Supply, erection, testing & commissioning of 220KV 1Cx1200 Sq.mm,2x(3+0) copper conductor XLPE U/G cable laying LILO from Prop.220KV M/C cable termination tower to 220KV Kanbha GIS from Existing Ranasan Karamsad S/C line with Deer Conductor(Route length:0.300Km U/G)..”
321268
ACE(P&C)/Contracts/SS/E-466/220kV/UG/S&L,E
Open
Electrical Works
Works
Vadodara
31 documents required · 22 mandatory · 9 optional
₹11,800
Gujarat Energy Transmission Corporation Vadodara
₹3 L
7 Jul 2026
7 Jul 2026
7 Jul 2026
29 Jul 2026
7 Jul 2026
Estimated Cost of laying of two equal lengths of FOAC (Fiber Optic Approach Cable) ( DWSM - Dual window single mode, 48F) - with installation hardware like ties / clips / cleats, conduits,
HDPE ducts, supports, fittings, accessories etc with required arrangement to lay along side of U/G cable - (Annexure-B1 (Supply) & B2 (Erection))
Estimated Cost (Supply Part) (Annexure-B1)
Sr.No. Name of Line FOAC Single Length Nos. of such sigle length of FOAC (Total length of FOAC (DWSM 48F) =[((A) * (B)) + Length of
(DWSM 48F) (meter) required approach cable from Gantry upto Communication room (400 Mtr)
(A) (B) ] meter (C )
1 LILO of 220kV Ranasan-Karamsad to 220kV Kanbha GIS 480 2
Estimated Cost (Erection Part) (Annexure-B2)
Sr.No. Name of Line FOAC Single Length Nos. of such sigle length of FOAC (Total length of FOAC (DWSM 48F) =[((A) * (B)) + Length of
(DWSM 48F) (meter) required approach cable from Gantry upto Communication room (400 Mtr)
(A) (B) ] meter (C )
LILO of 220kV Ranasan-Karamsad to 220kV Kanbha GIS 480 2
(1) Existing OPGW at Loc no 195 shall be open & OPGW shall be back pull upto Existing Loc no 191 and restringing shall be done between existing loc no 191 to proposed Loc no DD type & Proposed MD type tower and
spliced with FOAC cable from Kanbha SS.
(2) New OPGW with approx length 1100 mtr stringing work to be done between Proposed MD type tower & Loc no
(3) Around 800 mtr of OPGW will be avilable spare after back pulling & same shall be tested for OTDR & credited to Nadiad Store in co-ordination with EE(Telecom) Ranasan
(4) After completion of this arrangement work of FOAC & OPGW, for above LILO work of 220kV Ranasan-Karamsad Lilo Kanbha Line , it shall be tested for End to End test & trace report shall be submitted for approval.
Following points are important from work execution perspective, same may please be noted.
i) Fiber optic approach cable (FOAC) shall be laid with 220kV cable system strictly as per approved method of construction i.e MOC. Each run of FOAC shall be of continuous length, no in between splicing is allowed.
ii) Two to Three rings of extra loop length shall be kept buried underground at foot of both end termination tower after laying FOAC cable with 220kV cable as per MOC.
iii) FOAC cable length remain outside and above the ground level shall be 2 times the height of each termination tower at both end. Each run of FOAC cable coming out after laying in underground section should be
brought up to third cross arm of termination tower after passing it through HDPE pipes and properly tying up with tower. Also, each run of FOAC cable shall be terminated in individual joint box on each termination
iv) Balance length of each FOAC cable (i.e. Approximately half of tower height) after bringing out the FOAC cable above from ground level and up to third cross arm of termination tower, it shall be managed in rings
properly with fixing clamp arrangement to hold up it on end termination tower.
v) As per standard format "End to End test.pdf" in , after laying FOAC cable, each length shall be tested for end to end test using power meter and OTDR. Original copy of Test report duly sealed and signed with date,
name & designation of testing person, executing contractor and witnessing officer one each from telecom as well as TR/Const. nominated from respective EE(Telecom) and EE(TR)/EE(const.) respectively, shall be
submitted to under signed & one copy to respective telecom unit, invariably without fail
vi) Only after getting clearance on validity of test report submitted to this office, filed officer will take further necessary action on commercial part.
vii) DRS (Data requirement sheet) and drawing approval shall be taken for FOAC & joint box before kick starting any erection activity. The work executing contractor must have to do correspondence on eamil to concern
EE (Const.) with copy to project & engineering department, corporate office, GETCO for necessary concurrence and intimation about to start erection/laying.
OPGW BOQ for 220 kV 1Cx1200 sq. mm, 2x(3+0) Copper conductor XLPE U/G cable for LILO from prop. 220 kV M/C cable termination tower to
220 kV Kanbha GIS from existing 220kV S/C Ranasan Karamsad line
(1) Supply, Laying, erection, testing and commissioning of 24 Fiber (DWSM) OPGW Cable (Live Line) including Installation hardware set and all
cable fittings & accessories alongwith approach cable Joint box. [Installation Hardware set & accessories for above OPGW i.e. all cable fittings &
accessories like suspension clamps, tension clamps, vibration dampers, earthing clamps, down lead clamps, in-line splice enclosures etc.
including Pigtails FC-PC type (with installation hardware like ties, clips, cleats, conduits, ducts, supports, fittings, accessories etc).
(1a) Supply Part
Sr.No. Description Qty.(KM)
1a.1 24 Fibre (DWSM) OPGW fibre Optic cable
1a.2 Installation Hardware set * & accessories for above OPGW i.e. all cable fittings & accessories like suspension clamps,
tension clamps, vibration dampers, earthing clamps, down lead clamps, in-line splice enclosures etc. including Pigtails
(with installation hardware like ties/clips / cleats, conduits, ducts, supports, fittings, accessories etc).
(Any variation in quantities shall be absorbed by contractor)
(1b) Erection Part
Sr.No. Description Qty.(KM)
1b.1 Complete Installation of OPGW cable (24 Fibers) including laying , providing required hardwares, in line splices to be
encased in Fibre Optic Splice Enclosures, Laying & termination of a fibre optic approach cable required to connect
Overhead Fiber Optic Cable (OPGW) between the final in line splice enclosure on the gantry/tower and the Fibre Optic
Distribution Panel (FODP) to be installed within the building at both the sub-station ends as per technical specification.
1b.2 Link up of OPGW Cable including all related activities.
(1) After completion of this arrangement work of OPGW, for 220kV Ranasan-Karamsad Lilo Kanbha Line, it shall be tested for End to End test &
test report duly sealed & signed with name and dated signature of testing personal, Witnessing Officer of GETCO, executing contractor to whom
GETCO has placed order as well as concern EE (Const.) alongwith .SOR files shall be submitted for approval. However, other testing requirement
during work execution shall also be carried out at each stage of work as per standard formats of "Letter- CE (Proj)- Guidelines - OPGW
Execution.pdf " (letter CE(P)/EE(TR-II)/T-1/4281, Dtd: 25.11.2014)
(2) Also, regarding guideline for executing work of OPGW laying on various 400kV, 220kV and 132kV transmission line, a further addendum to letter
"CE (Proj)- Guidelines - OPGW Execution.pdf" has been issued vide letter CE (Project)/EE (Telecom)/OPGW/1294, Dtd: 13.08.2020.
3) A joint verification with field officer for work executed/done shall be invariably completed as per standard revised format-A.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4. MAAT LA Networth Form.pdf
5.POA Of JV Agreement-Format.pdf
6.EMD BG Format.pdf
7.SD cum PBG Format.pdf
8.Form of LD undertaking 1A.pdf
9.Form of LD undertaking 1B.pdf
10.Revised Annexure-C -Joint Deed of Undertaking.pdf
11.Annecure-B -Joint venture agreement.pdf
12.ON - Ammendment for ROW clause Tender Copy.pdf
13.ONLINE SCHEDULE TECH - E-466.pdf
14.Online Schedule-QR-E-466.pdf
15.Public Procurement Circular of GOI.pdf
16.Letter for CBuD.pdf
17.220 kv 1C 1200 sq. mm copper XLPE cable R2 June 2023 OS 3.3.pdf
18.220KV POWER CABLE TRENCH -220KV KANBHA-DEHGAM LINEl.pdf
19.400 220 132 kV LA R6 June 22.pdf
20.AL59 PANTHER MOOSE_R5.pdf
21.Amendment- Structure weight.pdf
22.Ammendment for TTR validity 26.02.2026.pdf
23.G.I. EARTHING STRIPS.PDF
24.HW ACCS AL59 CONDUCTOR 220 kV line PRINT COPY R2 JULY 2022.pdf
25.OPGW (48F) specs final-R2-11.09.2023 final.pdf
26.R1 - STEEL DRUM.pdf
27.R5 May 24- Silicon Rubber - Print Copy.pdf
28.Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
29.TOWER MATERIAL-220KV LINE-ZEBRA.PDF
30.TS SS STR R12 11.03.2024.pdf
31.BOQ of FOAC -E-466.pdf
32.BOQ-E-466-220 kV LILO Kanbha from Ranasan Ksad line 16.03.2026.pdf
1.Part-1 Tender Speci-220KV Rns-Ksad line UG E-466.pdf
2.Part-1 Ammend-1 Tender Speci-220KV Rns-Ksad line UG E-466.pdf
3.Tender Notice-220KV Rns-Ksad line UG E-466.pdf
33.File and Drawing List-E-466.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].