Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -39.11% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 L+₹19,436.99 (6.50%)Admitted-Finance | -35.15% | ₹3.2 L+₹19,436.99 (6.50%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 L+₹22,627.41 (7.57%)Admitted-Finance | -34.50% | ₹3.2 L+₹22,627.41 (7.57%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 L+₹24,836.16 (8.31%)Admitted-Finance | -34.05% | ₹3.2 L+₹24,836.16 (8.31%) | L4 | Admitted-Finance |
| 5 | L5₹3.3 L+₹29,449.99 (9.85%)Admitted-Finance | -33.11% | ₹3.3 L+₹29,449.99 (9.85%) | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
25 Aug 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJORI
OFFICE OF EXECUTIVE ENGINEER REW RAJURI
PLS REFER NIT
2026_RDPR_320964_10
e-NIT No. 48 REW Rajouri of 2026 Dated 13-08-2026
Open Tender
Civil Works
Percentage
90 days
RAJORI
PLS REFER BOQ
2 documents required · 2 mandatory
₹500
Revenue Head
₹10,000
Yes
18 Sept 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
25 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying stone solling by hand packed upto complete job | 1 | cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone | - | cum | 1 | - |
| 4 | Providing and Laying Brick work with FPS bricks of class designation 75 in 1:4 mix mortor | 1 | cum | 1 | ₹1 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 1 | cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | - | - |
| 7 | 12mm thick Cement Plaster in 1:4 mix | 1 | sqm | 1 | ₹1 |
| 8 | 6mm Cement plaster of mix: 1 : 3 ( 1 cement : 3 fine sand) | 1 | sqm | - | - |
| 9 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete of 1 mm thick | - | sqm | 1 | - |
| 10 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface | - | sqm | 1 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1073413.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .