Tender Value
₹55.9 L
EMD Value
₹1.1 L
Closing Date
9 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ADEN LUNI
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less: where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a work contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
Defination of Similar Work :- Construction of buildings/quarters work. Note:- Zone works for repair maintenance of service building/residential quarter will not be considered similar work as "Construction of building/quarters work."
20 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
General Conditions of the Contract (GCC), 2022 is applicable to this contract.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
It shall not be obligatory on the said authority to accept the lowest tender and no tenderer/tenderers shall demand any explanation for the cause of rejection of his/their tender.
If the tenderers deliberately gives/give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer/s expires after the submission of his/their tender or after the acceptance of his tender, the Rly. shall deem such tender as cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled unless the firm retains its character.
Provision of S & T service building for interlocking of 3 Nos. Manned LC No. C-25, 18 & 16 in Luni- Marwar Jn. section in the jurisdiction of ADEN/Luni over Jodhpur Division.
141of2026-27~NWR
141of2026-27
Open
Works - General
8 Months
Jodhpur, Rajasthan
₹0
₹1.1 L
18 Aug 2026
18 Aug 2026
26 Aug 2026
45 items across 1 schedule · ₹79,88,885.78 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | All kinds of soil. | cum | 525 | 260.3 | 1,36,657.5 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | cum | 126 | 196 | 24,696 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | cum | 33 | 700.5 | 23,116.5 |
| 4 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | cum | 39 | 7,178.75 | 2,79,971.25 |
| 5 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | cum | 96 | 6,812 | 6,53,952 |
| 6 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 9 | 9,895.2 | 89,056.8 |
| 7 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources) | cum | 6 | 10,105.1 | 60,630.6 |
| 8 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 54 | 392.15 | 21,176.1 |
| 9 | Suspended floors, roofs, landings, balconies and access platform | Sqm | 180 | 927.25 | 1,66,905 |
| 10 | Lintels, beams, plinth beams, girders, bressummers and cantilevers | Sqm | 126 | 736.4 | 92,786.4 |
| 11 | Thermo-Mechanically Treated bars of grade Fe- 500D or more. | Kg | 525 | 107.85 | 56,621.25 |
| 12 | Thermo-Mechanically Treated bars of grade Fe- 500D or more. | Kg | 2310 | 107.85 | 2,49,133.5 |
| 13 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 10.5 | 9,504.75 | 99,799.88 |
| 14 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 30 | 9,860.4 | 2,95,812 |
| 15 | Honey-comb brick work 10 / 11.4 cm thick with common burnt clay bricks of class designation 7.5 in super structure above plinth level upto floor V level with cement mortar 1:4 (1 cement : 4 coarse sand). | Sqm | 36 | 711.5 | 25,614 |
| 16 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 288 | 7,311.25 | 21,05,640 |
| 17 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 174 | 9,275.45 | 16,13,928.3 |
| 18 | Square or rectangular pillars | cum | 15 | 956 | 14,340 |
| 19 | Masonry work (first sort), in cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 30 | 10,741.6 | 3,22,248 |
| 20 | Square or rectangular pillars | cum | 6 | 1,060.5 | 6,363 |
| 21 | Fixed to steel windows by welding | Kg | 870 | 219.1 | 1,90,617 |
| 22 | With 12 mm mild steel U beading | Sqm | 21 | 939.2 | 19,723.2 |
| 23 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 720 | 133.7 | 96,264 |
| 24 | Hot finished seamless type tubes | Kg | 195 | 206.35 | 40,238.25 |
| 25 | Providing and fixing M.S. fan clamp type I or II of 16 mm dia M.S. bar, bent to shape with hooked ends in R.C.C. slabs or beams during laying, including painting the exposed portion of loop, all as per standard design complete. | Each | 9 | 226 | 2,034 |
| 26 | Acid and alkali resistant tile | Sqm | 30 | 1,738.15 | 52,144.5 |
| 27 | Acid and alkali resistant tile | Sqm | 9 | 1,884.9 | 16,964.1 |
| 28 | 25 mm thick | Sqm | 96 | 1,948.25 | 1,87,032 |
| 29 | Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. | Sqm | 9 | 2,354.7 | 21,192.3 |
| 30 | Size of Tile 600x600 mm | Sqm | 90 | 1,553.45 | 1,39,810.5 |
| 31 | 110 mm diameter | Metre | 9 | 377.4 | 3,396.6 |
| 32 | 110 mm bend | Each | 6 | 150.35 | 902.1 |
| 33 | 110 mm Shoe | Each | 6 | 131.85 | 791.1 |
| 34 | 110 mm | Each | 9 | 371.3 | 3,341.7 |
| 35 | 1:3 (1 cement: 3 fine sand) | Sqm | 150 | 439.25 | 65,887.5 |
| 36 | 18 mm cement plaster in two coats under layer 12 mm thick cement plaster1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 (1 cement : 6 fine sand). | Sqm | 420 | 518.55 | 2,17,791 |
| 37 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. | Sqm | 360 | 262.7 | 94,572 |
| 38 | Flush/ Ruled pointing | Sqm | 570 | 385.4 | 2,19,678 |
| 39 | New work (two or more coats) with a base coat of white washing with lime | Sqm | 240 | 53.3 | 12,792 |
| 40 | New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre | Sqm | 525 | 185.65 | 97,466.25 |
| 41 | New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | Sqm | 285 | 160.6 | 45,771 |
| 42 | With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works | Sqm | 30 | 67.4 | 2,022 |
| 43 | Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture | Sqm | 90 | 226.25 | 20,362.5 |
| 44 | Lettering with black Japan paint of approved brand and manufacture | per letter per cm height | 510 | 6.15 | 3,136.5 |
| 45 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | cum | 12 | 8,042.3 | 96,507.6 |
| Schedule total | ₹79,88,885.78 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AdvanceCorrectionSlipNo01to12.pdf
ATTACHMENT
Annexure V of GCC
ATTACHMENT
clarificationapplicabilityACs10.pdf
ATTACHMENT
GCC 2022
ATTACHMENT
FinalSTDWorks12.2.20191.pdf
ATTACHMENT
CorrigendumintenderdocumentJU01052023.pdf corrigendum 01 05 2023
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.221.pdf
ATTACHMENT
CorrigendumintenderdocumentJU01052023.pdf
ATTACHMENT
ClarificationregardingsubmissionofAnnexure-V.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].