Tender Value
₹41.9 L
EMD Value
₹41,914
Closing Date
5 Oct 2026, 3:15 pm
SE PRED PR KADAPA
Kadapa
Package No.I Extension of Shopping Complex for Block VII & VIII at ZPP Kadapa of YSR Kadapa District and Extension of Shopping Complex for Block IX & X at ZPP, Kadapa of YSR Kadapa District, Est. Cost of Rs.50.00 Lakhs
990041
NIT No.16/ATO/Building Work/15th Finance Commission Grant/2026-27, Dt.01.09.2026 of the SE, PR, Kadapa (1st Call)
OPEN - NCB
Buildings
YSR
8 documents required · 6 mandatory · 2 optional
₹1,484
₹41,914
19 Sept 2026
19 Sept 2026
19 Sept 2026
Work Name : 1.Extension of Shopping Complex for Block VII & VIII at ZPP Kadapa of YSR Kadapa District, Est. Cost Rs.25.00 Lakhs Civil Work RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Columns. FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shutteringfor Columns. SECOND FLOOR.
Brick masonry 230 mm thick with CM (1:6) using Fly ash bricks of size 23x10x6 cm from approved source having crushing strength not less than 50kg/sqcm including cost and conveyance of all materials including all operational, incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary, lift charges, curing etc., complete for finished item of work. FIRST FLOOR
Brick masonry 230 mm thick with CM (1:6) using Fly ash bricks of size 23x10x6 cm from approved source having crushing strength not less than 50kg/sqcm including cost and conveyance of all materials including all operational, incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary, lift charges, curing etc., complete for finished item of work. SECOND FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Lintels. FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Lintels. SECOND FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Sunshades of 7.50cms thick at fixed end and 5.00cms thick at free end. FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Sunshades of 7.50cms thick at fixed end and 5.00cms thick at free end. SECOND FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Beams FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Beams FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Roof Slab of 125mm thick. FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Roof Slab of 125mm thick. SECOND FLOOR
Ornamental Plastering to ceiling 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work. FIRST FLOOR
Ornamental Plastering to ceiling 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work. SECOND FLOOR
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) FIRST FLOOR
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) SECOND FLOOR
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) FIRST FLOOR
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) SECOND FLOOR
Providing High Yield Strength Deformed (HYSD/Thermo Mechanically Treated (TMT)/Mild Steel (MS) steel bars (Fe 500 graded as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors (APSS No. 126)
Supplying and fixing of grills for windows including cost and conveyances and labour charges etc. complete including overhead charges and contractor profit etc complete.
Painting to new Iron work ,Painting to Iron doors and windows with enamil paint two coats over red oxide primary coat including cost and conveyances and labour charges etc. complete
Painting to new walls with 1 coat water based cement primer of interior grade I and 2 coats of Acrylic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls. FIRST FLOOR
Painting to new walls with 1 coat water based cement primer of interior grade I and 2 coats of Acrylic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls. SECOND FLOOR
Painting to new walls with 1 coat water based cement primer of exterior grade I and 2 coats of Acrylic Emulsion Paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls. FIRST FLOOR
Painting to new walls with 1 coat water based cement primer of exterior grade I and 2 coats of Acrylic Emulsion Paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls. SECOND FLOOR
Providing with Flooring with high polished Granite Varity 16 to 18mm thick for risers / treads of steps, set over base coat of CM (1:8) 20 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. FIRST FLOOR
Providing with Flooring with high polished Granite Varity 16 to 18mm thick for risers / treads of steps, set over base coat of CM (1:8) 20 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. SECOND FLOOR
Work Name : 2.Extension of Shopping Complex for Block IX & X at ZPP Kadapa of YSR Kadapa District, Est. Cost Rs.25.00 Lakhs Civil Work RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Columns. FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shutteringfor Columns. SECOND FLOOR.
Brick masonry 230 mm thick with CM (1:6) using Fly ash bricks of size 23x10x6 cm from approved source having crushing strength not less than 50kg/sqcm including cost and conveyance of all materials including all operational, incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary, lift charges, curing etc., complete for finished item of work. FIRST FLOOR
Brick masonry 230 mm thick with CM (1:6) using Fly ash bricks of size 23x10x6 cm from approved source having crushing strength not less than 50kg/sqcm including cost and conveyance of all materials including all operational, incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary, lift charges, curing etc., complete for finished item of work. SECOND FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Lintels. FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Beams. FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Beams. SECOND FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Roof Slab of 125mm thick. FIRST FLOOR
RCC M-25 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering for Roof Slab of 125mm thick. SECOND FLOOR
Ornamental Plastering to ceiling 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work. FIRST FLOOR
Ornamental Plastering to ceiling 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work. SECOND FLOOR
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) FIRST FLOOR
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) SECOND FLOOR
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) FIRST FLOOR
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.including cost and conveyance of all materials like cement, sand, water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) SECOND FLOOR
Providing High Yield Strength Deformed (HYSD/Thermo Mechanically Treated (TMT)/Mild Steel (MS) steel bars (Fe 500 graded as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors (APSS No. 126)
Painting to new Iron work ,Painting to Iron doors and windows with enamil paint two coats over red oxide primary coat including cost and conveyances and labour charges etc. complete. SHUTTERS
Painting to new walls with 1 coat water based cement primer of interior grade I and 2 coats of Acrylic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls. FIRST FLOOR
Painting to new walls with 1 coat water based cement primer of interior grade I and 2 coats of Acrylic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls. SECOND FLOOR
Painting to new walls with 1 coat water based cement primer of exterior grade I and 2 coats of Acrylic Emulsion Paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls. FIRST FLOOR
Painting to new walls with 1 coat water based cement primer of exterior grade I and 2 coats of Acrylic Emulsion Paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls. SECOND FLOOR
Providing with Flooring with high polished Granite Varity 16 to 18mm thick for risers / treads of steps, set over base coat of CM (1:8) 20 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. FIRST FLOOR
Providing with Flooring with high polished Granite Varity 16 to 18mm thick for risers / treads of steps, set over base coat of CM (1:8) 20 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. SECOND FLOOR
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted onspecially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc completefor finished item of work as per specialspn: 1108
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ16.xlsx
TENDER_DOCUMENT • 0.01 MB
NIT No 16 Schedule.xlsx
TENDER_DOCUMENT • 0.07 MB
SBD16.doc
TENDER_DOCUMENT • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .