| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.9 LAccepted-Finance | ₹95.9 L | L1 | Accepted-Finance Due to L1 |
| 2 | L2₹96.0 L+₹10,149.39 (0.11%)Rejected-Finance | ₹96.0 L+₹10,149.39 (0.11%) | L2 | Rejected-Finance Due to L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Nonrensponsive |
| Sl No | Description | Qty | Unit | ER KARI DOYE L2 | Er. Amos Kadu L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 489.03 | Cum | 221.66 ₹1,08,398.39 | 220.66 ₹1,07,909.36 Lowest |
| 2.00 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering. | 49.5 | Cum | 4,756.52 ₹2,35,447.74 | 4,727.52 ₹2,34,012.24 Lowest |
| 3.00 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass
concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 96.3 | Cum | 7,800.29 ₹7,51,167.93 | 7,770.29 ₹7,48,278.93 Lowest |
| 4.00 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 17.67 | Cum | 9,058.87 ₹1,60,070.23 | 9,050.87 ₹1,59,928.87 Lowest |
| 5.00 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level
including finishing and plastering the exposed surface with cement mortar 1 : 3 (1
cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even
surface but excluding cost of centering, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 15.84 | Cum | 8,951.52 ₹1,41,792.08 Lowest | 8,951.52 ₹1,41,792.08 Lowest |
| 6.00 | Reinforced cement concrete in chajjas exceeding 15mm in thickness upto floor two
level including centring and shuttering complete but excluding the cost of
reinforcement with M20 ( 1 cement: 1.5 coarse sand : 3 stone aggregate 20 mm
nominal size). | 6.75 | Cum | 12,077.56 ₹81,523.53 Lowest | 12,077.56 ₹81,523.53 Lowest |
| 7.00Centring and shuttering including strutting proping etc. and removal of form work for: | |||||
| 8.00 | a) Foundation, footings, bases of columns etc. and mass concrete. | 127.61 | Sqm | 348.33 ₹44,450.39 Lowest | 348.33 ₹44,450.39 Lowest |
| 9.00 | e) Column, pillars, posts and struts etc. | 35.34 | Sqm | 584.91 ₹20,670.72 Lowest | 584.91 ₹20,670.72 Lowest |
| 10.00 | d) Lintels, beams, girders, bressumers and cantilevers etc. | 26.4 | Sqm | 458.87 ₹12,114.17 Lowest | 458.87 ₹12,114.17 Lowest |
Tender Value
Refer Docs
EMD Value
₹96,500
Closing Date
29 Jun 2026, 4:00 pmClosed
Joint Director Rural Engineer
O/o BDO Nari, Lower Siang District, AP.
Construction of Indoor Sports Complex/ Multipurpose Hall at Potte village, Lower Siang District, AP.
2026_DRDAP_3468_1
RBG_INDOOR_NARI/01
Open Tender
Civil Works
Item Rate
Potte Village
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
BDO, CD Block Ramle-Banggo, Nari
₹96,500
30 Jun 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
29 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 489.03 | Cum | - | - |
| 2 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering. | 49.5 | Cum | - | - |
| 3 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass
concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 96.3 | Cum | - | - |
| 4 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 17.67 | Cum | - | - |
| 5 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level
including finishing and plastering the exposed surface with cement mortar 1 : 3 (1
cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even
surface but excluding cost of centering, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 15.84 | Cum | - | - |
| 6 | Reinforced cement concrete in chajjas exceeding 15mm in thickness upto floor two
level including centring and shuttering complete but excluding the cost of
reinforcement with M20 ( 1 cement: 1.5 coarse sand : 3 stone aggregate 20 mm
nominal size). | 6.75 | Cum | - | - |
| 7 | Centring and shuttering including strutting proping etc. and removal of form work
for: | - | - | - | - |
| 8 | a) Foundation, footings, bases of columns etc. and mass concrete. | 127.61 | Sqm | - | - |
| 9 | e) Column, pillars, posts and struts etc. | 35.34 | Sqm | - | - |
| 10 | d) Lintels, beams, girders, bressumers and cantilevers etc. | 26.4 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tender_Documents.pdf
Tender Documents • 37.56 MB
BOQ_3672.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .