19 Feb 2026, 6:00 pmClosed
Deputy Executive Engineer, Gujarat College (R and B) Sub Dn., Ahmedabad
Repairing and Renovation of New Library (Reference Library) in Gujarat College Campus (Providing Water proofing, Plaster, Colour, Plumbing, Flooring and other misc. work) under Gujarat College (R and B) Sub Division, Ahmedabad.
275561
01 of 2025-2026
Open
Civil Works - Buildings
Works
Ahmedabad
6 documents required · 6 mandatory
₹900
Yes
Deputy Executive Engineer, Gujarat College (R&B) Sub Division, Ahmedabad
₹10,000
Yes
11 Feb 2026
11 Feb 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
Name of Work :- Repairing and Renovation of New Library (Reference Library) in Gujarat
College Campus (Providing waterproofing, plaster, colour, plumbing, flooring
and other misc. works) under Gujarat College R&B Sub Division, Ahmedabad.
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
1 12.00 Removing and scraping of old 19.57 Rupees sq.m.
deteriorated plaster of any Nineteen
thickness fromm wall / R.C.C And Paise
member including stacking of Fifty Seven
serviceable material and disposal Only
of unserviceable from site of work
with all lead and lift
2 268.00 Dismantalling tiled or stone floors 47.72 Rupees sq.m.
laid in mortar including stacking of Forty Seven
servicable materials & disposal of And Paise
unservicable materials with all lead Seventy Two
3 8.00 Dismantalling Doors, Windows, 187.71 Rupees One No.
Ventilators, etc. (Wood or Steel) Hundred
shutters including chowkhats, Eighty
architraves, holdfasts and other Seven And
attachment etc. complete and Paise
stacking them within all lead and Seventy One
'(I) Not exceeding 3 Smt. in area.
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
4 3.00 Dismantling sanitary fittings lime 405.65 Rupees Four No.
wash-basin, W.C. Pan indian and Hundred
europian type, flushing tank etc. Five And
incl. Stacking the materials with all Paise Sixty
lead and lift. Five Only
5 20.00 Demolition and disposal of 609.26 Rupees Six cu.m.
unserviceable materials with all Hundred
lead and lift.(i) unreinforcement Nine And
6 12.00 Providing and laying cement 3697.91 Rupees cu.m.
concrete 1:2:4 (1 cement : 2 coarse Three
sand : 4 graded stone aggregates Thousand
20mm nominal size) and curing Six Hundred
complete excluding cost of form Ninety
work and reinforcement in Seven And
proportion recommended by Paise Ninety
manufacture etc. complete One Only
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
7 230.00 Providing and laying broken chine 747.29 Rupees sq.m.
mosaic flooring for terrace using 12 Seven
mm to 20 mm broken pieces of Hundred
glazed tiles to be laid over cement Forty Seven
mortar 1:3 to plain or slope and to And Paise
be tempered to bring mortar creme Twenty Nine
out upto surface using white Only
cement including rounding off
junctions and extending them upto
15 cm along the wall,clearing with
water and oxalic acid etc. as
8 330.00 Providing & applying BITUMAT 615.59 Rupees Six sq.m.
SYNROOF HI-BUILD an Hundred
elastomeric, premium quality Fifteen And
acrylic coating on Sunk slab,terrace Paise Fifty
in two layers each of avg. 1 mm Nine Only
thick water proofing membrance
finished which consists a coat of
bitumin primer & middle layer of
GSM geotextile with ultra violet
resistance and working up any
package etc. complete as per detail
specification and directed by
Engineer-in-charge.
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
9 12.00 Providing and laying 15 mm thick 157.17 Rupees One sq.m.
cement plaster in single coat on Hundred
rough (similar side ) of single or Fifty Seven
half brick walls for interior And Paise
plastering up to floor two level and Seventeen
finish even and smooth in (ii) Only
Cement mortar 1 :4
10 7.00 Repairing of RCC Slab, Beam, 841.00 Rupees sq.m
Column, Pardi, Lintel, Spawlled Eight
Concrete patche by applying Hundred
Polymer Modified Cement Mortar in Forty One
the proportion Cement : Sand in Only
1:3 (by weight) fortified with SBR in
prpoportion 5.00 Ltr. per 50 Kg.
cement bag in 2 or 3 layers 25 to
50mm overall thickness wherever
total thickness of repair is
exceeding 30mm use of 10 / 6 mm
down size aggregate may be
required. The finish surface to
match with the existing adjoning
surface etc. complete as directed
by Architect / Engineer-in-charge.
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
11 33.00 Providing and laying polished Kota 992.66 Rupees Nine sq.m.
stone slab flooring over 20mm Hundred
(Average) thick base of cement Ninety Two
mortar 1:6 (1-cement : 6-coarse And Paise
sand) or L.M. 1.1.5 (1-Lime putty Sixty Six
:1.5 - coarse sand) laid over and Only
jointed with grey cement slurry
mixed with pigment to match the
shade of slab including rubbing and
polishing etc. complete. (A) 25mm
12 5.00 Providing and laying polished kota 1187.79 Rupees One sq.m.
stone slab 25mm thick in risers of Thousand
steps,skirting Dedo and pillars laid One
on 10mm thick cement mortar 1:3 Hundred
(1- Cement : 3 coarse sand) and Eighty
jointed with gray cement slury Seven And
mixed with pigment to match the Paise
shade of slab including rubbing and Seventy
polishing etc. complete. Nine Only
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
13 1.00 Providing & Fixing in position 2747.97 Rupees Two sq.m.
standard extruded approved colour Thousand
anodised Aluminum Ventilation Seven
with outer frame 65 x 25 x 1.50 mm Hundred
Stander Box Frame @ Wt 0.833 Forty Seven
kg/Rmt with 5mm thick fixed And Paise
ground glass and Mosquito net jali Ninety
fixed to alluminium strip blade Seven Only
fixed or adjestable ventilation
including all required materials,
fixtures, fastenning, labours and
equipments as per detailed
drawing as directed. For Ventilators
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
14 4.00 Providing and fixing FRP FRAME 2019.98 Rupees Two sq.m.
size 125 x 65 mm and 35mm thick Thousand
FRP shutter with wood grain raised Nineteen
panel design finish shutter having And Paise
extra reinforcement on sides and Ninety Eight
edges and in Gel coat finish. The Only
core of the shutter is to be filled up
with injected fire retardant grade
polyurethane foam done in situ
along with embedded wooden
pieces for stiffening and also for
taking hinges and fixtures. The
whole FRP frame and shutter is to
be water proof, weather proof,
termite proof and resistance to mld
acid/Alkali, Rates are to be
inclusive of S.S. hinges with
necessary screws and alluminium
fixtures and fastening. Product
should have 3 years performance
guarantee and complete have ISO
9001-2000 certification.
15 7.00 Providing & fixing flush door 1797.77 Rupees One sq.m.
shutters solid core construction Thousand
with frame of firstclass. Hard wood Seven
with cross band & face veneer or Hundred
plywood face panels inclu. Ninety
Anodised alluminium butt hinges Seven And
with necessary screws, (B) Non- Paise
decorative type & block board core Seventy
anodised alluminium butt hinges in Seven Only
flush door shutters: (2) 35 mm thick
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
16 338.00 Providing and fixing M.S. Grills of 147.53 Rupees One Kg.
required pattern on wall with M.S. Hundred
angles, square bars, channels, Forty Seven
hollow pipes & M.S. flats as And Paise
required spacings & frame alround Fifty Three
square or round bars with round Only
headed bolts & nuts or screws with
one coat of primer & two coats of
paint (B) Ornamental Grill.
17 1.00 Provdg. & fixing White colour wash 1869.57 Rupees One No.
basin of size 550 mm x 400 mm Thousand
size with single hole for pillar tap Eight
with C.I. or M.S. brackets painted Hundred
white incl. Cutting holes and Sixty Nine
making good the same including And Paise
32mm dia. C.P. Brass waste and Fifty Seven
32mm dia. fisher union for wash Only
basin / sink including provdg. &
fixing 15 mm pillar tap, capstan
head, screw down high pressure
with screws, shanks and back nuts.
18 2.00 Providing and fixing 10 Ltr. PVC 2324.14 Rupees Two No.
law level flushing tank with Allu. Thousand
Interior Mechanism to operate the Three
tank etc. With Stop Cock Waste Hundred
pipe and outlet including cutting Twenty Four
holes in walls and making good the And Paise
same etc. Complete.of approved Fourteen
brand as directed by EIC Only
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
19 2.00 Providing and fixing heavy duty 579.59 Rupees Five No.
chromium plated health faucet with Hundred
wall hook and 1 meter S.S finish Seventy
braided rubber hose of cera or Nine And
equivivelent brand make. Paise Fifty
20 2.00 Providing and fixing 15mm 2247.76 Rupees Two No.
diametre SOLO chromium plated Thousand
Angular Shape bib cock with wall Two
flange of the make as approved by Hundred
Engineer - in - charge. Forty Seven
21 5.00 Providing and fixing Solo 2394.21 Rupees Two No.
Concealed stop cock, Regular Thousand
Body with adjustable wall flange of Three
15mm diameter of the make as Hundred
approved by Engineer - in - charge Ninety Four
22 2.00 Providing and Fixing Pillar Tap, 308.73 Rupees No.
Capstan Head, Screw Down High Three
Pressure with screws, shanks and Hundred
back nuts (i) 15 mm dia. Eight And
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
23 30.00 Varnishing three coats (including 126.28 Rupees One sq.m.
priming coat) on new wood and Hundred
wood based surface under coating Twenty Six
with flatting varnish and finished And Paise
coat with varnish to give an even Twenty Eight
surface including cleaning the Only
surface of all dirt, dust and sand
papering so as to produce a
smooth dry surface.
24 950.00 Wall painting (two coats) with 79.22 Rupees sq.m.
plastic emulsion paint of approved Seventy
brand & manufacture on under Nine And
coated wall surface to give an even Paise
shade including thoroughly Twenty Two
brushing the surface free from Only
mortar droppings and other foreign
matter and sand papered smooth.
25 430.00 Wall painting (two coats) with 84.64 Rupees sq.m.
plastic emulsion paint of approved Eighty Four
brand & manufacture on under And Paise
coated Celling surface to give an Sixty Four
even shade including thoroughly Only
brushing the surface free from
mortar droppings and other foreign
matter and sand papered smooth.
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
26 920.00 Finishing wall with weather proof 114.53 Rupees One sq.m.
exterior emulsion paint on wall Hundred
surfaces (two coats) to give an Fourteen
required shape even shade after And Paise
thoroughly brushing the surface to Fifty Three
remove all dirt & remains of loose Only
powdered materials.
27 400.00 Painting two coats (including 122.49 Rupees One sq.m.
Priming coat) on new steel & other Hundred
metal surfaces with enamel paint, Twenty Two
brushing, interior to give an even And Paise
shade incl. Cleaning the surface of Forty Nine
all dirt, dust and other foreign Only
28 590.00 Applying general insecticide pest 89.28 Rupees sq.m.
control treatment to floors, Eighty Nine
cupboards etc including labour And Paise
materials etc. complete. Using Twenty Eight
Imidacloprid 30.5 SCas Per IS Only
concentration by mass) is
recommended 10.5ml chemical
diluted with 5 liters of water
application 0.5 litre chemical
/Sqm of surface is recommended
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
29 7.00 Providing and fixing in position 5445.14 Rupees Five sq.m.
collapsible steel shutters with Thousand
vertical channels 20 x 10 x 2 Four
mm braced with flat iron diagonals Hundred
20 x 5 mm size with top and Forty Five
bottom rails of T_rin 40x 40 x 6 And Paise
mm with 38mm dia, steel pulleys Fourteen
complete with bolts, nuts, locking Only
arrangements, stoppers handles
including applying a priming coat of
red lead paint.
30 6.00 Providing julla structure for height 2828.00 Rupees Two Day
up to 10th storey building with Thousand
labour and all arrangement for Eight
outside repairing work etc. directed Hundred
by engineer in charge. Twenty Eight
31 70.00 Providing scaffolding setup for 97.97 Rupees sq.m
dismantling work and chajja work Ninety
including cost of transportation, Seven And
erection, dismentalling etc. Paise Ninety
complete Seven Only
Rs. In words : Rupees Nine Lakh(s) Seventy Six Thousand Two Hundred Fifty Five And
Paise Forty Eight Only
I / We am / willing to carry out the work at __________ above / below __________ percentage
(should be written in figures and words) above / below the estimated amount mentioned above.
Amount of my/our tender works out as under.
Item Quantities Item of work Estimated Rates Unit Total
No. Estimeted Amount
but may be In In Words according to
more or Figures Estimated
less quantities
Estimated Amount put to Estimated Amount put to
Deduct _________ % Below. Add _________ % Above.
Note : The comparision of Lowest Bidder will be made as under :
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated inS.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the costof difference of cement
consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
5. Credit of Rs. 13,200/- Shall be recovered from the payable bills towards cost of dismental
Dated Signature of Deputy Executive Engineer
the Contractor Gujarat College (R & B) Sub Dn.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
002-Sch-B (R and R New Library).pdf
003-Dismental Credit St (R and R New Library).pdf
004-Specification (R and R New Library).pdf
005-GR as per SBD (12-01-2024)-Guj Coll Sub Dn.pdf
006-Standards for Cement Con. Dt.11-5-2017.pdf
007-Single Tender GR Dt.18-2-2017.pdf
008-Tender Negotiation Dt.08-06-2018.pdf
009-Testing Schedule Dt.24-10-1994.pdf
010-GR Regarding Laplength in Reinforcement Dt.15-2-2017.pdf
011-FD Circular No 1097 GST Dt.15-9-2018.pdf
012-Registration Mandatory Dt.3-9-2016.pdf
013-Tender Reinvite Guideline Dt.25-8-2015.pdf
014-E-Tendering-Tender Fee and EMD Dt18-1-2008.pdf
015-E-Tendering-Tender Fee and other doc Dt.27-11-2008.pdf
016-Payment through RTGS-NEFT Dt.30-4-2018.pdf
017-RMC (Dt.15-07-2023)for above 5 cr works.pdf
018-Bond-Colour.pdf
019-Bond-Water proofing.pdf
020-Bond-Antitermite.pdf
021-Bond-FRP Door.pdf
022-Mix Design Condition..pdf
023-Specification Booklet-BUILDING.pdf
001-SBD Document (R and R New Library).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .