Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.3 CrAdmitted-Finance | ₹1.3 Cr | Admitted-Finance |
| 2 | ₹1.4 CrAdmitted-Finance | ₹1.4 Cr | Admitted-Finance |
| 3 | ₹1.6 CrAdmitted-Finance | ₹1.6 Cr | Admitted-Finance |
| 4 | ₹1.6 CrAdmitted-Finance | ₹1.6 Cr | Admitted-Finance |
| 5 | ₹1.7 CrAdmitted-Finance NASHIK | NASHIK | ₹1.7 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Precision Electrical Works | Limra Electricals | Radha Electricals | ROYAL ELECTRICAL WORKS | R K Infra Electricals Private Limited | SRI SHARABHESHWARA ASSOCIATES |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | PART - A Supplying of 11kV HT Metering cubicle of CT Ratio Single phase 40/1A, PT Ratio Single phase 11kV/110V. Both side cable entry type with 3CT & 3PT’s With Transparent Cover TTB, Modem and 2 No’s of Trivector Meters for 3Ph 4 Wire class 0.2S, Metering job includes providing rainy shelter. | 1 | No. | 2,40,000 ₹2,83,200 | 2,00,000 ₹2,36,000 Lowest | 2,65,000 ₹3,12,700 | 2,67,234.9 ₹3,15,337.18 | 2,36,250 ₹2,36,250 | 2,94,776 ₹3,47,835.68 |
| 2.00 | Erection of HT metering Cubicle on Platform. - Ordinary Soil | 1 | No. | 4,002 ₹4,722.36 | 10,000 ₹11,800 | 15,000 ₹17,700 | 2,023.97 ₹2,388.28 Lowest | 6,750 ₹6,750 | 2,233 ₹2,634.94 |
| 3.00 | Supplying of 10KV 5kA Lightning Arrestor (LA) Polymeric type with GROUND DISCONNECTOR | 3 | Set | 10,530 ₹12,425.4 | 24,000 ₹28,320 | 19,500 ₹23,010 | 15,647.37 ₹18,463.9 | 3,036 ₹3,036 Lowest | 17,259 ₹20,365.62 |
| 4.00 | Fixing of lightning arrestors including wiring. - Ordinary Soil | 3 | Set | 750 ₹885 | 3,000 ₹3,540 | 450 ₹531 | 391.86 ₹462.39 | 405 ₹405 Lowest | 432 ₹509.76 |
| 5.00 | Supplying of HG Fuse 11KV Class Solid Core Type | 3 | Set | 4,125 ₹4,867.5 | 15,000 ₹17,700 | 7,500 ₹8,850 | 3,519.99 ₹4,153.59 | 2,631 ₹2,631 Lowest | 3,882 ₹4,580.76 |
| 6.00 | Fixing DOLO cutouts / Horn Gap Fuses including fixing of cross arms and wiring - Ordinary Soil | 3 | Set | 900 ₹1,062 | 1,500 ₹1,770 | 1,650 ₹1,947 | 780.39 ₹920.86 | 405 ₹405 Lowest | 861 ₹1,015.98 |
| 7.00 | Supplying of 11kV 200Amps Single Break GOS | 3 | Set | 24,375 ₹28,762.5 | 60,000 ₹70,800 | 46,500 ₹54,870 | 31,116.96 ₹36,718.01 | 20,655 ₹20,655 Lowest | 34,323 ₹40,501.14 |
| 8.00 | Fixing of GOS including wiring (11kV SB 200A) - Ordinary Soil | 3 | Set | 4,500 ₹5,310 | 3,000 ₹3,540 Lowest | 4,500 ₹5,310 | 3,635.25 ₹4,289.6 | 4,050 ₹4,050 | 4,011 ₹4,732.98 |
| 9.00 | Supplying of H - Frame Set for 11kV, 200Amps Single Break GOS Mounting – GI | 3 | Set | 15,000 ₹17,700 | 45,000 ₹53,100 | 25,500 ₹30,090 | 19,990.59 ₹23,588.9 | 15,390 ₹15,390 Lowest | 22,050 ₹26,019 |
| 10.00 | Erection of H Frame. - Ordinary Soil | 3 | Set | 1,500 ₹1,770 | 6,000 ₹7,080 | 4,500 ₹5,310 | 1,063.56 ₹1,255 Lowest | 2,025 ₹2,025 | 1,173 ₹1,384.14 |
Tender Value
₹1.2 Cr
EMD Value
₹2.9 L
Closing Date
3 Oct 2025, 4:00 pmClosed
Executive Engineer Ele.2
Electrical Division, 2nd floor, Admin Building, NMPA, Panambur Mangaluru
Supply, Installation, Testing and Commissioning (SITC) of 11KV/0.433 KV, 750 KVA Package Substation with HT UG Cable from MESCOM Substation to Berth No. 1 to feed Power Supply to Indian Coast Guard Ships
2025_NMPT_876648_1
1/ICG-Supply/EE(E)II/2025 dtd. 12.09.2025
Open Tender
Electrical Works
Works
120 days
NMPA, Panambur Mangaluru
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,680
Yes
Payable To
₹2.9 L
Yes
20 Nov 2025
12 Sept 2025
4 Oct 2025
12 Sept 2025
3 Oct 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tenderdocument.pdf
Tender Documents • 1.80 MB
BOQ_921502.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .