| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 CrAccepted-AOC UTTAR PRADESH UP | ₹22.6 Cr | L1 | Accepted-AOC Qualified |
| 2 | L2₹23.6 CrRejected-Finance | ₹23.6 Cr | L2 | Rejected-Finance NOt Qualified for AOC |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Finance D 57 35B SIDDHIGIRI BAGH SIGRA VARANASI UTTAR PRADESH UP | VARANASI | UTTAR PRADESH | 221001 | - | - | Not Admitted-Finance Not qualified for AOC |
| 5 | Not Admitted-Finance AT NAVAKAPURA BADI BAG LANKA GHAZIPUR UTTAR PRADESH PINCODE 233001 BRACH OFFICE ADD VILL PO KULHARIYA BLOCK DISTRICT BUXAR STATE BIHAR PINCODE 802101 | BUXAR | BIHAR | 802101 | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹28.5 Cr
EMD Value
₹42.8 L
Closing Date
9 Jul 2024, 12:00 pmClosed
Gagan
Superintending Engineer, Varanasi Circle, PWD Vara
Widening and Strengthening of Mughalsarai Bhupauli Chahania Road
2024_CEUVZ_929434_1
2023/183Com-Varanasi Circle/2024-25 Dt. 05.06.2024
Open Tender
Civil Works
455 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,590
₹42.8 L
Yes
11 Nov 2024
15 Jun 2024
9 Jul 2024
15 Jun 2024
9 Jul 2024
15 Jun 2024
Amount
Construction of Embankment with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (For Bogi Action) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying primer coat with SS grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Dense Graded Bituminous Macadam Grading 2 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying tack coat-2 with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Bituminous Concrete Grading 2 Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of Embankment with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Cast cement concrete as in door sills, chaukhat boundary post as similar precast unit with cement, approved coarse sand and 20, gauge approved stone ballast in the proportion of 1:2:4 (class-150) excluding supply of reinforcement and its bending but including its fixing in position and binding with 24 B.W.G.G.I. binding wire and including necessary scentring and shuttering etc,. and also including supply of all material, labour, T&P etc. required for proper completion of work. Binding wire to be supplied by the contractor free of cost. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Mild steel or iron in plain work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
RCC Grade M25 using batching plant transit mixer & Concrete pump (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Dewatering as per SOR (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing & laying HP 600mm dia NP-3 with coller etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing & laying HP 1000 mm dia NP-3 with coller etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Excavation in Soil using Hydraulic Excavater and Tippers with Disposal upto 1000 meeters. As per Morth Specification no 301 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
ganga sagar singh
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid