| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹47.0 L+₹1.7 L (3.83%)Rejected-Finance INS VALSURA JAMNAGAR | JAMNAGAR | GUJARAT | 360520 | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹53.0 L+₹7.7 L (17.0%)Rejected-Finance | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹53.8 L+₹8.5 L (18.8%)Rejected-Finance PARTH B 203 PATEL COLONY STREET NO 11 ROAD NO 3 JAMNAGAR 361 006 GUJARAT | JAMNAGAR | GUJARAT | 361006 | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹54.2 L+₹8.9 L (19.6%)Rejected-Finance | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Jyoti Refrigeration L5 | JAMNAGAR ELECTRIC AND MACHINERY CO L9 | M/s Jagdish Machinery Stores L2 | SIBS CONTRACTOR L6 | suvidhiconstruction L3 | M/s. Vimal Enterprise L1 | M/s Balaji Enterprise L4 | Hirachand Sunderji and co L7 | k s enterprises L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Notes for all items of Schedule 'A' :- (i) The water supply line repair work to be carried out both in Defence Cantt as well as in Civil area in any description and in different locations in full / part. (ii) It is the responsibility of the Contractor to ensure that repair work is nowhere hampered during any stage i.e. currency of contract as such contractor shall prepare well in advance by liaisoning with concerned State / Central department authorities under whose jurisdiction it lies, in no case work to be stopped in half way for want of permission etc in case necessary fee if any shall be borne by the contractor for which no payment shall be reimbursed. (iii) Necessary barricade, diversion boards and necessary safety signs etc as per safety norms shall be made & arranged by Contractor without any extra cost to Govt. (iv) During execution damage occurred to any sort structure etc the same shall be made good to its original specification by the contractor without any extra cost to Govt. (v) In case of road cutting inside Defence Cantt is inevitable the same shall be cut to required size and shape only after obtaining written approval of Engineer-in Charge, in no case road cutting be done without written approval of EIC. Vice versa if road cutting in Civil area is inevitable in that case necessary prior permission to be obtained by the contractor from concerned Govt authorities. In case of any fees etc the same shall be borne by the contractor without any extra cost to Govt. The road cutting shall be measured and paid separately under relevant items. Notes Contd.... | ||||||||||||
| 1.01Notes for all items of Schedule 'A' Contd/- (vi) Work shall be commencement and completed within the time slots allotted by EIC to the contractor for the said work. (vii) Engineer-in-Charge shall strictly ensure that the Work shall be carried out in batch wise portion of pipe line for replacement and span and ensure batch work shall be completed by contractor on the same day and pipe line shall be made ready for regular water supply in case the same is inescapable alternative / temporary arrangement shall be made by the contractor without any extra cost to Govt as directed by EIC so that regular water supply shall not be hampered. (viii) Excavation and earth work shall be measured and paid for separately unless specifically mentioned in respective item. (ix) Quoted rate for various items in BOQ shall deemed to be inclusive as said in above Notes, no extra payment what so ever shall be entertained by the department. | ||||||||||||
| 2.00 | Taking down cement plaster of any description on PCC/stone surface/brick surfaces including racking out joints, hacking for key scrubbing down with water etc and removal of entire debris as ordered outside MoD land complete all as specified and as directed. | 59 | Square Metre | 50 ₹2,950 | 57 ₹3,363 | 40 ₹2,360 Lowest | 50 ₹2,950 | 46 ₹2,714 | 350 ₹20,650 | 82 ₹4,838 | 40 ₹2,360 Lowest | 66 ₹3,894 |
| 3.00 | Demolition of brickwork/PCC block or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of entire debris as ordered outside MoD land complete all as specified and as directed. | 1.5 | Cubic Metre | 150 ₹225 | 169 ₹253.5 | 120 ₹180 | 100 ₹150 Lowest | 125 ₹187.5 | 350 ₹525 | 161 ₹241.5 | 150 ₹225 | 120 ₹180 |
| 4.00 | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for in this Schedule and removal of entire debris as ordered outside MoD land complete all as specified & as directed. | 2 | Cubic Metre | 225 ₹450 | 270 ₹540 | 200 ₹400 | 250 ₹500 | 250 ₹500 | 400 ₹800 | 320 ₹640 | 200 ₹400 | 199 ₹398 Lowest |
| 5.00 | Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. laying cables, pipes, etc. not exc 10 Sqm on plan & not exc 1.5m in depth and getting out in soft/ loose soil complete all as specified and as directed. | 480 | Cubic Metre | 320 ₹1,53,600 | 338 ₹1,62,240 | 300 ₹1,44,000 Lowest | 315 ₹1,51,200 | 324 ₹1,55,520 | 310 ₹1,48,800 | 415 ₹1,99,200 | 300 ₹1,44,000 Lowest | 331 ₹1,58,880 |
| 6.00 | Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. laying cables, pipes, etc. not exc 10 Sqm on plan & not exc 1.5m in depth and getting out in hard/ dense soil complete all as specified and as directed. | 20 | Cubic Metre | 535 ₹10,700 | 563 ₹11,260 | 450 ₹9,000 | 510 ₹10,200 | 500 ₹10,000 | 400 ₹8,000 Lowest | 525 ₹10,500 | 450 ₹9,000 | 499 ₹9,980 |
| 7.00 | All as per item No. 6 here-in-above but exc 1.5 m and not exc 3.0 m in depth -do- | 5 | Cubic Metre | 725 ₹3,625 | 788 ₹3,940 | 600 ₹3,000 | 700 ₹3,500 | 850 ₹4,250 | 450 ₹2,250 Lowest | 825 ₹4,125 | 650 ₹3,250 | 655 ₹3,275 |
| 8.00 | Returning, filling in trenches, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soil complete all as specified and as directed. | 450 | Cubic Metre | 100 ₹45,000 | 135 ₹60,750 | 110 ₹49,500 | 125 ₹56,250 | 116 ₹52,200 | 70 ₹31,500 Lowest | 260 ₹1,17,000 | 100 ₹45,000 | 125 ₹56,250 |
| 9.00 | Removing excavated surplus soil to a distance not exceeding 50 mts and depositing where directed at a level not exceeding 1.5 M above the starting point complete all as directed. | 55 | Cubic Metre | 150 ₹8,250 | 147 ₹8,085 | 120 ₹6,600 | 140 ₹7,700 | 145 ₹7,975 | 90 ₹4,950 Lowest | 265 ₹14,575 | 100 ₹5,500 | 149 ₹8,195 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
16 May 2026, 6:00 pmClosed
GE (I) Navy Jamnagar
INS Valsura, Jamnagar - 361 150
Repair/ maintenance of Water Supply System and replacement of Rising Mains from main source Army Land and OHT and Distribution Mains of CI/ DI Pipe Line alongwith connected works under GE (I) Navy Jamnagar
2026_MES_762407_1
8954/VAL/E8
Open Tender
Civil Works - Water Works
Item Rate
335 days
GE (I) Navy Jamnagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE (I) Navy Jamnagar
₹80,000
Yes
25 May 2026
27 Apr 2026
18 May 2026
27 Apr 2026
16 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Taking down cement plaster of any description on PCC/stone surface/brick surfaces including racking out joints, hacking for key scrubbing down with water etc and removal of entire debris as ordered outside MoD land complete all as specified and as directed. | 59 | Square Metre | - | - |
| 3 | Demolition of brickwork/PCC block or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of entire debris as ordered outside MoD land complete all as specified and as directed. | 1.5 | Cubic Metre | - | - |
| 4 | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for in this Schedule and removal of entire debris as ordered outside MoD land complete all as specified & as directed. | 2 | Cubic Metre | - | - |
| 5 | Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. laying cables, pipes, etc. not exc 10 Sqm on plan & not exc 1.5m in depth and getting out in soft/ loose soil complete all as specified and as directed. | 480 | Cubic Metre | - | - |
| 6 | Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. laying cables, pipes, etc. not exc 10 Sqm on plan & not exc 1.5m in depth and getting out in hard/ dense soil complete all as specified and as directed. | 20 | Cubic Metre | - | - |
| 7 | All as per item No. 6 here-in-above but exc 1.5 m and not exc 3.0 m in depth -do- | 5 | Cubic Metre | - | - |
| 8 | Returning, filling in trenches, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soil complete all as specified and as directed. | 450 | Cubic Metre | - | - |
| 9 | Removing excavated surplus soil to a distance not exceeding 50 mts and depositing where directed at a level not exceeding 1.5 M above the starting point complete all as directed. | 55 | Cubic Metre | - | - |
| 10 | M&L for cement concrete 1:2:4 type B1, using 20mm graded crushed stone aggregate as in lintels upto 1.5m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, roof kerbs, mud stops and the like including weathering, slightly rounded, chamfered angle and throating as directed including use and waste of form work (straight or curved) all exposed surface of concrete finished fair complete all as specified & as directed. | 2 | Cubic Metre | - | - |
| 11 | M&L for brick work with old size Fly Ash bricks, straight or curved on plan exc 6.00 metre mean radius, built in cement mortar 1:6 complete all as specified and as directed. | 1.5 | Cubic Metre | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
8954TENDER.pdf
Tender Documents • 0.84 MB
BOQ_853999.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .