Loading…
Loading…
Tender ID
Tender Value
₹32.3 L
EMD Value
₹64,522
Closing Date
27 Mar 2026, 4:30 pmClosed
Executive Engineer, South Zone, Vadodara Municipal Corporation
Construction of compound wall at Kalyanbaug Garba Ground, Ward 17,. South Zone
281377
PRO No.1231/25-26, South Zone
Open
Miscellaneous Works
Works
Vadodara
5 documents required · 5 mandatory
₹4,000
Municipal commissioner ,Vadodara municipal corporation
₹64,522
27 Feb 2026
27 Feb 2026
27 Feb 2026
27 Mar 2026
27 Feb 2026
NAME OF WORK: CONSTRUCTION OF COMPOUND WALL AT KALYANBAGH GARABA
GROUND, VADODARA
Item Quantity Description Unit Estimated Rate Rate In Words Total Amount as per
Item Quantity Description Unit Estimated Rate Rate In Words Total Amount as per
No. estimated rates
1 670.00 Excavation for foundation upto 1.5 m depth Cum 151.89 Rupees One
including sorting out and stacking of Hundred Fifty
useful materials and disposing off the One and paise
excavated stuff upto 50 Meter lead.(B) Eighty one
Dense or Hard soil only
R & B SOR 24-25 I.no : 04001B
2 83.00 Providing and laying cement concrete 1:4:8 Cum 2720.01 Rupees Two
(1- Cement : 4- coarse sand : 8- hand broken thousand
stone aggregates 40 mm nominal size) and seven
curing complete excluding cost of formwork hundred
in (A) Foundation and Plinth twenty and
R & B SOR 24-25 I.no :05004A
3 184.00 Providing and laying controlled cement Cum 4205.51 Rupees Four
concrete M.250 and curing complete thousand two
excluding the cost of formwork and hundred five
reinforcement for reinforced concrete work and paise
in (A) Foundations, footings, Base of Fofty one only
columns and Mass concrete.
R & B SOR 24-25 I.NO.05025AA
4 410.00 Filling available excavated earth Cum 132.33 Rupees
(excluding rock) in trenches. plinth, OneHundred
sides of foundations etc. in layers not Thirtytwo and
exceeding 20 cm. in depth consolidating Paise Thirty
each disposited layer by ramming and three Only
R & B SOR 24-25 Item code.4006
5 8.00 Providing and laying controlled cement Cum 4582.32 Rupees Four
concrete M.250 and curing complete thousan Five
excluding the cost of formwork and hundred
reinforcement for reinforced concrete Eightytwo and
work in (D) Columns, Pillars posts and Paise Thirty-two
struts, upto floor two level. Only
R & B SOR 24-25 Item code.05025DA
6 8394.00 Providing TMT Bar FE 415 KG 67.65 Rupees Four
reinforcement for R.C.C. work including Thousand One
bending, binding and placing in position Hundred
complete upto floor two level Twenty-One
and Paise Fifty-
R & B SOR 24-25 Item code. 05014BA
7 14.32 Cum 3953.57 Rupees Three
Providing and laying cement concrete 1:3:6
(1- Cement : 3- Coarse sand : 6- crushed
stone aggregates 20 mm nominal size) and Paise Fifty
curing complete including cost of formwork seven Only
in (A) Wall Caps / Coping
R & B SOR 24-25 Item code. 05005A
8 40.00 Brick work using common burnt clay building Cum 4111.95 Rupees Four
bricks having crushing strength not less than Thousand one
35 kg./Sq.Cm. in foundation and plinth in hundred eleven
Cement Mortar 1:5. (1- Cement : 5 -fine and Paise
sand) (B) Conventional Ninety five Only
R & B SOR 24-25 Item code. 06001BA
9 440.00 Sqmt 604.00 Rupees Six
PROVIDING AND FIXING 8 GAUGE THICK
CHAIN LINK WITH THE GAPPING OF 2"X2"
FIXING WITH NECESSARY FIXURES IN LINE
AND LEVEL INCLUDING THE COST OF
TRASPORTATION AND OTHER TAXES AS PER
INSTURCTION OF ENGINEER INCHARGE
(APPROVED R.A.)
10 4710.00 Providing and fixing M.S. grills of required KG 104.14 Rupees One
pattern to wooden frames of windows etc. Hundred Four
with M.S. flats at required spacings and and Paise
frame alround, square or round bars with Fourteen Only
round headed bolts and nuts or by screws
R & B SOR 24-25 Item code.10025AA
11 640.00 20mm thick sand faced cement plaster on Sqmt 334.18 Rupees Three
walls upto height 10 metres above ground hundred
level consisting of 12mm thick backing coat Thirtyfour and
of C.M. 1:3 (1-cement : 3-sand) and 8mm Eighteen Paise
thick finishing coat of C.M. 1:1 (1-cement : 1- Only
sand) etc. complete.
R & B SOR 24-25 Item code.17009
12 640.00 Sqmt 116.24 One hundred
Finishing wall with weather proof exterior and twenty-four
emulsion paint on wall surface (two coats) to paise.
give an required shape even shade after
thoroughly brushing the surface to remove
all dirt, and remains of loose powdered
materials.etc complete
R & B SOR 24-25 Item code.19031
13 500.00 Painting two coats (excluding priming coat) Sqmt 89.11 Eighty-nine
on new steel and other metal surface with rupees and
enamel paint, brushing, interior to give an eleven paise.
even shade including cleaning the surface an
even shade including cleanicn the surface of
all dirt, dust and other foreign matter.
R & B SOR 24-25 Item code.19002
14 1200.00 Structural steel work ( Confirming to IS 4923- KG 129.85 One hundred
1997) riveted, bolted or welded in builtup twenty-nine
for all type sections, in framed work, rupees and
including cutting, hoisting, fixing in position eighty-five
and applying a priming coat of approved paise.
steel primer all complete as per the
structural designs and directions of Engineer
in charge.Column ( 122 x 61 x 3.6mm )
R & B SOR 24-25 Item code.20054
VADODARA MUNICIPAL CORPORATION
NAME OF WORK: CONSTRUCTION OF EV BUS STATION, VADODARA
Ite Quantit Description Unit Estimated Rate In Total Amount as
Ite Quantit Description Unit Estimated Rate In Total Amount as
VADODARA MUNICIPAL CORPORATION Words per
NAME OF WORK: CONSTRUCTION OF COMPOUND WALL AT KALYANBAGH GARABA GROUND, VADODARA
Ite Quantit Description Unit Estimated Rate In Words Total Amount as
Ite Quantit Description Unit Estimated Rate In Words Total Amount as
m y Rate TOTAL per
Amount in Word|:
Rupees Six Crore Fifty-Two Lakh Fifty-Eight Thousand Eight Hundred Sixty Only
I/We am/are willing to carry out the work at… % above/below percent(Should be written in figures and
words) of the estimated rate
mentioned above. Amount of my /our tender works out as under.
IF TENDER IS BELOW IF TENDER IS ABOVE
1) Put on 3226095.00 1) Put on Tender
2] Deduct Rs. 2] Add % Rs.
3] Net Rs. 3] Net Amount of Rs.
Amount of tender
4] Amount in 4] Amount in
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
Note-2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature.
Note-3 Rates quoted include clearance of site (prior commencement of work and at its close)in all respects and hold good for work under all conditions, site,
Note-4 To be continued on additional sheets, if found necessary.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
PRO 1231.pdf
Kalyanbagh garba ground.pdf
Pricebid kalyanbag.pdf
compound wall DRG.pdf
kalyanbagh compoundwall - SBD.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .