Loading…
Loading…
Tender Value
₹11.4 L
EMD Value
₹11,400
Closing Date
31 Aug 2026, 4:00 pm
Executive Officer, Rajgangpur Municipality
Executive Officer, Rajgangpur Municipality
Extension of Artificial Immersion Pond Near liploi Bridge, Ward No.11
2026_ORULB_139346_1
EO/RGP/03 of 2026-27
Open Tender
Civil Works - Others
Percentage
45 days
Rajgangpur Municipality
Please refer Tender documents
2 documents required · 2 mandatory
₹6,000
₹11,400
Yes
21 Aug 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation, loading, unloading and cariiage by mechanical means of all kind of soil including stoney earth, gravel and moorum etc. inter spread with boulder up to 1/2 cum. Size with all lifts & delifts including trimming os alopes and bed section and depositing the excavated materials away from site as per the specifications an as directed by the Engineer-in-charge within an initial lead of 1Km from the place of excavation complete | 882 | Cum. | 66.38 | ₹58,547.16 |
| 2 | Earth in excavation in all kinds of soil in F&P with 50 mtr intial lead and 1.5 mtr lift including cost of all labour etc complete in all respect. | 21.52 | Cum. | 282.89 | ₹6,087.79 |
| 3 | Filling foundation and plinth with coarsed river sand as per direction of department including cost, conveyance, royalty, taxes of all materials and labour etc. Complete in all respect. | 40.3 | Cum. | 751.85 | ₹30,299.56 |
| 4 | Cement Concrete (1:3:6) in foundation and floors by using 4cm (1-1/2") size hard crusher broken granite stone metal of including laying , watering etc. Complete to required levels laid in layers including all leads and lifts, T&P etc. complete. | 40.3 | Cum. | 5,829.07 | ₹2,34,911.52 |
| 5 | Reinforced cement concrete (M20) with 20 mm & down garded size CBHG chips including hoisting and laying in position compacting to proper design section including rigid smooth centering, shuttering with cost, conveyance, royalty, taxes of all materials, | 66.67 | Cum. | 6,152.72 | ₹4,10,201.84 |
| 6 | Providing reinforcement for RCC work with cutting, bending, binding and cost of rod complete. | 23.8 | Qtl. | 8,960.82 | ₹2,13,267.52 |
| 7 | Provision for fitting fixing of Out Let Valve for proper drainage & cleaning Purposed & paid as per actual | 1 | L.S. | 8,000 | ₹8,000 |
| 8 | Assuming L.S. amount towards tranparenecy pillar/ display board & phography etc. | 1 | L.S. | 5,000 | ₹5,000 |
| 9 | Adding 18% for GST | 1 | L.S. | 1,73,948 | ₹1,73,948 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_606915.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].