Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹2.3 Cr+₹30.6 L (15.7%)Rejected-Finance | ₹2.3 Cr+₹30.6 L (15.7%) | L2 | Rejected-Finance highest |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
6 May 2021, 5:00 pmClosed
Jaswinder Singh
Executive Engineer, Provincial Divn. No.2, PWD B and R Br., Ambala Cantt.
Construction of link road to alternate road from ROB on Saha-Shahbad road Km. 62.80 from New Haryana State Highway No. 31 (Now NH-444A) via Ghasitpur to New Haryana State Highway (Road ID 345) and Construction of Link road to New Haryana State Highwa
2021_HRY_170043_1
PWD/AMB/AMB-2/110093
Open Tender
Construction Works
Works
180 days
Ambala Cantt.
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹4.0 L
5 Mar 2025
27 Apr 2021
7 May 2021
27 Apr 2021
6 May 2021
27 Apr 2021
Amount
Construction of embankment, sub grade and shoulders of new road portion at RD 400 to 2200m in (Road ID 345) & 0 to 550m (Road ID 312) with soil of minimum CBR (4 days soaked) of 8% obtained from borrow pit with all lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The finished road surface will be as per X-section approved by employer with respect to GTS. At no place top of sub grade of raised road will be less than 0.90 m above adjoining NSL. NSL for a block of 100m will be worked as mean of 6 levels taken on 20 m center to center length of road. These six levels are at three location on both side one at edge ROW. Other at 5 m and 10 m away from ROW. In case the quantity of earth work calculated with NSL and finished level found to be less than 28420.00 cum. Then actual quantity (less than 28420.00 cum) will be paid. In case quantity worked out is more than 28420.00 cum, then only 28420.00 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. Note:- If soil of CBR 8% is not available then the agency will do appropriate stabilization as per IRC –SP-89-2010 as approved by SE-in-Charge and nothing extra shall be paid on this account and it will be incidental to work. No earth work will be allowed from PWD land.
Providing and laying 100mm thick granular sub base consisting of filter layer confirming to Table 400.1 Grading-III of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1. Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing and laying 100mm thick granular sub base consisting of drainage layer confirming to Table 400.1 Grading-VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1. Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing & laying (Compacted) stone metal (G-I) 63 to 45mm gauge wearing coat to Water Bound Macadam using screening type 'B' compacting with 3 wheeled steel roller/vibratory roller to achieve the desired density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications of road & bridges (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respect. (N.S.) Note: - 1. Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing & laying 75mm thick (compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam using screeenign type 'B' compacting with 3 wheeled steel roller / vibratory roller toi achive the desire density inculding lighting, guarding barricading and maintenance of diversion etc. as per clause No. 404 of MoRT&H specification of road & bridge (5th revision) of 2013 as per drawing and design directed by the Engineer complete in all respect. (N.S.) Note: - 1. Only crushed metal material should be used. No local earth/ natuaral occuring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing, laying 100mm thick spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.406. (N.S.) Note: - 1. Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing and laying Tack Coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification. (N.S.)
Providing and applying Primer Coat with bitumen emulsion (S.S grade-I) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.502. (N.S.)
Providing & Laying 50mm thick compacted Dense Graded Bituminous Macadam (DBM) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate rollers to achieve the desired compaction as per clause No. 505 MoRT&H specification for road and bridge works (5th edition) 2013 using minimum 4.50% to bitumen grade VG-30 as binder content by weight of total mix, complete in all respect including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification (5th edition) 2013 in mandatory. If bitumen required more than 4.50% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. (N.S.) Note:- Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note: - Where there is DBM on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing and laying 30mm compacted thickness of Bituminous Concrete (BC) in one layer with 100 - 120 TPH Batch Type Hot Mix Plant with bituminous binder VG-30 @ 5.4% (minimum) and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher having sufficient screed width so that the BC in full width of the carriage way is laid in single opration without any longititutinal joint with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and with pneumatic tyred roller (PTR) of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa and tandem rollers to achieve the desired compaction as per MORT&H specification (Vth revision)-2013 Clause No. 507 complete in all respect. If bitumen required is more than 5.4% as per job mix including waste plastic material no extra payment will be made, Extra bitumen required will be considered as incidental to work. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note: - Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing and fixing Public Information Board consisting of 75mm GI pipe of size 2.45m x 1.15m with 900mmx900mm GI sheet 16 gauge connected / welded with 5mm thick steel plate of 50mm duly painted as per coloumn mentioned in the drawing and fixing at site in 60x60x75 cm cement concrete 1:2:4 block complete in all respect.
Providing and fixing of shoulders mounted Sign Boards of various sizes using non metalic micro prismatic retro reflective sheet conforming to IRC-67-2012 type IV HIP specification fixed on 3mm thick aluminium composit panels as base board with presure sensitive adhesive, having 0.5mm thick aluminium on both sides supported on miled steel pipe post 80mm NB medium class 4mm thick embended M-20 grade concrete foundation of size 450mmx450mmx600mm complete as per drawing, technical specifications and directed by Engineer-in-Charge. Size 600mm Equilateral Triangle.
Providing & fixing Retro Reflective Hazard Marker confirming to IRC79: 1981 of size 900 x 300 mm with back support of M. S. angle 25 x 25 x 3 mm and post of 50 x 50 x 5 mm, 1500 mm high embedded into 0.3 x 0.3 x 0.3 m M20 grade concrete as per site requirements, using non-metallic micro-prismatic retro reflective sheet confirming to IRC: 67-2012 type IV specification fixed on 3 mm thick aluminium composite. Material sheet as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides (of reputed make such as Array dennison/3M).
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M)
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflector zing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use.
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Cement concrete 1:6:12 with stone aggregate 40mm Nominal size in foundation and plinth. (HSR 10.32)
Cement concrete 1:4:8 with stone aggregate 40mm Nominal size in foundation and plinth. (HSR 10.39)
Cement concrete 1:2:4 with stone aggregate 20mm nominal size in first storey upto 4 metres above plinth level. (HSR 10.59)
Cement concrete 1:2:4 with stone aggregate 20mm nominal size for reinforced concrete work in slabs with inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centering and shuttering , laid in position, complete in all respects. (HSR 10.82)
First class brick work laid in cement sand mortar1:5 in foundation and plinth. (HSR 11.3)
First class brick work laid in cement sand mortar1:5 in foundation and plinth. (HSR 11.5)
First class brick work laid in cement sand mortar1:5 in first storey upto 4 meters above plinth level. (HSR 11.8)
Cement pointing 1:2 deep variety on brick and Tile work. (HSR 15.60)
Cement pointing 1:2 flush on brick-on-edge Flooring. (HSR 15.70)
Steel reinforcement TMT bars FE-500 EQR/FE-500 D grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights/depths/storeys/basements etc. Note :- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps, wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for inforcement. (HSR 18.22)
Making and filling expansion joints, with bituminous filler (bitumen 40 percent, asbestors 5 percent and sand 55 percent),12 mm wide. (HSR 24.34)
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked, antitermite as required at site, into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches, if required, Jointing with rubber rings in trenches and jointing with 1:1½ cement sand mortar and with end dowels filled with 1:1½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No. 29.38, 29.44, 29.45 & 29.46) including cartage, loading and unloading complete in all respects. Note:- Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
Note :- In case of any difference in the unit & nomenclature of any of the HSR items of Civil items depicted in the DNIT and that given in HSR the unit and nomenclature given in HSR shall be applicable.
Garg and Co. Jind
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .