| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance | ₹2.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.2 Cr+₹1.3 L (0.57%)Rejected-Finance | ₹2.2 Cr+₹1.3 L (0.57%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 Cr+₹80.3 L (36.1%)Rejected-Finance | ₹3.0 Cr+₹80.3 L (36.1%) | L3 | Rejected-Finance L3 |
Tender Value
₹2.4 Cr
EMD Value
₹1 L
Closing Date
5 Jun 2021, 5:00 pmClosed
Deputy Conservator of Forests and Wildlife Warden
Wayanad Wildlife Division Sulthan Bathery P O Wayanad Dist. Kerala Pin 673592
KIIFB Phase-II - Construction of Crash Guard Rope Fencing in Vadakkanad area (4.50 Km) under Kuppady Forest Station in Kurichiat Range of Wayanad Wildlife Division (Re E-Tender)
2021_FD_423459_1
W6-9466/2019
Open Tender
Civil Works - Others
Item Wise
300 days
Vadakkanad area under Kurichiat Range
Please refer tender Notice and documents
8 documents required · 8 mandatory
₹7,500
Yes
₹1 L
Yes
24 Apr 2023
20 May 2021
9 Jun 2021
20 May 2021
5 Jun 2021
20 May 2021
Amount
Fencing at VADAKKANAD-4500m
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.5.3 : DOWEL BARS - Supplying and Providing MS dowel bars of size 25 mm dia of 2.0m long (1m in rock and 1m in concrete ) including drilling holes of 30mm dia and filling the gap with cement grout( 0.50kg/each) etc complete
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.33.1 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.34.1 : Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
od282394/2020_2021 : Carriage of Heavy materials where each piece or bundle, crate or case weighs more than one<br>tonne and R.C.C., C.I. and concrete Pillars or pipes.
od282447/2020_2021 : Distribution and erection charges for RCC pillars using crane machinery (8 hrs of crane per day will install 10 intermediate posts or 5 Anchor posts
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
19.35.2 : Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete.600 mm dia RCC pipes.
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
18.7.6 : Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer -in-Charge. Internal work - Exposed on wall50 mm nominal outer dia pipes
od277257/2020_2021 : :Providing and fixing ISMC series channel vertical post, 150 x 75 x 5 mm spaced 4/4.5 m<br>centre to centre, 4 m high, 1 m below ground/road level, all steel parts and fitments to be galvanised by hot<br>dip process, all fittings to conform to IS:1367 and IS:1364
od277258/2020_2021 : :Wire rope placed in either side of collapsed anchor hook on either side with the help of<br>tighter assembly fixed in concrete block including the cost of jointing the ropes using 16 mm dia
od277259/2020_2021 : :Wire rope placed in either side of collapsed anchor hook on either side with the help of<br>tighter assembly fixed in concrete block including the cost of jointing the ropes using 12 mm dia
od277260/2020_2021 : :Wire rope placed in either side of collapsed anchor hook on either side with the help of<br>tighter assembly fixed in concrete block including the cost of jointing the ropes using 6 mm dia
od277261/2020_2021 : :Providing and fixing tighter assembly including tighter,U clamp,Nut and bolts,Stell<br>plates,pulley,brass bushes on both end sides , sleeves and other accessories,etc complete.(for 16mm rope)
od277262/2020_2021 : :Providing and fixing tighter assembly including tighter,U clamp,Nut and bolts,Stell<br>plates,pulley,brass bushes on both end sides , sleeves and other accessories,etc complete.(for 6mm rope)
od277263/2020_2021 : :Providing and fixing tighter assembly including tighter,U clamp,Nut and bolts,Stell<br>plates,pulley,brass bushes on both end sides , sleeves and other accessories,etc complete.(for 12mm rope)
od277264/2020_2021 : :Providing and fixing U clamp for holding 8mm vertical bar on steel wire<br>rope.intermediate portion
BOBY SEBASTIAN
SUMCON INFRAVENTURES LLP
Bidder Name
Lee Builders
BOBY SEBASTIAN
SUMCON INFRAVENTURES LLP
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .