Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC NEAR TARAPUR LAXMI DRIVING SCHOOL TARAPUR MOHANPUR WEST TRIPURA 799211 | WEST TRIPURA | TRIPURA | 799211 | ₹9.9 L Quoted ₹10.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.4 L+₹14,284.79 (1.40%)Rejected-Finance BHUMIHIN COLONY EAST NOAGAON RANIRBAZAR WEST TRIPURA PIN 799035 | RANIRBAZAR | WEST TRIPURA | TRIPURA | 799035 | ₹10.4 L+₹14,284.79 (1.40%) | L2 | Rejected-Finance L2 |
Tender Value
₹9.6 L
EMD Value
₹19,174
Closing Date
28 May 2026, 3:00 pmClosed
Executive Engineer
O/O Executive Engineer, DWS DivnII, Agartala
Please refer to the DNIe-T
2026_CEDWS_73072_1
17/DNIeT/EE/DWS/AGT-II/2026-27
Open Tender
Civil Works - Water Works
Percentage
120 days
Agartala
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹19,174
13 Aug 2026
19 May 2026
28 May 2026
19 May 2026
28 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kind of soils. | 1 | Cum | 231.6 | ₹231.37 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
-All kind of soil | - | Cum | 161.3 | - |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | Cum | 1,177.3 | - |
| 4 | Demolishing cement concrete manually/ mechanicalmeans including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of Engineer-in-charge. ( I ) Nominal concrete 1 : 4 : 8 or leaner mix (i/c. equivalent design mix ) | 1 | Cum | 911.7 | ₹910.79 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to Plinth level
i) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | - | Cum | 8,980 | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | Cum | 11,080.4 | - |
| 7 | Centering shuttering including struttings, propping etc. and removal of form work for: | - | - | - | - |
| - | i) Foundations, footings, bases for columns etc. for mass concrete with timber plank | 1 | Sqm | 333.9 | ₹333.57 |
| - | ii) Suspended floors, roofs, landings, balconies and access platform with timber planks | - | Sqm | 577.1 | - |
| - | iii) Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | - | Sqm | 391 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74363.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.16 MB
DNIeT17.pdf
Tender Documents • 4.90 MB
BOQ_74363.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .