on walls and connecting up with A/C's drilling as per site requirement and all as directed by Engineer-in-charge.
Material & Labour for dismantling, taking down after disconnection split AC of capacity 1.5/ 2.0TR from existing location including indoor/ outdoor units alongwith its pipes, connecting cables, clamps/ stands, water drain pipes etc including making good the surfaces to match with existing finishes in all respects and re-fixing at new location as directed with all accessories such as clamps, pipes, stand for outdoor unit including top up of refrigerant gas if required and making satisfactory working of AC unit in all respect complete all as directed and specified by Engineer-in-charge
Material and labour for attending day to day complaints pertains to various capacity of cooling appliances as and when required by Refrigerator Mechanic and helper with necessary tools and plants for checking the equipment at existing location, find out the faults to the equipments, complete and rectification of minor problems (compressor control panel resetting with electrical components like replacement of lugs/pin, MCB resetting, electrical wiring connections gas top up (gas shall be measured and paid separately under relevant item) ,to make the AC functional in all respect all as directed by the Engineer -In Charge. Notes: 1.Complaints/service schedule list shall be collected from concerned JE/Engineer-In Charge and report back on daily basis. 2.The Serial item Nos of BOQ 6 to 8, 77 to 80 of BOQ shall be outside the scope of this item. 3.A penalty of Rs. 250/- per day will be levied in case breakdown of equipment more than 3 working hours from the time of complaint registration due to non attending. 4.The Item shall be measured and paid only when no replacement of spares included in the repair work. If any spare replacement included in the work, the work shall be measured and paid under relavent item only.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .