| 1 | L1₹8.4 LAdmitted-Fee/PreQual/Technical/Finance 31 A K ROAD AGARTALA | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | ₹8.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | STANDARD ELECTRONICS L1 |
|---|---|---|---|---|
| 1.00Supply, installation, testing and commissioning of air cooled, Top Discharge, 100% inverter driven cooling type VRF system unit with air cooled condenser, inverter compressor, electronic expansion valve, copper inner grooved coil, aluminium hydrophilic blue fins, inbuilt temperature sensor, interconnected piping and wiring, auto test run operation and auto‑addressing function along with inbuilt microprocessor panel and first charge of Refrigerant R410A. The unit must be compatible with the existing copper piping network and the piping shall remain the same. | ||||
| 1.01 | Capacity: 18 HP | 1 | Nos | 4,50,000 ₹4,50,000 Lowest |
| 2.00 | Supply, installation, testing and commissioning 4‑Way cassette type indoor unit along with inbuilt drain pump, cooling coil, filter, indoor PCB and cordless remote control.
Capacity: 2 TR.
The unit must be same as the existing one and compatible with the existing copper piping network as the piping shall remain the same. | 7 | Nos | 50,000 ₹3,50,000 Lowest |
| 3.00 | Dismantling & disposal of the existing system. | 1 | Lot | 1 ₹1 Lowest |
| 4.00 | Unloading, Lifting, Shifting & material handling. | 1 | Lot | 25,000 ₹25,000 Lowest |
| 5.00 | MS Structural Work for IDU and ODU Installation. | 1 | Lot | 1 ₹1 Lowest |
| 6.00 | Interconnection of the existing copper pipe & drain pipe with the new VRF indoor & Outdoor Unit with the required connection modification. | 8 | Set | 1 ₹8 Lowest |
| 7.00 | Termination & connection of the existing power & control cable to the new VRF system with the required modification. | 8 | Set | 1 ₹8 Lowest |
| 8.00 | Flushing, Nitrogen Charging, Refrigerant top up & Commissioning of the new VRF System. | 1 | Set | 15,000 ₹15,000 Lowest |
Tender Value
₹10.1 L
EMD Value
₹20,110
Closing Date
30 May 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Mechanical Division
Replacement of existing VRF System by Supply Installation Testing and Commissioning of air cooled Top Discharge 100 Percent Inverter driven Cooling type VRF system unit at Sachin Debbarman Auditorium at Belonia South Tripura
2026_CEPWD_73067_1
25_EE_DNIT_MECHDIVN_AGT_2627
Open Tender
Electrical Works
Works
60 days
Agartala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹20,110
17 Jun 2026
19 May 2026
30 May 2026
19 May 2026
30 May 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply, installation, testing and commissioning of air cooled, Top Discharge, 100% inverter driven cooling type VRF system unit with air cooled condenser, inverter compressor, electronic expansion valve, copper inner grooved coil, aluminium hydrophilic blue fins, inbuilt temperature sensor, interconnected piping and wiring, auto test run operation and auto‑addressing function along with inbuilt microprocessor panel and first charge of Refrigerant R410A. The unit must be compatible with the existing copper piping network and the piping shall remain the same. | |||||
| 1.01 | Capacity: 18 HP | 1 | Nos | - | - |
| 2 | Supply, installation, testing and commissioning 4‑Way cassette type indoor unit along with inbuilt drain pump, cooling coil, filter, indoor PCB and cordless remote control.
Capacity: 2 TR.
The unit must be same as the existing one and compatible with the existing copper piping network as the piping shall remain the same. | 7 | Nos | - | - |
| 3 | Dismantling & disposal of the existing system. | 1 | Lot | - | - |
| 4 | Unloading, Lifting, Shifting & material handling. | 1 | Lot | - | - |
| 5 | MS Structural Work for IDU and ODU Installation. | 1 | Lot | - | - |
| 6 | Interconnection of the existing copper pipe & drain pipe with the new VRF indoor & Outdoor Unit with the required connection modification. | 8 | Set | - | - |
| 7 | Termination & connection of the existing power & control cable to the new VRF system with the required modification. | 8 | Set | - | - |
| 8 | Flushing, Nitrogen Charging, Refrigerant top up & Commissioning of the new VRF System. | 1 | Set | - | - |
stage.html
html • 0.02 MB
finance_74359.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
DNIT.pdf
Tender Documents • 3.31 MB
BOQ_74359.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .