Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
17 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Add. City Engineer,North Zone
Supply of mini sucker cum jetting machine for desilting of drainage lines and machine holes of various places like Laxmi nagar, trikamlal ni chali, Santoshi nagar, kumbhaji ni chali and other narrow chali and streets in kubernagar ward of North Zone
363750
E-TENDER NOTICE NO.13/2026-27/NORTH ZONE TENDER No.-136
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
6 Nov 2026
6 Nov 2026
6 Nov 2026
17 Nov 2026
6 Nov 2026
120 days
Sr. No Department No. of work Total Amount
Manager (North Zone). The technical bid shall be opened online on Dt.- 21.11.2026 at 11.00 hrs. Any change /
correction / corrigendum in respect of above work shall be placed on line. Contractors are requested to see
the website before 24 hours of submission of their tender.
Assistant Manager (North zone), Ahmedabad Municipal Corporation
North Zone Office Building, Memco-Naroda road, Ahmedabad
Deputy Municipal Commissioner
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTEMENT- (N.Z.)
Name Of work :- Supply of mini sucker cum jetting machine for desilting of drainage
lines and machine holes of various places like Laxmi nagar, trikamlal ni chali, Santoshi
nagar, kumbhaji ni chali and other narrow chali and streets in kubernagar ward of North
Q'ty Item Rate Per Amount
Hiring of suction cum jetting small machine (including driver &
1 98 10189 shift
operator for 1 shift) include all.
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (North Zone)
Ahmedabad Municipal Corporation
PRICE BID / TENDER FORM
ESTIMATED COST PUT TO
SR.NO. NAME OF WORK
1 Supply of mini sucker cum jetting machine for
desilting of drainage lines and machine holes of
various places like Laxmi nagar, trikamlal ni
chali, Santoshi nagar, kumbhaji ni chali and Rs
other narrow chali and streets in kubernagar
ward of North Zone
I/We am/are willing to carry out work at __________% above / below (should be written in figures and
words) the estimated cost mentioned above. The amount of my/our tender works out as under
Estimated cost put to tender : Rs 998522.00 Estimated cost put to tender: Rs
Add_____% above : Rs ___________ Total Deduct _____% below : Rs __________
: Rs___________ In words : Rupees Net : Rs__________
Signature of contractor with seal Additional City Engineer ( N.Z )
Date Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Naroda Raod, Ahmedabad-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online e-tenders from interested contractors for :- :- Supply of mini
sucker cum jetting machine for desilting of drainage lines and machine holes of
various places like Laxmi nagar, trikamlal ni chali, Santoshi nagar, kumbhaji
ni chali and other narrow chali and streets in kubernagar ward of North Zone
1 Name of work :- :- Supply of mini sucker cum jetting machine for
desilting of drainage lines and machine holes of various
places like Laxmi nagar, trikamlal ni chali, Santoshi
nagar, kumbhaji ni chali and other narrow chali and
streets in kubernagar ward of North Zone
2 Time Limit 12 MONTHS
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC or equivalent register
with any other state Govt. or institutions.
5 Estimated Cost put to tender Rs.
6 Tender fees Rs.900/-- Demand Draft in favour of Municipal Commissioner, Ahmedabad)
(Non refundable)
7 Earnest Money Deposit Rs.9985/- (Demand Draft or pay order or Bank Guarantee in favor of
Municipal Commissioner, AHMEDABAD/) To be submitted as prescribed in
8.0 below. Demand Draft or Bank Guarantee shall be from Nationalized
Bank / Scheduled Bank and valid for 120 days.(As per AMC finance dept.
circular No-5 Dt.5/5/07 & F.D. Circular No. 29 Dt. 7/08/2010) & attached
ANNEXURE - 1 finance dept. circular No - 08 Dt.04/05/12
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with Tender
as described in the invitation of tender and submitted to Assistant Manager
Tender Fees (NORTH zone) , Rajiv Gandhi Bhavan, Memco-Naroda Road, Ahmedabad To
be Submitted Physically As per N.I.T
9 Date of Opening of Technical Technical Bid will be opened online as per N.I.T. in the office of Addl. City
bid Engineer (North Zone), Rajiv Gandhi Bhavan, Memco – Naroda Road,
Ahmedabad Municipal Corporation, Ahmedabad
10 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank Guarantee / Demand
Draft / Local MICR Cheque.(As per Annexure-I)
11 Mode of sending the Tender Price bid should be submitted by online e-tender only and Technical bid
Documents should be submitted physically also in sealed envelope systems By
RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (One
Original & One Duplicate) Each part shall be separately duly sign & seal by
12 liquidated damages 0.1% of contract price per day from the date of delay. Maximum limit of
liquidated damages for delay in completion of work will be 10% of the
Contract Price rounded of to the neared thousand.
13 Deduction of Retention Retention
Money from each RA Bill
1. @ 2% of the value of work done will be deducted from each RA bill. It
will be released along with release of payment of Final Bill.
14 Place of Arbitration Ahmedabad
15 Language of Arbitration English
16 Amount to be deducted Welfare cess as per act 1996 @ 1 % of bill amount
from each bill for labour
welfare fund (non-
17 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall be
Specification applicable..
18 Defect &Liability Period The contractor shall be responsible to make good and remedy at his
own expense any defect which may develop or may be noticed before
the period mentioned hereunder from the certified date of completion,
The within 15 days of receipt of the notice. In the case of failure on the
part of the contractor, the Engineer-in-charge may rectify or remove or
re-execute the work at the risk & cost of the contractor. The Engineer-
in-charge shall be entitled to appropriate the whole or any part of the
amount of security deposit towards the expenses, if any, Incurred by
him in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the certified
date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
12 months from the certified date of completion which should include
(d) For building works, the period specified in (a), (b) or (c) above OR
elapse of monsoon period following the certified date of completion,
whichever is later. For the purpose of deciding the monsoon period, the
30th September may be treated as the last date.
19 Time permitted to start parts Whenever a work is allotted by Engineering staff, whether minor or major
of work of part thereof of any amount, the contractor shall be bound to start the
works within 48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through letter / E-mail shall be
considered legal and binding for the same. Failure of comply to start the
works in 48 hours of intimation as above by contractor the contractor
shall be levied penalty of (1) Rs.1000/- per day (for tenders amounting
upto 10 Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs). Three times failures by contractor shall make contractor
responsible to be black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of penalty.
20 Compensation for Delay 10% of Remaining work (As per Circular)
21 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the Final
Submission Time And Date. The Same Shall From a part Of Tender And The
Same As to be Attached Along With The Tender Document.
22 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
23 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the tenders
without assigning any reasons there of.
Seal and Signature of the Bidder Addl.City Engineer
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (ઉત્તર ઝોન )
Bank guarantee shall be submitted as per AMC Finance Department Circular No.03 dated 28-04-2023
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
❖ All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for theperiod up to March-
31, 2024. The validity cut-off date in the GR is withrespect to the date of issue of Bank
Guarantee irrespective of the date oftermination of Bank Guarantee.
Commercial Banks :-
1) A U Small Finance Bank
3) City Union Bank
4) DBS Bank India Limited
6) Equitas Small Finance Bank
7) Federal Bank
10) IndusInd Bank
11) Kotak Mahindra Bank
12) Standard Chartered Bank
13) Tamilnadu Mercantile Bank
14) Bandhan Bank
15) BNP Paribas
18) Karnataka Bank
19) Krur Vysya Bank
20) South Indian Bank
21) Utkarsh Small Finance Bank
Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Limited
9. The Surat District Co-operative Bank
10.The Surat Peoples Co-operative Bank
11.SVC Co-operative Bank LTD.
The Issuing Branch Shall Be Of Ahmedabad & Gandhinagar Only.
Special Note: - Amendment, If any by finance department of A.M.C. Shall be Considered final and
Binding Contractors .
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( hereinafter called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of
Works detailed in the Table below:-
Sr. Name of Works Approximate Earnest Money Completion
No. value of works Deposit (Rs.) Period
1 Supply of mini sucker cum Rs.998522.00 Rs.9985.00 12 - MONTHS
jetting machine for
desilting of drainage lines
and machine holes of
various places like Laxmi
nagar, trikamlal ni chali,
Santoshi nagar, kumbhaji
ni chali and other narrow
chali and streets in
kubernagar ward of North
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of
Demand Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non refundable.
The Details of Tender fees shall be submit with scan copy at the time of Quoting price
bid of the tender and Physically to be submitted along with technical bid Vol.-1 with
other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the
Works in the above Table payable at Ahmedabad and drawn in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to
be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi
Bhavan, Memco – Naroda Road, Ahmedabad As per N.I.T
6. The Bids will be opened on As per N.I.T at the office of Dy..City Engineer (N/Z) , 1st
Floor, Rajiv Gandhi Bhavan, Ahmedabad Municipal Corporation, Memco-Naroda road,
Ahmedabad-25. in the presence of bidders or their representatives who choose to attend. In
the event of the specified date of bid submission/opening being declared a holiday for the
Employer, the bids shall be received /opened on the next working day at the same place and
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on
the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour shall
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible for
all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 10 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 10 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Additional City Engineer (N.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of Supply of mini sucker cum jetting
machine for desilting of drainage lines and machine holes of various places like
Laxmi nagar, trikamlal ni chali, Santoshi nagar, kumbhaji ni chali and other
narrow chali and streets in kubernagar ward of North Zone
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad MunicipalCorporation,
A'bad specified up to his first written demand, without demur without delay andwithout the necessity
of a previous of judicial or administrative procedures and without thenecessity to prove to the Bank
the defects or short comings or debits of the contractor any sumwithin the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effectduring the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender)we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consentof the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tendereror of
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender isaccepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (N.Z) Dy. Municipal Commissioner (N.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
North Zone, Ahemedabad
Name of Works: - Supply of mini sucker cum jetting machine for desilting of
drainage lines and machine holes of various places like Laxmi nagar, trikamlal
ni chali, Santoshi nagar, kumbhaji ni chali and other narrow chali and streets
in kubernagar ward of North Zone
I/We the undersigned have carefully gone through and clearly understood the Tender documentsfor the
above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.I/We have
visited site & fully acquainted with local situations regarding materials, labours & others factorspertaining to
work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the saiddocument
and with such materials as are provided for, at the respective rates which I/we have quoted in theschedule-B or
at such other rates as maybe fixed under the provisions of these conditions.In the event of this tender being
accepted I/We agree to enter into an agreement and when required andexecute the contract, according to your
fom1 of agreement as or in default where of I/we bindmyself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC fromthe
date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and takenecessary action
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for thesum
as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer IfI/We fail to
commence the work specified. Otherwise the said sum shall be retained, by the Employer as onaccount of such.
Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
withConditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
ofopening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroiduties and other prevailing Government taxes/charges on such items on which the same are leviable and
therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ઉત્તર ઝોન - Esluh Ftðþ
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu.dJobuLxlt btLg
ftuLx[[tfxhu y.Bgw.ftuvtuo. bt btLg ftuLx[[tfxhtu le gtœebtkk hSMxuNl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: xuLzhhle jtgft< ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKebtk ytJ<t ntug <ubs ftb fhJt mûtb
ntug <ublu s ytvJtbtkk ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve,heLgwyj Ve
<&t yvd{uzuNl Ve ylu btv œkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath ylu
JvhtNlt ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt, ftb
vwhwk fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu, gtzo, zevtu btxule
søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt (12 btm) le hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
3: xuLzh Jujezexe rvhegz (120 rœJm) (As Per City Eng.Circular no-3 Date:-03/09/2016) )
4: xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh< fhJtlt
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk
xuLzh mt&u hsw fhJtlwk hnuNu.
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
6) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn ylu
ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkkfzt vh
Auftu bthelu <ult mtawk jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg
dKJtbkkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu
ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
1) ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk
bwfuj Nh< y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu
y&Jt xuLzhbt <u btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR
fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu fhe
NfNu lrn fu ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R NfNu
9: rJmkkdr< ylu rnmtc stud: nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf
leault rlgbtu ylwmth mhCh fhJtbtkk ytJNu.
1) xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg
htFJtbtkk ytJNu.
2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtf lt Ftltbtkk&e hfbbtkk Cwj sKtg
<tu yufb œh btLg htFJtbkkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkkt ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< ægtlbtkk juJtbtkk ytJNu lrn.
10y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu. yt mbg bgtoœt 10 jtF mw^elt ftb btxu yuj.ytu.ytR.
ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 15 rœJm&e NY
&guj dKJtbt ytJNu. <&t <u œhrbgtl ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu. ylu
<ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
10c: mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk
ytJNu ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt
rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10f: mœh ftbltk xuLzhbtk bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit ctœlt ftbdehe vqKo l &tg <tu
FhuFh ctfe ftble hfblt 10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtbtk ytJNu. (mexe
Rsluh(Rsluh Ft<w) mhfgwjh lk.3 <t. 03/09/2016 bwsc.)
11 y: awfJKe xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe,
vtjF, ÃjtLx, œuFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh sKtg <tu ylu
ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykkdult
<ublt ftuR œtJt ægtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu(vAe<u ctkk^ftb rJCtdltu
fboathe ntug fu l ntug)<ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk. <ublw xuLzh ChJt
<&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw
fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK ò<lt
ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx + yu¾x[t ytRxb)
2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt cejbtkk&e
fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ (1) z[turkRd
(2)xuLzh Vtubolwk CtJvºtf
ce) z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
3. xuLzh Vtubole ylwmwra-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b dKJtbkkt
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atsuo
Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule mkvwKo
sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu
lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu.vtujem Vhegtœ &tg <tu <ule sJtcœthe vK ftuLxtfxhle hnuNu. CuFz
Dme l vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu.CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu
œtuhzwk ctk^e bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk W<thNu <tu ftuLx[[tfxh s
vtujem Vhegtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn.ytxjwk
mbSlu s xuLzh ChJwk. Bswhtultu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t sYh
sKtg <tu xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc bxehegÕm fu ceò xuMxed hevtuxo
ftuLx[tfxhu vtu<tlt Fauo ftuvtuohN
u l sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao
ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu ftb
fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx/vtujemlt ftgœtlw
vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle
ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk
ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
25: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef vxe,rJ.
ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe ftuLx[tfxhle hnuNu.
26: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk
juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t yr^ftheytuyu
ftb mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u
«btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu hnuNu.
28: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu bwsc
hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd
fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd
fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt ytJNu.
30: su ftbtubtk atubtmtlt mbgdt¤tlu ctœ ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e
mÃxuBch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u mbgdt¤tu ctœ
fhe ftble mbgbgtoœt dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk ytJNu.
31: ftuLx[tfxhu «J<obtl ybœtJtœ Bgw.lemevtj ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu muÕm
xuût lu jd<t vwhtJt vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft<
je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le
ò<-btne<e bu¤Je Au.
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
œM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (ઉત્તર ઝોન)
mh¾gwjh lkch 3, <theF 3/9/16
Bgwrlrmvj ftuvtuohuNlbtk Rsluh rJCtd îtht htuz, vtKe, rcÕzekd, z[ulus, jtRx rJduhl
u t ònuh sl<tle mrwJ^tlt
rmrJj ftbtu fhJtbtk ytJu Au. mkcr^< ftbtubtk swœt swœt Ítul <&t «tusufx îtht yufmwºt<t s¤JtR hnu <u nu<w &e
y.Bgw.ftu.îtht JF<tu JF< fhJtbtk ytJuj swœt swœt mhfgwjhtubtk leau bwscltu mw^thtu Bgwrlrmvj frbNlh©ele
b¤uj bkswhe ylwmth fhJtbtk ytJu Au.
1. y.Bgw.ftu. îtht Rsluh Ft<t îtht bkdtJJttbtk ytJ<t xuLzhbtk ftble sYhe Nh<tu mt&u Vtubo ce-1 le jtdw vz<e <btb
Nh<tu bwscle ftbdehe fhJtle hnuNu vhk<w vulÕxe btxu ltKtkFt<wk vrhvºt lk. -18, <t.-04/07/2012 lt bwœt lk.1-R btk
mwaÔgt bwscltu yuxjufu leau bwscltu fjtuÍ xuLzhtubtk htFJtltu hnuNu.
rlg< mbgbgtoœtbtk ftb vwht l &tg <tu vuLtÕxe Jmwj juJt ctc<:-
(1) nJu vAelt <btb xuLzhbtk bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit ctœlt FhuFh ctfe ftble hfblt
10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtle Nh< nJu vAelt ftbtbtk htFJtle hnuNu <&t ntjbtk atj<t
ftbtubtk <&t su ftblt Vtglj cej cluj l ntug <uJt ftbbtk vK bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit
ctœ &guj ftble vulÕxe Jmwj fhJt ykdu bq¤ bkswh &guj mbgbgtoœt / Liquidated Damages ctœlt FhuFh ctfe
ftble hfblt 10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtlwk sYh sKtg <tu yt bwscltu rlKog juJtle m•tt
Bgw.frbNlh©elu ytvJtbtk ytJuj Au.
(2) xuLzhbtk Milestone recovery (Time yt^the<) le Nh< htFJtbtk ytJuj ntug Au sultu ybj Ft<tyu fhJtltu ntug
Au. vhk<w, ftbdehelt ybjefhK œhrbgtl y.Bgw.ftu.lt fthKtumh ftbbtk rJjkc &guj ntug sule òK Bgw.frbNlh©elu fhuj
ntug <&tmûtb m•ttyu bwœT< J^ fhuj ntug <u JF<u mbd{ ftb Extended Time Limit btk vwKo &guj ntug <tu
Milestone recovery (Time yt^trh<) le fvt< fhJtle hnuNu lne su bwsclu Nh< nJu vAelt ftbbtk htFJtle
hnuNu. Yt bwscltu ybj ntjbtk atjw ftbbtk <&t su ftblwk Vtglj cej cluj l ntug <uJt ftbbtk fhJtlwk sYh sKtg <tu yt
ykdu Bgw.frbNlh©ele sYhe bkswhe bu¤JJtle hnuNu.
2. y.Bgw.ftu. îtht Rsluh Ft<t îtht bkdtJJttbtk ytJ<t rmrJj ftbtult xuLzhbtk (1) stu xuLzh mekdj-cez vræ^r<&e bkdtJuj
ntug ylu xuLzhle hfb 50 jtF&e ytuAe ntug <tu xuLzhle Jujezexe vehegz 90 rœJm yLtu xuLzhle hfb 50 jtF&e J^w ntug
<tu xuflefj cez FtuÕgt <theF &e xuLzhle Jujezexe vehegz 120 rœJm <&t (2) stu xuLzh xw -cez vræ^r<&e bkdtJuj ntug <tu
œhuf rfMmtbtk xuflefj cez FtuÕgt <theF &e xuLzhle Jujezexe vehegz 120 rœJm Au.
3. su ftuLx[t¾xhtu ze, R-1 ylu R-2btk ytJ<tk ntug <uytulu Yt.1.00 fhtuz mw^elt ftbtu btxu ltKtk Ft<tlt
mh¾gwjh lkch 43, <theF 17/10/2012 btk mwaÔgt bwscltu ybj fhJtltu hnuNu.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
& STAMP (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works. Progress
of work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as
per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be
final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the rejected
materials shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall
have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to
make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra and
the contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim
for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act. 1970 and the
Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to
start the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered
separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be applicable as
per tender condition only.
CONTRACTOR'SSIGNATURE & STAMP ADD. CITY ENGINEER
Mobile No.:- (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
SectionA1–SPECIAL CONDITIONS OF CONTRACT
1. This tender is invited for contract. Contractor shall have to execute the work in all zones
simultaneously. He shall have to start the work within the day of instructions given from the
2. AMC will have to give the instruction to start the work all together for more than one place in
different Area. He should have minimum machinery stated in eligibility criteria.
3. The Bill of Quantities shall be reading conjunction with the Instruction to Bidders, Conditions
of Contract, and Technical Specifications.
4. The bidder must have visited and examined the area of the Works and its surroundings
and obtained all data and it is his own responsibility. All information that may be
necessary for preparing the bid and entering into a contract for this type of Works. The
costs of visiting the site shall be at the bidder's own expense.
5. Bidder must have knowledge of existing sewage flow quantity or he must have got data of
sewage flow quantity in the sewerage trunk main lines or Branch sewer lines and he must
have aware of required pumping for diversion of the existing flow.
Bidder shall have to maintain flow level in all manhole of upstream line during diversion of
flow by proper pumping system. In this regard bidder shall have to divert the flow in same
line by alternate manhole distance if there is no extraline and he shall not raise any issue of
extra line for diversion of the flow.
6. The bidder and any of its personnel or agents will be granted permission by the Employer to
enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer
and its personnel and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
7. No claim in future for unknown with the site by the bidder shall be granted in any case.
8. AMC may execute any item of the BOQ too less or too more in any occasion. Therefore
bidder shall not raise any claim for non executing item or too more executing items or too less
executing item.
9. The basis of payment will be the actual quantities of work executed and carried out, as
measured by the Contractor and verified by the Engineer and valued at the rates and prices
bid in the priced Bill of Quantities, where applicable, and otherwise at such rates and prices as
the Engineer may fix within the terms of the Contract. Contractor shall not raise any claim
for too less or too more quantities executed by him. Quantity may vary with respect to
BOQ as well as place of work also may change cited in the tender.
10. The rates and prices Bid in the priced Bill of Quantities, except in so far as it is otherwise,
provided under the Contract, include all constructional plant, labour, supervisions, materials,
all temporary works and false works, erection, maintenance, establishment and overhead
charges, profit, any taxation and levies, octroi and other charges together with all general
risks, liabilities and obligations set out or implied in the Contract and including remedy of any
defects during the Defects Liability Period.
11. Bidder is requested to fill rate on total cost of the BOQ considering the Contract. AMC
shall evaluate bidders capability to work considering work on hand and work in progress in
all parts of India. AMC shall evaluate bidder`s capability of doing the work considering
working progress and response to the instructions delivered from AMC engineers and
authority to him. Bidding capacity shall be considered applying general formula. (Note: If any
query in this clause bidder shall clarify/may contact before entering into the contract.)
12. Contractor shall fill percentage rate on amount of BOQ. Items other than in the BOQ will be
paid for by the Employer on actual measurement (preferably current SOR of any
organization) on site if executed.
13. Employer reserves the right to accept the tender of more than one bidder with lowest
approved rate and also reserves the right to give the work order to more than one bidder with
same approved rate of the lowest bidder. Any bidder of lowest quoted rate cannot claim for
his solely qualified tender.
14. The contractor should have to attend the breakdown if any as early as possible and should
have to complete the work without unavoidable delay.
15. Contractor shall have to provide experienced operator and workers on hiring of super sucker
on shift bases.
16. Payment shall be given within 15 days on the raise of monthly bill.
17. n case of Accident or death of Employer’s of Contractor or third party, A.M.C. will not be
Responsible in any manner/Manners.
18. In case of damage of machines due to Accident, AMC will not be responsible.
19. In any case, contractor is not allowed to work inside the manhole or sewer lines.
20. The operator and workers shall be Contractor’s employees. Corporation staff (Technical
Supervisor / Engineers) will show only the site where the work is to be carried out.
21. Contractor shall not raise any claim for too less or too more quantities executed by him.
Quantity may vary with respect to BOQ as well as place of work also may change cited in
the tender. AMC will execute this contract subject to Availability of the fund. If, fund is not
available then AMC may cancel this tender. Contractor shall not raise any claim in future for
22. Contractor should start the work with all the safety & protection equipments like, Helmets,
Gloves, Safety Boots, Oxygen masks, etc. as per the law. In any case of issues occurring at
site regarding safety of laborer, Contractor shall be responsible for the same.
23. Payment will be made after getting satisfactory working report from the user
24. Contractor should have AMC Registration.
25. Contractor should have the past working experience of executing minimum 10 No. of
constructing Kacha/Pakka Paradi.
26. Contractor should be having past experience of cleaning MH/CH Cleaning work.
27. Contractor should be owning the equipments like Electric and pneumatic hammer both.
28. Bidder must own this type machine for this tender. Bidders name should be there in RTO registration
copy (RC book). in the case of ownership of the machine.
29. 18%GST will be paid as per circular.
Seal and Signature of the Bidder Add. City Engineer
Date: (North Zone)
TECHNICAL SPECIFACATION :
Name of Work: Supply of mini sucker cum jetting machine for desilting of
drainage lines and machine holes of various places like Laxmi
nagar, trikamlal ni chali, Santoshi nagar, kumbhaji ni chali
and other narrow chali and streets in kubernagar ward of
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
Item No. 1:- Hiring of suction cum jetting small machine (including driver & operator for
shift) include all.
This Item includes de-silting work of machine holes to be done by small jetting cum
suction machine at different places with narrow streets and chawls in low lying areas.
Item includes all the labours (skilled and unskilled) and supervisors required for the
work including fuel and water tankers.
Note: The work should be done by the labours with all the safety equipments like Helmets,
Gloves, Safety Boots, Oxygen masks, etc.
The rate shall be for a unit of Shift.
yu.yth.me. xuLzh- Nh<tu
- yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto
ctœ 24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu
ftbdehe fhtJJtbtk ytJNu.
- ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb
NY fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk
vwKo fhJtbtk lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
- ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©e lu hnuNu.
Jtr»tof huRx xuLzhbtk bhtb<-rlCtJltk z[ulus, vtKe, htuz, rcÕz´dlt swœt swœt ftbtu <&t Mxu.f.X.lk.
<t.27.07.2012 &e JtÕbefe mbtsle bkz¤eytulu ytvJtbtk ytJ<t z[ulus zemeÕx´dlt ftbtu btxu ltdrhf
yr^fth vºtfbtk sKtJuj mbg bgtoœtbtk Vrhgtœltu rlftj fhJt <ubs muJtfeg ftbdehe mbg bgtoœtbtk vwKo &tg <u
btxu R-dJolLm me.me.yth.yum. «tusufx yk<od<<t.21.08.2021lt mh¾gwjh <&t mexe Rsluh Ft<w vrhvºt
lk.2 <t. 07.10.2023 lt vrhvºt,Bgw.frb.©ele <theF 23.04.2026 le belexm ytuV bexekd ltk bwœTt lk.21
ylwkm^tlu z[tVx btk mtbuj vulÕxe Nh<tu xuLzhbtk htFJtle ylu <u bwsc le vulÕxe JmwjJtle xuLzh Nh<tu leau bwsc
1. me.me.yth.yum.btk ltuk^t<e Vrhgtœ Jtuzoltk Rsluh MxtV îtht ftuLx[tfxh/yusLmelu Jtuxmyuv/xujeVtulef
btægb&e y&Jt YcY juFe<btk Vrhgtœ ytvJtbtk ytJNu.mœh Vrhgtœle ftbdehe yum.yuj.yu. le
mbg bgtoœtbtk fhJtle hnuNu.
2. ftbdehe vwKo > ctœ <ult Vtuxtud{tV,mxeoVefux ylu ftbdehe vwKo > le òK yum.yuj.yu. mbg
bgtoœtbtk Jtuzolt MxtVlu fhJtle hnuNu.
3. stu ytvlu ytvuj Vrhgtœ yum.yuj.yu. mbg bgtoœtbtk vwKo lne &tg <tu yt mtbuj ftuÐf bwscle
vulÕxe le hfb ytvltk cej btk&e Jmwj fhJtbtk ytJNu.
4. ytvlu mtukvJtbtk ytJuj me.me.yth.yum. Vrhgtœtu ltu hevtuxo yXJtzef ^tuhKu rlg< Vtubuoxbtk «btKe<
fhe Jtuzo yturVmu hsw fhJtltu hnuNu.
5. ftuLx[tfxh îtht yhsœth lu Vtul fgto ctœ mœh Vrhgtœ yLg Jtuzo fu yLg rzvtxobuLx fu y.Bgw.ftuvtuohN
ftgoûtuºt btk l ytJ<e ntuR <ule òK Jtuzo MxtVo lu <tðftrjf fhJtle hnuNu.
➢ me.me.yth.yum Vrhgtœ mbg bgtoœt btk rlftj l &Jtlt mkstudtu btk fhJtle &<e 5uluÕxe le rJd< leau
Sr. Department Category Problem SLA Penalty
1 Engineering Water>>Engineering Inadequate water or low inflow 240
pressure - Eng Hours
2 Engineering Water>>Engineering Leakage In Pipe Line - Eng 48
3 Engineering Water>>Engineering Water quality-Polluted water - 24
4 Engineering Water>>Engineering No Water - Eng 240
5 Engineering Drainage>>Engineering Drain Blockage or Choking on TP 48
road - Eng Hours
6 Engineering Drainage>>Engineering Overflowing of main line and 48
distribution line on road - Eng Hours
7 Engineering Drainage>>Engineering No Drainage Manhole cover - 24
8 Engineering Drainage>>Engineering Frequent Breakdown & 96
Blockage of Drain - Eng Hours
9 Engineering Road Pot holes on the Road 24
10 Engineering Road Patch work Relaying of a 72
portion of road Hours
11 Engineering Road Deep Pit - Large settlement of 48
12 Engineering Road Removal of waste-Dust Lying on 72
both side of the road after re Hours
13 Engineering Footpath Footpath Repairing Required 168
14 Engineering Public Building No Water Supply In A Public 24
15 Engineering Public Building Public Toilets and Urinals - 360
Repairing of Doors, Windows, Hours
Tiles or Sheets
16 Engineering Public Building Other Maintenance 168
17 Engineering Drainage>>Engineering Contractor Had not disposed off 48
the Manhole Silt Properly - Eng Hours
18 Engineering Drainage>>Engineering Raising the Manhole Cover & 168
Catch Pit Up To the Road Level - Hours
19 Engineering Drainage>>Engineering Lowering the Manhole cover & 168
Catch pit - Eng Hours
20 Engineering Drainage>>Engineering Public Toilets and Urinals - 72
Drainage Line Blockage or Hours
21 Engineering Drainage>>Engineering Public Toilets and Urinals - 168
Drainage Line Breakage Hours
22 Engineering Water>>Engineering Public Toilets and Urinals - Non- 168
Availability of Water/Cleaning Hours
of Water Tank/Broken Tank
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
vol-1 tender -136.pdf
Vol-2 tender-136.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .