Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAdmitted-Finance LUDHIANA | L1 | Admitted-Finance | |
| 2 | L2₹26.3 L+₹51,853.70 (2.01%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PARVEEN SEHGAL CONT. L2 | R S BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means(JCB or Hydraulic excavator) in Trenches for pipe line with straight or open cutting in streets or open are including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic crossing over trenches for access to the houses, watching fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect | 6,341.23 | cum | 99 ₹6,27,781.77 | 94 ₹5,96,075.62 Lowest |
| 2.00 | Earthwork in excavation in foundations trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2m. depth | 252.98 | cum | 202 ₹51,101.96 | 195 ₹49,331.1 Lowest |
| 3.00 | First class brick work masonary 229mm thick laid in cement sand mortar 1:6 in foundation and plinth including supply recarriage of bricks cement | 117.24 | cum | 8,250 ₹9,67,230 | 8,200 ₹9,61,368 Lowest |
| 4.00 | 10 mm thick cement plaster 1:4 on side walls | 286.33 | sqm | 186 ₹53,257.38 | 175 ₹50,107.75 Lowest |
| 5.00 | 10mm thick cement plaster 1:4 on bed and top. | 72.05 | sqm | 147 ₹10,591.35 | 135 ₹9,726.75 Lowest |
| 6.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 2.9 | cum | 8,980 ₹26,042 | 8,800 ₹25,520 Lowest |
| 7.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 16.78 | cum | 5,525 ₹92,709.5 | 5,400 ₹90,612 Lowest |
| 8.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 23.9 | cum | 4,600 ₹1,09,940 | 4,500 ₹1,07,550 Lowest |
| 9.00 | Lowering, jointing and cutting of RCC NP-2 plain end pipes 250 mm dia with RCC collars laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | 3,355.05 | metre | 166 ₹5,56,938.3 | 165 ₹5,53,583.25 Lowest |
| 10.00 | Lowering, jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No) | 47.5 | metre | 95 ₹4,512.5 | 90 ₹4,275 Lowest |
Tender Value
₹22.0 L
EMD Value
₹43,961
Closing Date
21 Sept 2026, 12:00 pmClosed
Executive Engineer
Ropar Canal and Ground Water Division WRD Punjab
Estimate for laying underground Pipeline for watercourse at RD 26034/R of Talwandi Dist
2026_WR_174451_1
47/22A/2026-27
Open Tender
Pipe Laying Works
Item Rate
90 days
village raikot Distt. Ludhiana
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹43,961
Yes
Ropar Canal and Ground Water Division WRD Punjab
22 Sept 2026
31 Aug 2026
21 Sept 2026
31 Aug 2026
21 Sept 2026
31 Aug 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation by mechanical means(JCB or Hydraulic excavator) in Trenches for pipe line with straight or open cutting in streets or open are including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic crossing over trenches for access to the houses, watching fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect | - | cum | - | - |
| - | Earthwork in excavation in foundations trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2m. depth | - | cum | - | - |
| - | First class brick work masonary 229mm thick laid in cement sand mortar 1:6 in foundation and plinth including supply recarriage of bricks cement | - | cum | - | - |
| - | 10 mm thick cement plaster 1:4 on side walls | - | sqm | - | - |
| - | 10mm thick cement plaster 1:4 on bed and top. | - | sqm | - | - |
| - | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | - | cum | - | - |
| - | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | - | cum | - | - |
| - | Cement concrete 1:4:8 with brick ballast 40mm gauge | - | cum | - | - |
| - | Lowering, jointing and cutting of RCC NP-2 plain end pipes 250 mm dia with RCC collars laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | - | metre | - | - |
| - | Lowering, jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No) | - | metre | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_355172.xls
BOQ • 0.23 MB
ccess.pdf
Tender Documents • 0.14 MB
03of47.pdf
PDF • 0.72 MB
02of47.pdf
PDF • 0.75 MB
corri1of47.pdf
PDF • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .