| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.5 LAccepted-AOC NO 46 PERUMAL KOIL STREET MISSION STREET CUTTING PUDUCHERRY 605 001 | PONDICHERRY | PUDUCHERRY | 605001 | ₹24.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹25.3 L+₹84,528.76 (3.45%)Rejected-Finance NO 198 MAHATMA GANDHI ROAD MUTHIALPET PUDUCHERRY 605 003 | PONDICHERRY | PUDUCHERRY | 605003 | ₹25.3 L+₹84,528.76 (3.45%) | 2 | Rejected-Finance L2 Bidder |
| 3 | 3₹25.7 L+₹1.2 L (4.85%)Rejected-Finance | ₹25.7 L+₹1.2 L (4.85%) | 3 | Rejected-Finance L3 Bidder |
Tender Value
₹25.7 L
EMD Value
₹64,300
Closing Date
10 Sept 2020, 11:00 amClosed
Superintending Engineer - MPORs
No. 137, NSC Bose Salai, Puducherry, 605 001
Erection of 6 Nos. of 22/0.433 KV, 315 KVA Distribution Transformers along with L.T arrangement with supply of certain materials, fabrication works and allied works at various locations in the Puducherry region under IPDS Project
2020_CCPOW_6482_1
123/ED/EECTTC/IPDS/20-21
Open Tender
Supply, Erection and Commissioning
Works
90 days
Rural North O and M
Please refer to Tender Documents
3 documents required · 3 mandatory
₹590
Yes
Drawing and Disbursing Officer, Division II, Pdy
₹64,300
Yes
O/o. Superintending Engineer - MPORs
28 May 2021
29 Jul 2020
11 Sept 2020
29 Jul 2020
10 Sept 2020
29 Jul 2020
29 Jul 2020 - 7 Sept 2020
7 Aug 2020
Supply of HT Stool
Supply of 22 KV Strain Disc insulator with metal parts
Supply of 5' 6'' channel cross arm
Supply of F-Clamp
Supply of H.T Stay set complete with material as required
Supply of LT 3 Phase cross arm with suitable pole clamp
Supply of LT shackle insulator with metal part.
Supply of LT pin insulator with Pin
Supply of CI knobs
Supply of L.T Stay set complete with material as required.
Supply and Labour charges for erection of 30 ft RCC stud pole.
Labour charges for fixing of H.T Stool for 22 KV OH Line.
Labour charges for fixing of 22KV pin insulator with G.I. Pin.
Labour charges for fixing of 22KV strain disc insulator with metal parts.
Labour charges for erection of LT 3 Phase cross arm with suitable pole clamp.
Labour charges for fixing of LT shackle insulator with metal part.
Labour charges for erection of fixing of LT pin insulator with Pin
Labour charges for fixing of F clamp
Labour charges for fixing of CI knobs
Labour charges for erection of H.T Stay set complete including excavation of pit
Labour charges for erection of L.T Stay set complete including excavation of pit.
Supply and labour for erection of DP Transformer structure complete including excavation,erection of 30' RCC pole, refilling of 30' RCC pole and concreting 0.6 x 0.6 x 1.5 mts. and coping 0.6 x 0.6 x 0.5 mts. in 1:3:6 ratio using cement. 20mm HBG metal and sand, (30' RCC pole, DP structure materials, Bed channel, S/ C AB switch, 5'6" channel cross arm, HG Fuse, LAS, Pin Insulators, center support, M.S Angle 50x50x6 stay sets (if required), erection of earth electrode and construction of 4 nos of earth pit, GI wire No.6 for earthing all metal parts, Copper No. 4 wire for earthing of 18 KV Lightning arrestor and separate earthing for Transformer LT earth bush, painting 2 coat of aluminium paint for all channels, metal parts etc. and two coats of cement colour painting, to RCC pole etc., including cost of concreting materials such as cement,20mm HBG Metal, sand, aluminium & cement paint, copper No. 2,4 & 16 for jumper connections, HG Fuse arrangement, earthing of LAS, 'B' Class G.I Pipe 50mm dia for earthing, 12 mm alkathene pipe, HT/LT Danger & name board SS, MS 5/8 bolt nuts & washers (required size ) etc., Including loading and unloading charges for DTRs and conductor to be supplied by the Department.
Supply and Labour charges for erection of DP Transformer structure complete including excavation, erection of 42' rail pole, refilling of 42' rail pole and concreting 0.6 x 0.6 x 2 mts. and coping 0.6 x 0.6 x 0.5 mts. in 1:3:6 ratio using cement. 20mm HBG metal and sand, 42' rail pole, DP structure materials, Bed channel, S/ C AB switch, 5'6"channel cross arm, HG Fuse, LAS, Pin Insulators, Center support, M.S Angle 50x50x6, stay sets (if required), erection of earth electrode and construction of 4 nos of earth pit, GI wire No.6 for earthing all metal parts, Copper No. 4 wire for earthing of 18 KV Lightning arrestor and separate earthing for Transformer LT earth bush, painting 2 coat of aluminium paint for all channels, metal parts etc. and two coats of cement colour painting, to rail pole etc., including cost of concreting materials such as cement, 20mm HBG Metal, sand, aluminium & cement paint, copper No. 2,4 & 16 for jumper connections, HG Fuse arrangement, earthing of LAS, 'B' Class G.I Pipe 50mm dia for earthing, 12 mm alkathene pipe, HT/LT Danger & name board SS, MS 5/8 bolt nuts & washers (required size ) etc., Including loading and unloading charges for DTRs and conductor to be supplied by the Department.
Supply and Labour charges for erection of 30’ RCC pole including excavation of pole pit and concreting, 0.6 x 0.6 x 1.5 Mts. and coping 0.6 x 0.6 x 0.5 Mts. in 1:3:6 ratio using 20 mm HGB Metal, earthing of RCC pole including supply of concreting materials and No. 6 G.I wire for earthing.
Supply and Labour charges for erection of 42' Rail pole including excavation of pole pit and concreting, 0.6 x 0.6 x 2 Mts. and coping 0.6 x 0.6 x 0.5 Mts. in 1:3:6 ratio using 20 mm HGB Metal, earthing of Rail pole including supply of concreting materials and No. 6 G.I wire for earthing.
Labour charges for fixing of 5'6' channel cross arm with suitable clamp
Supply and Labour charges for providing of LT feedering arrangement for taking connection from the LT bush of the transformer including supply of 50x10mm aluminium flat, Aluminium socket for cable and required quantities of 3.5 core X 300 Sqmm. UG Cable.(as per site condition)
Labour Charges for straining of ACSR conductor 7/3.35 Sq.mm including binding etc. as required
Labour Charges for straining of ACSR conductor 7/2.59 Sq.mm including binding etc. as required
Labour charges for Dismantling of 24' RCC Pole
Supply and Labour charges for erection of 30' RCC pole (LT), including concreting and earthing.
Labour charges for Dismantling of LT Lines
Provision of H.T Guarding one span of 70 Mts. Average with G.I .Wire (Including supply of all required materials)
Mani Electrical Service
Southern Engineering
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_6627.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .