Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹76,702.35Admitted-Fee/PreQual/Technical/Finance | -1.69% | ₹76,702.35 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹77,154.87+₹452.52 (0.59%)Admitted-Fee/PreQual/Technical/Finance | -1.11% | ₹77,154.87+₹452.52 (0.59%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹77,240.69+₹538.34 (0.70%)Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹77,240.69+₹538.34 (0.70%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Treasury challan uploaded for SNO.2 instead of Sno 1 Accordingly your bid is assessed as Non-Responsive |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
3 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Tangmarg
Executive Engineer RnB Division Tangmarg
Maintenance /Repair of various Roads/Bridges/culverts in the Jurisdiction of Sub-Division Tangmarg (Stage contract -) Part 2nd for the year 2026-27.
2026_PWDJK_322367_1
Fresh NIT No. 63/RnB/Tangmarg of 2026-27
Open Tender
Civil Works
Percentage
Tangmarg
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Tangmarg
₹6,000
5 Sept 2026
25 Aug 2026
5 Sept 2026
26 Aug 2026
3 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil | 1 | Cum | 256.85 | ₹256.85 |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1 | Sqm | 12.49 | ₹12.49 |
| 3 | Engagement of JCB/Hydraulic Excavator for various purposes on site as found necessary incl all job complete | 1 | Hours | 1,400 | ₹1,400 |
| 4 | Supplying stacking, and laying of Quarry muck/RBM/Stone soling/ to specified lines, grades and cross sections incl watering, levelling to camber and consolidation by PRR 8-10 Tonne Capacity of Road Roller incl carriages of materials from source to site of work, complete job for road work and backfilling where ever required | 1 | cum | 1,200 | ₹1,200 |
| 5 | Supplying, Stacking at site, spreading of Khak Bajri on shoulders/berm of road/back filling, including rolling and Watering, and dressing to camber, in line with the road formation, incl cost and carriage of materials, complete job | 1 | cum | 850 | ₹850 |
| 6 | P/L of Granular sub base course (GSB) with nallah agg. size 90 mm incl. consolidation with 80-100 KN road Roller to the required gradient camber and density incl. leads, lifts carriages complete job. | 1 | Cum | 1,200 | ₹1,200 |
| 7 | Supplying, stacking , laying , spreading and compacting of Graded crushed stone agg. Of (63mm to 45mm size) WBM in uniform thickness including rolling with PRR 8-10 Tone capacity in stages to proper grade and camber applying and brooming requisite type of stone screening 13-2mm size and binding material (moorum) to fill up the interstics of coarse agg. watering compacting to required density (finished work shall be paid) with all leads, lifts and carriages as involved upto site of work complete job. | 1 | Cum | 2,400 | ₹2,400 |
| 8 | Finishing with Deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers’ specifications: Painting wood work with deluxe multi surface paint of required shade. Two or more coats applied @ 0.90litre/10sqm over anunder coat of primer applied @ 0.75litre/10sqm of approved brand and
manufacture | 1 | SQM | 147.05 | ₹147.05 |
| 9 | Painting steel work with deluxe multi surface paint of
required shade to give an even shade.Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @
0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of
approved brand and manufacture | 1 | SQM | 142.05 | ₹142.05 |
| 10 | Applying priming coat With ready mixed pink or grey primer of approved brand
and manufacture on wood work (hard and soft wood) | 1 | Sqm | 64.6 | ₹64.6 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1080147.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .