Tender Value
₹7.6 L
EMD Value
₹18,999
Closing Date
13 Mar 2023, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, Kerala Water Authority, P.H. Subdivision Parappanangadi
Annual maintenance 2023- Leak rectification works of CRWSS To Tirurangadi and WSS To Tirurangadi East under PH Section Tirurangadi
2023_KWA_564204_1
AEE/KWA/PGI/16/2022-23
Open Tender
Civil Works - Water Works
Item Rate
365 days
Tirurangadi
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,982
Yes
₹18,999
Yes
7 Nov 2023
6 Mar 2023
14 Mar 2023
6 Mar 2023
13 Mar 2023
6 Mar 2023
Amount
Leak rectification of AC pipes
100.46.1.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.1.2:Repairing leakage/breakage of 100mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.1.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.1.8:Repairing leakage/breakage of 250mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.2.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.2.2:Repairing leakage/breakage of 100mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.2.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.2.8:Repairing leakage/breakage of 250mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
Leak rectification of PVC pipes
100.47.1.1:Leak rectification work in 32mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.2:Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.3.2:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.3.a:Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.7:Leak rectification work in 250mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
Leak rectification of GI pipes
100.50.1.1:Rectification of leakages of 32mm, 40mm & 50mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.1.2:Rectification of leakages of 65mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.1.3:Rectification of leakages of 80mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.1.4:Rectification of leakages of 100mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.1.5:Rectification of leakages of 125mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
Miscelleneous
100.57.1:Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
100.56.1:Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.
100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.
100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.2:Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.32.1:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 25mm Single Acting Air Valve.
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD176848/2022-2023:Leak Rectification in 200/250/300mm CI Valve
OD176910/2022-2023:Leak Rectification in 80/100mm CI Valve
OD176911/2022-2023:Leak rectification of 125mm/150mm CI valve
100.58.1:Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting, cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete.
ABOOBACKER M K
Bidder Name
BAIJU K
ABOOBACKER M K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .