Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 CrAdmitted-Finance RAIGAD MAHARASHTRA 410218 INDIA UDYAM MH 27 0019079 27AAZCS6873M1Z1 R 22AAZCS6873M1ZB S MSME STATUS AS VERIFIED | RAIGAD | MAHARASHTRA | 410218 | ₹12.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹13.2 CrAdmitted-Finance | ₹13.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹13.2 CrAdmitted-Finance | ₹13.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹13.3 CrAdmitted-Finance | ₹13.3 Cr | L4 | Admitted-Finance |
| 5 | L5₹13.6 CrAdmitted-Finance 1ST FLOOR 15 INDIA EXCHANGE PLACE DALHOUSIE KOLKATA WEST BENGAL 700001 UDYAM WB 10 0002572 19AAACO3020H1ZT B R MSME STATUS AS VERIFIED | KOLKATA | WEST BENGAL | 700001 | ₹13.6 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PARVAT ROAD CARRIERS L6 | ODC Logistics Private Limited L5 | SAYAAN VENTURES PRIVATE LIMITED L1 | R.R.C. GLOBAL ROADWAYS PRIVATE LIMITED L7 | CJ Darcl Logistics Limited L9 | PBL TRANSPORT CORPORATION PRIVATE LIMITED L10 | R R ROADWAYS PVT LTD L2 | PROCAM LOGISTICS PRIVATE LIMITED L11 | ALIGN GLOBAL LOGISTICS PRIVATE LIMITED L4 | JSTC LOGISTICS PVT LTD L8 | PRC LOGISTICS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Less than 1000 Km (Group-1) | ||||||||||||||
| 1.01 | >108 MT to 135 MT | 6,74,230 | km x MT | 28,59,740 ₹28.6 L | 27,15,489.32 ₹27.2 L | 25,32,000 ₹25.3 L | 30,08,000 ₹30.1 L | 33,84,000 ₹33.8 L | 37,00,000 ₹37 L | 26,30,567.12 ₹26.3 L | 37,17,446.09 ₹37.2 L | 26,52,000 ₹26.5 L | 32,36,040 ₹32.4 L | 26,44,000 ₹26.4 L |
| 1.02 | >135 MT to 189 MT | 41,48,740 | km x MT | 1,78,73,375 ₹1.8 Cr | 1,69,71,808.25 ₹1.7 Cr | 1,58,25,000 ₹1.6 Cr | 1,88,00,000 ₹1.9 Cr | 2,11,50,000 ₹2.1 Cr | 2,31,25,000 ₹2.3 Cr | 1,64,41,044.5 ₹1.6 Cr | 2,32,34,038.05 ₹2.3 Cr | 1,65,75,000 ₹1.7 Cr | 2,02,25,250 ₹2.0 Cr | 1,65,25,000 ₹1.7 Cr |
| 1.03 | >189 MT to 199 MT | 13,18,530 | km x MT | 57,19,480 ₹57.2 L | 54,30,978.64 ₹54.3 L | 50,64,000 ₹50.6 L | 60,16,000 ₹60.2 L | 67,68,000 ₹67.7 L | 74,00,000 ₹74 L | 52,61,134.24 ₹52.6 L | 74,34,892.18 ₹74.3 L | 53,04,000 ₹53.0 L | 64,72,080 ₹64.7 L | 52,88,000 ₹52.9 L |
| 2.00More than 1000 Km (Group-2) | ||||||||||||||
| 2.01 | >108 MT to 135 MT | 12,45,600 | km x MT | 57,19,480 ₹57.2 L | 54,30,978.64 ₹54.3 L | 50,64,000 ₹50.6 L | 60,16,000 ₹60.2 L | 67,68,000 ₹67.7 L | 74,00,000 ₹74 L | 52,61,134.24 ₹52.6 L | 74,34,892.18 ₹74.3 L | 53,04,000 ₹53.0 L | 64,72,080 ₹64.7 L | 52,88,000 ₹52.9 L |
| 2.02 | >135 MT to 189 MT | 62,27,990 | km x MT | 2,85,97,400 ₹2.9 Cr | 2,71,54,893.2 ₹2.7 Cr | 2,53,20,000 ₹2.5 Cr | 3,00,80,000 ₹3.0 Cr | 3,38,40,000 ₹3.4 Cr | 3,70,00,000 ₹3.7 Cr | 2,63,05,671.2 ₹2.6 Cr | 3,71,74,460.88 ₹3.7 Cr | 2,65,20,000 ₹2.7 Cr | 3,23,60,400 ₹3.2 Cr | 2,64,40,000 ₹2.6 Cr |
| 2.03 | >189 MT to 199 MT | 23,35,500 | km x MT | 1,07,24,025 ₹1.1 Cr | 1,01,83,084.95 ₹1.0 Cr | 94,95,000 ₹95.0 L | 1,12,80,000 ₹1.1 Cr | 1,26,90,000 ₹1.3 Cr | 1,38,75,000 ₹1.4 Cr | 98,64,626.7 ₹98.6 L | 1,39,40,422.83 ₹1.4 Cr | 99,45,000 ₹99.5 L | 1,21,35,150 ₹1.2 Cr | 99,15,000 ₹99.2 L |
| 2.04 | Total Cost for both cateogry | 1 | Nos | 7,14,93,500 ₹7.1 Cr | 6,78,87,233 ₹6.8 Cr | 6,33,00,000 ₹6.3 Cr | 7,52,00,000 ₹7.5 Cr | 8,46,00,000 ₹8.5 Cr | 9,25,00,000 ₹9.3 Cr | 6,57,64,178 ₹6.6 Cr | 9,29,36,152.2 ₹9.3 Cr | 6,63,00,000 ₹6.6 Cr | 8,09,01,000 ₹8.1 Cr | 6,61,00,000 ₹6.6 Cr |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
12 Sept 2025, 11:00 amClosed
SR DGM-LGX
SR DGM-LGX
RATE CONTRACT FOR ALL INDIA ROAD TRANSPORTATION OF CONSIGNMENTS (ABOVE 108 MT UPTO 200 MT) BY HYDRAULIC TRAILERS SPECIAL
2025_BHEL_52188_1
LGX/RC/E-00502
Open Tender
Shipping Services
365 days
BHEL BHOPAL
AS PER NIT
2 documents required · 2 mandatory
₹0
₹5 L
Yes
17 Dec 2025
26 Aug 2025
12 Sept 2025
26 Aug 2025
12 Sept 2025
26 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid