Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.4 LAdmitted-Finance | ₹50.4 L | L1 | Admitted-Finance |
| 2 | L2₹51.4 LAdmitted-Finance | ₹51.4 L | L2 | Admitted-Finance |
| 3 | L3₹51.7 LAdmitted-Finance | ₹51.7 L | L3 | Admitted-Finance |
| 4 | L4₹51.7 LAdmitted-Finance | ₹51.7 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ABDUL AUDUD L3 | M/S TAPAN KUMAR RAY L4 | MS AFTAB LASKAR L2 | SHRI YOUNUS KHAN L1 |
|---|---|---|---|---|---|---|---|
| 1.00B & R Division Items | |||||||
| 2.00 | Demolition of un-reinforced cement concrete in ground floor and paving not exceeding 15 cm thick (below or above ground level) complete all as specified and directed. | 0.38 | Cum | 390 ₹148.20 | 440 ₹167.20 | 448 ₹170.24 | 400 ₹152 |
| 3.00 | Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc. and dispossing off complete all as specified and as directed. | 1.08 | Cum | 390 ₹421.20 | 450 ₹486 | 450 ₹486 | 400 ₹432 |
| 4.00 | Dismantling mild steel work or wrought iron of any description and in any position complete all as specified and as directed. | 1.5 | Qtl | 390 ₹585 | 450 ₹675 | 450 ₹675 | 500 ₹750 |
| 5.00 | Dismantling plain or corrugated steel sheeting, any gauge or any thickness as in roof covering, wall cladding, etc.including all necessary staging / scaffolding, etc. as required complete all as specified and as directed. | 320 | Sqm | 44 ₹14,080 | 44 ₹14,080 | 43 ₹13,760 | 40 ₹12,800 |
| 6.00 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing complete all as specified and as directed. | 223.97 | Sqm | 35 ₹7,838.95 | 35 ₹7,838.95 | 30 ₹6,719.10 | 30 ₹6,719.10 |
| 7.00 | Taking down cement plaster on brick or stone walls etc, including raking out joints, hacking for key scrubing down with water, removal of rubbish off the premises, removal and depositing serviceable materials where directed and leaving the work clear of any plastering. etc complete all as specified and as directed. | 323.6 | Sqm | 29 ₹9,384.40 | 29 ₹9,384.40 | 29 ₹9,384.40 | 30 ₹9,708 |
| 8.00 | Taking down chowkhats or frame with shutters (without taking off shutters from frame) each not exceeding 1.50 Sqm each complete all as specified. | 10 | Each | 280 ₹2,800 | 280 ₹2,800 | 280 ₹2,800 | 300 ₹3,000 |
| 9.00 | Taking down Chowkats or frames with shutters exceeding 1.5 Sqm but not exceeding 4 Sqm each (without taking off shutters from the frame) complete all as specified. | 4 | Each | 295 ₹1,180 | 280 ₹1,120 | 280 ₹1,120 | 300 ₹1,200 |
| 10.00 | Surface dressing n exc 15 cm deep and getting out in soft / loose soil complete all as specified | 690 | Sqm | 30 ₹20,700 | 29 ₹20,010 | 27 ₹18,630 | 25 ₹17,250 |
Updated dates
Tender Value
₹48.8 L
EMD Value
₹97,600
Closing Date
16 May 2026, 6:00 pmClosed
GE SILCHAR
Office of the GE Silchar Masimpur Cantt
SPECIAL REPAIR TO BUILDING NO T-49 AND T-50 AND CERTAIN REVENUE AND MINOR WORKS AT MASIMPUR MILITARY STATION
2026_MES_760711_1
8135A/E8
Open Tender
Civil Works
180 days
Masimpur
Class D Category a i and other criteria as per NIT and Tender Doc
8 documents required · 8 mandatory
₹500
GE Silchar
₹97,600
Yes
20 May 2026
17 Apr 2026
19 May 2026
17 Apr 2026
16 May 2026
2 May 2026
17 Apr 2026 - 25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
B & R Division Items | - | - | - | - | |
Demolition of un-reinforced cement concrete in ground floor and paving not exceeding 15 cm thick (below or above ground level) complete all as specified and directed. | - | Cum | - | - | |
Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc. and dispossing off complete all as specified and as directed. | - | Cum | - | - | |
Dismantling mild steel work or wrought iron of any description and in any position complete all as specified and as directed. | - | Qtl | - | - | |
Dismantling plain or corrugated steel sheeting, any gauge or any thickness as in roof covering, wall cladding, etc.including all necessary staging / scaffolding, etc. as required complete all as specified and as directed. | - | Sqm | - | - | |
Roughening surfaces of old concrete floor by picking, sweeping clean and washing complete all as specified and as directed. | - | Sqm | - | - | |
Taking down cement plaster on brick or stone walls etc, including raking out joints, hacking for key scrubing down with water, removal of rubbish off the premises, removal and depositing serviceable materials where directed and leaving the work clear of any plastering. etc complete all as specified and as directed. | - | Sqm | - | - | |
Taking down chowkhats or frame with shutters (without taking off shutters from frame) each not exceeding 1.50 Sqm each complete all as specified. | - | Each | - | - | |
Taking down Chowkats or frames with shutters exceeding 1.5 Sqm but not exceeding 4 Sqm each (without taking off shutters from the frame) complete all as specified. | - | Each | - | - | |
Surface dressing n exc 15 cm deep and getting out in soft / lose soil complete all as specified | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
8135A-TP.pdf
Tender Documents • 0.50 MB
BOQ_852102.xls
BOQ • 0.40 MB
8135A-SchOfCreditformat.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid