| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.5 LAccepted-AOC PB NO 04 KARUNAGAPALLY KOLLAM 690 518 | KARUNAGAPALLY | KOLLAM | KERALA | 690518 | 1 | Accepted-AOC L1 | |
| 2 | 2₹14.0 L+₹2.1 L (17.4%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹14.4 L+₹2.5 L (21.4%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹14.6 L+₹2.7 L (22.7%)Rejected-AOC | 4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹13,200
Closing Date
14 Feb 2020, 11:00 amClosed
MANAGING DIRECTOR
KSDPLTD,KALAVOOR P.O,ALAPPUZHA
SUPPLY, ERECTION, COMMISSIONING AND VALIDATION OF BOILER CHIMNEY for Non Betalactam Project as per the tender schedule and BOQ/drawing
2020_ksdp_339035_1
KSDP/PRJ/NONBETA/BOILERCHIMNEY /09/19-20/85
Open Tender
Miscellaneous Works
Item Rate
60 days
KSDPLTD, KALAVOOR P.O
Original Manufacturers/contractors having a place of business in any of the States of India with at least 5 years consistent standing in the field.
12 documents required · 12 mandatory
₹3,186
Yes
online
₹13,200
Yes
1 Oct 2021
1 Feb 2020
15 Feb 2020
1 Feb 2020
14 Feb 2020
1 Feb 2020
1 Feb 2020 - 14 Feb 2020
Amount
SUPPLY,ERECTION, COMMISSIONING AND VALIDATION OF BOILER CHIMNEY
Civil work for the Foundation of Chimney as per BoQ2
Supply,Fabrication,erection,commissioning and validation of chimney as per the URS and drawings attached.
Description of Work / Item(s)
Civil work for the Foundation of Chimney
Earth work in excavation by mechanical means /manual means in foundation trenches including dressing of sides and ramming of bottoms, lift up to 2.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 150m. The work including shoring,dewatering etc
Cement concrete 1:4:8 using 40mm hard granite broken stone in lines and levels including cost & conveyance of all materials, all labour charges, hire charges of all tools & plants and hire charges of form work, charges for curing etc. complete as directed by the officers concerned.
Centering and shuttering including strutting,propping etc. and removal of form work for foundation,footings,bases of columns etc. for mass concrete. complete as directed by the officers concerned.
Providing and laying in position specified grade of RCC excluding the cost of centering, shuttering,finishing,reinforcement All work upto plinth level:complete as directed by the officers concerned.1:1.5:3(1 cement : 1.5 coarse sand(Zone-III) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Thermo Mechanically treated bars of grade Fe 500 D or more and complete as directed by the officers concerned.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 150 m and lift up to 1.5 m.
Plastering work in cement motar12 mm thick finished with a floating coat of neat cement of mix 1:4 (1 cement: 4 fine sand)
Fixing company free issued bolts including nuts and washers,including all labour charges, hire charges of all tools and plants etc. complete as directed by the officers concerned.
SILK-Steel Fabrication Unit
Techs India Company
Devi Engineering Works
HIND ERECTORS
Devi Engineering Works
Techs India Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .