Tender Value
₹49.4 L
EMD Value
₹50,000
Closing Date
7 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Petlad Irrigation Division Petlad
Constructing box type VRB in place of damaged pipe VRB @ ch. 1250 m. on Jalsan Distry.
283419
21 of 2025-26
Open
Miscellaneous Works
Anand
8 documents required · 7 mandatory · 1 optional
₹1,500
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹50,000
Yes
9 Mar 2026
9 Mar 2026
9 Mar 2026
7 Apr 2026
9 Mar 2026
Name of work :- Construction Box Type V.R.B. in place of damaged Pipe V.R.B at ch. 1250 m
on Jalsan Distry
Sr.No Quntity Item Unit Estimated Rate without GST
Without GST Rs.
In figures In World
Dismantling the existing R.C.C Pipes Rs. One
including sorting out and stacking of Thousand
the useful materials of the following Two Hundred
diameters including refilling the Seventy &
trenches etc. complete as directed. Seventy Paise
NP_2 pipes. 1000 mm. to 1200 mm. Only
Dismantalling the existing Brick Rs. Seven
masonry including sorting out and Hundred Fifty
stacking the useful material and & Ninety
2 147.00 removing the debries and making good CM 750.90 Paise Only
the damages etc. comnpleted. (a) in
Excavation for foundation in all sorts of
soil including yellow sandy gravelly
soils ,soft & hard murrum etc. in dry
condition including depositing the Rs. One
excavated stuff in uniform layers in Hundred
3 873.00 banks or as and where directed etc. CM 107.80 Seven &
complete for lead upto 500 m and all Eighty Paise
lift. (BY MACHINERY) Only
(a) Including dewatering.
Providing & Laying in position
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including
necessary formwork, centering,
scaffolding, compaction by vibrator,
curing as directed with all lead & lift
etc complete without dewatering and
excluding the cost of steel
(A) For Footing of column / Abutment / Rs. Four
Pier / Bottom slab of barrel / Plinth Thousand
4.a 110.00 course / Coping / Approach Slab CM 4190.00 One Hundred
etc.(a) Concrete grade M-15 and MSA- Ninety Only
(A) For Footing of column / Abutment / Rs. Four
Pier / Bottom slab of barrel / Plinth Thousand Six
4.b 71.00 course / Coping / Approach Slab CM 4651.00 Hundred Fifty
etc.(e) Concrete grade M-25 and MSA- One Only
(B) For Pier and Abutments / Wing Rs. Four
wall / Head wall / Return wall / Dowel Thousand
Wall etc.(g) Concrete grade M-15 and Four
4.c 223.00 MSA-20 mm CM 4457.00 Hundred Fifty
(E) For Column / Beam / Solid Slab of Rs. Five
Road Bridge / Barrel / Cutoff wall etc. Thousand Six
4.d 94.00 (q) Concrete grade M-25 and MSA-20 CM 5642.00 Hundred
(D) For Kerb / Wearing coat. Rs. Five
(n) Concrete grade M-25 and MSA -10 Thousand
4.e 14.00 CM 5481.00 Hundred
(F) For Parapet wall of Road Bridge / Rs. Eight
Structure. Thousand
4.f 2.00 (t) Concrete grade M-25 and MSA -10 CM 8023.00 Twenty Three
Providing & Placing in position Rs. Eighty
reinforcement bars including cutting, Two
bending, welding joints where Thousand
necessary, hooking etc. complete as Ninteen Only
per drawing for all lead and lifts.
(B) TMT / CRS bars
Providing and fixing 110 mm diameter Rs. Three
P.V.C..Pipe (6 kgf / sq cm) Water spout Hundred
6 4.00 with necessary iron grating as per Rmt. 369.20 Sixty Nine &
design Twenty Paise
Providing and laying in position 110 Rs. Two
mm dia (6 kgf/sq cm) P.V.C. Pipe for Hundred
weep holes with non corroding jali in Sixty Two &
7 21.00 abutments, wing walls, retaining walls Rmt. 262.50 Fifty Paise
etc. complete. Only
Providing & Laying in position
"NOMINAL MIX" cement concrete using
cement, sand and crushed aggregate
by mass and machine mix for
C.C./R.C.C work incl. necessary
formworks centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc
complete Without Dewatering and
excluding cost of steel reinforcement.
(A) For Foundation concrete / General Rs. Three
purpose Thousand
(a) C. C. Nominal Mix, M-10 and MSA- Three
8 185.00 40 mm CM 3346.00 Hundred
Providing temporary all weather and Rs. One Lac
fair weather diversion suitable for Forty Six
traffic during the construction period Thousand
of the bridge including providing One Hundred
necessary drains and all safty Fifty Eight
9 1.00 measures including red lamps/ signals No. 146158.00 Only
at night for traffic etc. complete.
Back filling the foundation trenches Rs. Thirty Six
around the structures etc with selected & Ninety
excavated stuff including watering, Paise Only
10 182.00 ramming, compacting etc. complete. CM 36.90
Providing and laying plain/reinforced Rs. Four
cement concrete lining of M 15 (MSA Hundred
20 mm) in bed, side slopes and Fifteen &
curvature including batching, mixing, Eighty Paise
transporting, placing, vibrating, Only
smooth finishing, curing including
11 104.00 dewatering where SM 415.80
required.(MACHINERY BASED by
"FLORI" - WITHOUT PAVER WATER
10 cm thick lining in Bed / Slope
Total Rs…(Without GST)
Rs. Forty Nine Lac Forty Two Thousand Eight Hundred Seventy Seven & Fifty Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division
or as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be
filled in inkand total of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects
and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt
= Running metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs.5483.37/M.T. (Rate as per
CGWRD SOR 2023-24
Techanically Checked By me…................
Arithmetically Checked By me….....................
Deputy Executive Engineer Divisional Account Officer
Petlad Irrigation Sub Division Petlad Irrigation Division
Executive Engineer
Petlad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 21 of 2025-26 online.pdf
1 Front Page..pdf
3 Notice Inviting online Tender.pdf
5. 1250.pdf
5. Sechedule B 1250 jalsan.pdf
BOQ.pdf
SBD 1250.pdf
Download all tender documents and submit your bid