Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29.7 LAccepted-AOC | 1 | Accepted-AOC Agreement executed by him | |
| 2 | 2₹34.0 L+₹4.3 L (14.3%)Rejected-AOC | 2 | Rejected-AOC second lowest |
Tender Value
₹28.9 L
EMD Value
₹50,000
Closing Date
5 Aug 2019, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
SDP-Pamba-M and M Festival 1195 ME-Overhauling and operation of Sewage Treatment Plant at Cheriyanavattom, Pamba by Engaging Labour, Supply of Spares
2019_TDB_288753_1
SDP/EE/ET-14/2019-20
Open Tender
Civil Works - Others
Item Rate
90 days
Pamba
Refer NIT
6 documents required · 6 mandatory
₹2,800
online
₹50,000
19 Apr 2021
27 Jul 2019
7 Aug 2019
27 Jul 2019
5 Aug 2019
27 Jul 2019
Amount
APPENDIX A - Overhauling of STP Supplying and providing of the following items : B-56 type V belt.
Ball bearings :SKF No-22308-E
Ball bearings :SFK NO- 6307
Rubber gasket (6mm thick)
Love joy and spider bush set machined and matched for coupling 5 HP motor and pump.
Spider bush for 5HP pump set.
Love joy coupling for 20 HP pump set.
Rubber flap SPGL for 20HP pump set
Supplying and providing of the following electrical spares. Mk-1 DOL starter 230/ 440 V.
Mk-1 contractor 230/440 V.
MK-1 Spark Kit.
MK-1 Over load relay.
HRC fuse 80 /1100 A.
MK-1 coil 230/440V.
Terminal changing of 5HP electric motor Including labour charges.
Dismantling the defective motor part by part, removing burnt winding, recondition the care and rewinded by using best quality winding materials and assembling the motor in its orginal position.: 2HP Motor
Do 3HP Motor
Engaging Scavenger for complete de-sludging of the four chambers of Parallel Plate Separator,2 nos of chambers of grit chamber, 2 nos of equalization Tank, chlorine chamber, sump of sludge drying bed.
Engaging Electrician for the complete overhauling of pump sets,electric motor and panel boards at Sewage pumping Stations etc;
Engaging plumber for the complete overhauling of pump sets,electric motor and panel boards at Sewage pumping Stations etc;
Hydraulic oil 68 for filter press.
APPENDIX B - Wages of Employees Plumber grade -I. (1 no./Shift for 3 shifts per days.1x3x67=201 days)
Electrician Grade -I (1 no /shift for the 3 shifts per day. for 67 days)
Scientist (1 no /shift for 2 shift per day.)2x67= 134 nos)
Skilled Mazdoor (1 no.per shift for 3 shift s per day. 1x3x67=201 days)
Pump operators (7 nos . Per shift for 3 shift s per day.7x3x67=1407 nos)
Scavangers (7 nos .per shift for 3 shifts per day.7x3x67=1407 nos)
Man mazdoor (1 no .per shift for 3 shifts per day.1x3x67=201 days).)
APPENDIX C - Installation and operation of Departmental pump set Conveyance charges of departmentally supplied diesel.
Yellow Mask (disposable).
Matty mark (do)
Rubber gloves 14 '' (disposable)
Rubber gloves 18'' (do)
Industrial leather gloves (14'')
Industrial leather gloves (18'')
CINZAC ENGINEERS (INDIA) PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .