Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.0 LAccepted-AOC ERNAKULAM KERALA 682301 INDIA | ERNAKULAM | KERALA | 682301 | ₹13.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹15.0 LRejected-AOC | ₹15.0 L | 2 | Rejected-AOC L2 |
| 3 | 3₹20 LRejected-AOC | ₹20 L | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | VIJAYA ELE TECHS PRIVATE LTD. L3 | IDEAL DATACOM NETWORK AND ELECTRICAL SOLUTIONS PVT LTD L1 | GERESH ELECTRICALS PVT. LTD L2 |
|---|---|---|---|---|---|---|
| 1.01 | Removal of disconnected power cables from the existing trays/structurals/stockades/cable trenchses / walls etc, from TSP to DG PCC at TP unit, coiling and shifting the same to ERS/suitable location, for laying as incomer cables to new MCCs at ARP from PCC-1 3.5C x 300mm2 AYFY LT power cable | 3,000 | Mtrs | 6,00,000 ₹7.1 L | 3,75,000 ₹4.4 L | 4,38,000 ₹5.2 L |
| 2.01 | Laying, dressing and clamping of following LT power cables from PCC-1 panel to new MCCs at new MCC room for ARP, through existsing/new cable trays /structurals / stockades/ cable trenches / walls etc. LT power cables shall be supplied by KMML. All other materials required for dressing and clamping shall be supplied by the contractor. 3.5C x 300mm2 AYFY LT power cable | 2,800 | Mtrs | 5,60,000 ₹6.6 L | 3,50,000 ₹4.1 L | 4,62,000 ₹5.5 L |
| 3.01 | Transporting from C-store, assembling, mounting and installation of the following new panels in the locations provided inside the MCC room after necessary fabrication and minor civil work as per the scope of work. Panels shall be double earthed using GI earth flat of 65x10 mm as per standards from the nearest earth grid. (Approx: 150 mtrs through stokade) GI strip & required MS items shall be supplied by KMML. New MCC 7 of dimension 4400 (L)x700 (W)x 2375(H)mm (3 sections) | 1 | No. | 45,000 ₹53,100 | 1,00,000 ₹1.2 L | 60,000 ₹70,800 |
| 3.02 | New MCC 8 of dimension 3500 (L)x700 (W)x 2375(H)mm (2 sections) | 1 | No. | 35,000 ₹41,300 | 1,00,000 ₹1.2 L | 30,000 ₹35,400 |
| 3.03 | EMCC-ARP of dimension 2400 (L)x600 (W)x 2300(H)mm | 1 | No. | 25,000 ₹29,500 | 50,000 ₹59,000 | 20,000 ₹23,600 |
| 4.01 | Glanding and termination at panel and motor side of AYFY cables using DC glands/ lugs including supply of cable glands, lugs, aluminium crimping sockets, nuts bolts etc. required for this work. Gland earthing as per standards shall be done by the contractor. 3.5C x 300mm2 AYFY LT power cable | 16 | Nos. | 56,000 ₹66,080 | 72,000 ₹84,960 | 80,000 ₹94,400 |
| 5.01 | Erection of new 600/300/200 mm GI ladder type cable trays along the existing / newly fabricated cable tray support structure. Trays shall be jointed with GI side coupler using stainless steel bolts & nuts. The coupling holes shall be modified for proper coupling, if required. Required quantity of GI cable trays and coupling plates shall be supplied by KMML. All other materials required including SS nuts and bolts shall be supplied by contractor. | 960 | Mtrs | 3,84,000 ₹4.5 L | 2,01,600 ₹2.4 L | 1,44,000 ₹1.7 L |
| 6.01 | Erection and installation of new structural supports for cable trays along racks/columns/walls/trenches/stockade etc. Newly fabricated supports shall be painted with one coat of primer and one coat of paint (to MS items) before installation and remaining one coat of paint shall be provided after errection. MS items shall be supplied by KMML; required paint (make:Asian/Nerolac/ Shalimar/ Berger) shall be supplied by contractor. | 3 | MT | 2,55,000 ₹3.0 L | 225 ₹265.50 | 2,40,000 ₹2.8 L |
| 7.01 | Preparation of all electrical drawings and obtaining initial scheme approval and energisation sanction from electrical inspectorate for the new MCCs (7,8 &E. MCC) at ARP including temporary approval for 6 months for the exisitng MCCs ( 7 & 8) | 1 | Lot | 40,000 ₹47,200 | 50,000 ₹59,000 | 25,000 ₹29,500 |
Tender Value
₹16 L
EMD Value
₹40,000
Closing Date
29 Nov 2025, 9:00 amClosed
JGM and HoU TP
TP Unit Sankaramangalam Chavara Kollam
Erection, Installation, Testing and Commissioning of New MCCs in ARP
2025_KMML_814444_1
TP/ELE/ARP/MCC/2025-26
Open Tender
Electrical Works
120 days
TP Unit, KMML
As per tender
4 documents required · 4 mandatory
₹2,832
₹40,000
TP Unit KMML Kollam
3 Mar 2026
24 Oct 2025
1 Dec 2025
24 Oct 2025
29 Nov 2025
6 Nov 2025
24 Oct 2025 - 6 Nov 2025
6 Nov 2025
Removal of disconnected power cables from the existing trays/structurals/stockades/cable trenchses / walls etc, from TSP to DG PCC at TP unit, coiling and shifting the same to ERS/suitable location, for laying as incomer cables to new MCCs at ARP from PCC-1 3.5C x 300mm2 AYFY LT power cable
Laying, dressing and clamping of following LT power cables from PCC-1 panel to new MCCs at new MCC room for ARP, through existsing/new cable trays /structurals / stockades/ cable trenches / walls etc. LT power cables shall be supplied by KMML. All other materials required for dressing and clamping shall be supplied by the contractor. 3.5C x 300mm2 AYFY LT power cable
Transporting from C-store, assembling, mounting and installation of the following new panels in the locations provided inside the MCC room after necessary fabrication and minor civil work as per the scope of work. Panels shall be double earthed using GI earth flat of 65x10 mm as per standards from the nearest earth grid. (Approx: 150 mtrs through stokade) GI strip & required MS items shall be supplied by KMML. New MCC 7 of dimension 4400 (L)x700 (W)x 2375(H)mm (3 sections)
New MCC 8 of dimension 3500 (L)x700 (W)x 2375(H)mm (2 sections)
EMCC-ARP of dimension 2400 (L)x600 (W)x 2300(H)mm
Glanding and termination at panel and motor side of AYFY cables using DC glands/ lugs including supply of cable glands, lugs, aluminium crimping sockets, nuts bolts etc. required for this work. Gland earthing as per standards shall be done by the contractor. 3.5C x 300mm2 AYFY LT power cable
Erection of new 600/300/200 mm GI ladder type cable trays along the existing / newly fabricated cable tray support structure. Trays shall be jointed with GI side coupler using stainless steel bolts & nuts. The coupling holes shall be modified for proper coupling, if required. Required quantity of GI cable trays and coupling plates shall be supplied by KMML. All other materials required including SS nuts and bolts shall be supplied by contractor.
Erection and installation of new structural supports for cable trays along racks/columns/walls/trenches/stockade etc. Newly fabricated supports shall be painted with one coat of primer and one coat of paint (to MS items) before installation and remaining one coat of paint shall be provided after errection. MS items shall be supplied by KMML; required paint (make:Asian/Nerolac/ Shalimar/ Berger) shall be supplied by contractor.
Preparation of all electrical drawings and obtaining initial scheme approval and energisation sanction from electrical inspectorate for the new MCCs (7,8 &E. MCC) at ARP including temporary approval for 6 months for the exisitng MCCs ( 7 & 8)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tender_doc.pdf
Tender Documents • 0.44 MB
GA_MCCs.pdf
Other Document • 4.52 MB
GCC_SR.pdf
Additional Documents • 0.07 MB
BOQ_1362353.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid