Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
20 Mar 2026, 6:10 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Sabarkantha Irrigation Division, Himatnagar
Strengthening work of spillway, Bucket, left side Key, D/S R/S Training wall and U/S L/S wing wall and Arpon of Khedva Dam.
284700
Tender Notice No 30 of 2025-26
Open
Civil Works
Sabarkantha
13 documents required · 12 mandatory · 1 optional
₹3,600
Yes
Executive Engineer Sabarkantha Irrigation Division Himatnagar
₹2.8 L
Yes
10 Mar 2026
10 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
BILL OF QUANTITIES
Strengthening Work of Spillway, Bucket, left side Key, D/S R/s Training wall and U/s
work : L/S wing wall and Apron of Khedva Dam.
MEMORANDUM SHOWING THE DETAILS OF ITEM OF WORK TO BE CARRIED OUT
Quantity Approved RATE
Item estimated but
Item of Work In Figure Unit Amount
No. may be more
or less Rs. Ps.
1 Chiseling and chipping loose concrete by manually or 1380.00 395.00 Sqmt
mechanically and clean the surface. Cost include labour
and alt tools & tackles
2 Providing and applying Epoxy based Bond coat (i.e 1527.00 1054.00 Sqmt
Nitobond Ep of FOSROCID-Fixl Sika or Equivatent) for
excellent bonding of new patch work of steet and
oncrete. Cost lncludes all Materials, labour and tools &
3 Providing and applying pre-packed, cement based spray 1527.00 4287.00 Sqmt
applied mortar of rnin. M40 grade i.e. minimum of
N/pa at 1 day and 40 MPa at28 days like MasterEmaco
S 810 of BASF/ FOSROC I D-Fixt Sika or equitant of
Fosroc ake upto 25 mm on entire portion of wall, floor of
any structure to the prepared concrete area, after
cleaning the prepared surface with air and water jetting,
epoxy base bond coat applied on old surface of concrete
initially by using spray gun for reprofiling and finally
finishing the same with trowel carefully compacting the
same around the rebar and inishing to bring it in line at
all heights including all materials, labour, tools,
scaffolding, plant and achineries, curing etc. complete
as directed by Engineer-in-charge
4 Providing and laying in position reinforce controlled 1050.00 5863.00 Cum
cement concrete using crushed aggregate including
providing necessary formwork, centering, vibrating, all
lifts etc complete in M-30 grade concrete. (MSA 20mm)
5 Dewatering the foundation trenches during excavation, 7734.00 52.50 Hp/Hr
laying foundation concrete, masonry etc. till completion
and diversion of surface and subsurface water etc.
complete as directed.
6 Dismantling the R.C.C. work and disposing off the stuff 387.00 1732.80 Cum
including stacking of the useful materials etc. complete
as directed. (a) Light Reinforcement ( Main bar upto
7 Providing and fixing 3.75 m long TMT steel anchor bars 114.00 1455.00 NO
of 25 mm dia by drilling 35 mm dia hole in fouandation
including necessary cutting, bending, hoisting bars and
grouting the holes with cement slurry etc. complete (1.50
mt. to be inserted below excavated level) as directed.
Quantity Approved RATE
Item estimated but
Item of Work In Figure Unit Amount
No. may be more
or less Rs. Ps.
8 Excavation for foundation in Hard Rock including 217.00 382.90 Cum
blasting and chiseling if necessary sorting out and
stacking separately the usable rubble, depositing the
excavted stuff as and directed including backfilling
trenches with suitable exavated stuff etc. complete for
lead upto 500 m. and all lifts. ( Machinery)
9 Providing & Placing in position reinforcement bars 12.00 82019.00 MT
including cutting, bending, welding joints where
necessary, hooking etc. complete as per drawing for all
lead and lifts. CRS (FE 500 D)
10 Providing & Laying in position "NOMINAL MIX" cement 125.00 3935.00 Cum
concrete using cement, sand and crushed aggregate by
mass and machine mix for C.C./R.C.C work incl.
necessary formworks centering, scaffolding, compaction
by vibrator, curing as directed with all lead & lift etc
complete Without Dewatering and excluding cost of
steel reinforcement. (A) For Foundation concrete /
General purpose. (c) C. C. Nominal Mix, M-15 and MSA-
11 Providing and fixing nipples with approved fixing 584.00 492.00 Nos
compound after making grooves 10 mm wide and
mm deep, drilling holes for grouting along cracks in
CC/RCC structure, sealing of grooves including
subsequent cutting/removal and sealing of the holes of
nipples after grouting by the approved fixing compound,
complete as per specification.
12 Drilling 35 mm dia. vertical grout hole in required pattern 685.00 3109.00 Rmt
as directed on top of the bank for grouting from top of
bank upto 10.00 mt. depth by means of DTH air blowing
machine non vibrating with necessary tools including all
labour and incidental all laboure etc complete.
13 Providing and Grouting Polymer SBR with Cement 27650.00 264.00 Kg
Grout in proportion as per manufacturer’s specification.
Arrangement to access the surface shall be include
complete as per specification including cost of all
materials, machinery, labour, scaffolding, transportation
with all leads and lifts and any other incidental charges
as directed by the Engineer-incharge
14 Providing 25 to 40 mm ( 1" to 1.5" ) thick guniting in 494.00 1243.80 Sqmt
cement mortar 1:2 cement and sand proportion
including binding 6 mm dia. reinforcement @ 9.24 kg/m2
for cement concrete works including finishing , curing
and use of air compressor and guniting equipments and
accessories with all costs of materials and labours
required for the work.
Quantity Approved RATE
Item estimated but
Item of Work In Figure Unit Amount
No. may be more
or less Rs. Ps.
15 Providing cement pointing in C.M.1:3 to the brick 247.00 177.90 Sqmt
masonry and stone masonry for exposed faces including
watering, curing, scaffolding wherever necessary
16 Excavation for foundation in all sorts of soil including 86.00 102.40 Cum
yellow sandy gravelly soils ,soft & hard murrum etc. in
dry condition including depositing the excavated stuff in
uniform layers in banks or as and where directed etc.
complete for lead up to 500m and all lift. (BY
MACHINERY) (a) Excluding dewatering.
17 Earth work in embankment using selected soil, soft & 86.00 304.00 Cum
hard murrum excavated from approved borrow area /
village tanks etc. Including conveying, spreading in
uniform layers, breaking clods and dressing to the
designed canal section etc. with lead upto 500m and all
lifts (for canals having capacity up to 300 Cusec) ( By
18 Compaction of earthwork in embankment in uniform 86.00 43.20 Cum
layers at optimum moisture content to required dry
density including watering, rolling with suitable type of
roller of specified capacity etc. complete.
I / We am/are willing to carry out the work at ___________________________________ % above / below
percent (should be written in figures and words) of the estimated rates mentioned above. Amount of my/our
tender works out as under :-
Estimated amount put to tender Rs. Rs.
Deduct :- …………….. % below Rs. Rs.
Total:- Rs. Rs.
* (Please strike out whichever is not applicable)
Signature of Contractor Deputy Executive Engineer
Khedbrahma Irrigation Sub Division
Executive Engineer
Sabarkantha Irrigation Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Bucket signed.pdf
POL Bucket signed.pdf
SBD Bucket 0903.pdf
Tender Notice 30 of 2025-26.pdf
Download all tender documents and submit your bid