Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.0 LAccepted-Finance | ₹79.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹83.4 L+₹4.5 L (5.65%)Accepted-Finance | ₹83.4 L+₹4.5 L (5.65%) | L2 | Accepted-Finance L2 |
| 3 | L3₹85.0 L+₹6.0 L (7.64%)Accepted-Finance | ₹85.0 L+₹6.0 L (7.64%) | L3 | Accepted-Finance L3 |
| 4 | L4₹86.0 L+₹7.0 L (8.85%)Accepted-Finance | ₹86.0 L+₹7.0 L (8.85%) | L4 | Accepted-Finance L4 |
| 5 | L5₹99.7 L+₹20.8 L (26.3%)Accepted-Finance | ₹99.7 L+₹20.8 L (26.3%) | L5 | Accepted-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
15 Jan 2021, 2:00 pmClosed
Executive Engineer Mech. Div Kgl
Office of the Executive Engineer Mech. Div Kgl
Fabrication of sheds for machinery and vehicles at Divisional workshop Mechanical Engineering Department Kargil.
2021_PWD_1870_1
MDK/e-NIT/ 46 of 2020-21
Open Tender
Metal Fabrication
Turn-key
30 days
Mechanical Division Kargil
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,500
Executive Engineer Mech. Div Kgl
₹1 L
Office of the Executive Engineer Mech. Div Kgl
8 Feb 2021
7 Jan 2021
15 Jan 2021
8 Jan 2021
15 Jan 2021
8 Jan 2021
12 Jan 2021
Amount
Earth work in excavation of pitsby manual means for grouting structural steel columns of length 11’.6”, (widthnot exceeding1.5m) on plan, lift upto 1.5mtr & lead upto 30 mtr from cutting edge. All Kind of soil Pit for Column = 3 x 3 x 4 x 144 No.= 5184 Cft
Providing and grouting in position of 18’ rft 125 x130x6 mm columns in plain cement concrete M15 grade mix including minor form works 1. 3’x3’x2’ x 144 = 2592 cft 2. 2’x2’x2’ x 144 = 1152 cft Total = 3721 cft or 105.81 CuM
Earth work in trench excavation for foundation for R/ wall by manual means width not exceeding 1.5m, lift up to 0.5m and lead up to 5 m from the trench edge, all Kind of soil 4’.6” x 1’.6” x 250’ = 1687.5 cft
Construction of R wall (retaining wall) (with base 3’.6’’, top 1’.6”) in quarry stone (well-dressed) with bonding stone in 1:6 mix mortar, including weep holes at different places 3’.6”x 1’.6”x 16’ x 250’ = 10000 cft or 294.49 CuM Carriage of quarry stone up to a lead of 8 km by mechanical transport
Carriage of quarry stone up to a lead of 8 km by mechanical transport
Carriage of sand aggregate by mechanical transport up to a lead of 8 km
Providing, fabrication and fixing of SC 100 by welding, conforming IS 80 with mass density of kg/m. 1. 18 x 144 = 2592 rft or 790 x20 =15804 kg 2. fixing base and top plates to the hollow channel column by way of sizing/cutting/welding of 6mm thick MS sheet 1’x1’x 6mm x 144 x 2 = 1261.58 kg
Providing/fitting of beams) in I-section structural steel conforming to IS-80 standards ISMB 100 with mass density 8.9 kg/m to item No 07 the job includes sizing/cutting/welding and hoisting of the beams 33’ x 34 Nos = 1122 rft = 304.88 RM
Providing/fabricating and hoisting of steel truss by welding (welding types as required, fillet, but/ joint with standard thickness/pitch) conforming to IS 80 standards
1. Tie beam ISMB 100 mass density 8.9 kg/RM 33’x34 =321.34 RM = 3044.45 kg 2. Rafter ISA-70-50x6mmx (25+9=34) mass density 5.6 kg/m 34’ = 58.04x 34 = 1973.65kg 3. Posts 8’, 4’, 3’, ISMB 100 mass density 8.9 kg/m 15RFT = 40.70 x 34 = 1383.84 kg 4. Struts ISA 5050,6mm x 32 rft = 43.89x 34 = 1492.22 kg
Providing 7 fixing of purlins ISA 45 x45x6 4.0 kg/RM 250’ x 4 =5000 rft =1524.39 = 6097.56 kg
Providing corrugated C.G.I. sheet roofing fixed with polymer coated J or L hooks, bolts & nuts 8mm diameter with bitumen & G.I. limpet washers or with white lead and incl. a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (upto a pitch of 60 degrees), excl. the cost of purlins, rafters & trusses 0.63mm thick with zinc coating not less than 275gm/sqm. 33 x 500= 16500 Sft or 1533.68 sqm
Providing corrugated C.G.I. sheet roofing fixed with polymer coated J or L hooks, bolts & nuts 8mm diameter with bitumen & G.I. limpet washers or with white lead and incl. a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (upto a pitch of 60 degrees), excl. the cost of purlins, rafters & trusses 0.63mm thick with zinc coating not less than 275gm/sqm. 40 x 70= 2800 Sft or 260 sqm
Dismantling of damaged CGI sheet of machine shop 40 x70 = 2800 sft or 260.12 sqm
Fixing of extracted/dismantled CGI sheet from S. No 10 to the sides of the erected sheds as per the terms of S. No 09
Horizontal belting of the columns by way of providing, sizing, cutting and welding of 50 x50 x5 mm mass density 3.8 kg/m eq. Iron 1. 2 x 500= 1000 = 304.78 x 3.8 = 1158.53 kg 2. 1 x 34’ x 35 Nos = 362.80 x 3.8 = 1378.65 kg
M/s sajjad Hussain
M/S IRSHAD HUSSAIN
M/S Afzal Engineering works
M/S ASSADULLAH MUNSHI
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .