Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.3 LAccepted-AOC 2 B KRISHNA NAGAR AMBALA CANTT | AMBALA | HARYANA | 133001 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹49.4 L+₹12,814 (0.26%)Rejected-Finance 231 JAGGI GARDEN BALDEV NAGAR AMBALA CITY HARYANA 134003 | AMBALA CITY | AMBALA | HARYANA | 134003 | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER | |
| 3 | L3₹54.7 L+₹5.5 L (11.1%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN LOWEST BIDDER |
Tender Value
Refer Docs
EMD Value
₹99,000
Closing Date
15 Jun 2021, 6:00 pmClosed
GE AF AMBALA
GE AF AMBALA
GE AF/AMB-09/2021-22 GRASS CUTTING AT RUNWAY / TAXI TRACK SHOULDERS, PAINTING TO RUNWAY AND TAXI TRACKS AND REPAIRS TO JOINTS WITH POLYURETHANE AT AF STATION AMBALA UNDER GE (AF) AMBALA
2021_MES_443608_1
GE AF/AMB-09/2021-22
Open Tender
Civil Works
Item Rate
335 days
GE AF AMBALA
ALL AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE AF AMBALA
₹99,000
Yes
18 Aug 2021
18 May 2021
17 Jun 2021
18 May 2021
15 Jun 2021
2 Jun 2021
24 May 2021 - 28 May 2021
Amount
M&L for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings not exceeding 30cm in girth (measured at a height of 1m above the ground level) on either side of runway, taxi track, aprons and other places in techincal area by deploying jungle jims (06 feet) with tractors, operators including fuel, lubricant, etc. complete all as specified and as directed Notes: (i) 01No. jungle jim, 01No. tractor, with operators shall be measured as one unit (ii) Cut grass/bushes/vegetation, etc. shall be removed outside techinal area and or as directed (iii) Minimum 02 units of jungle jim tractor with operators shall be deployed at site. The requirement may vary as per quantum of work required (iv) Refer to BOQ Note No. 8 on serial page No. 16
M&L for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings not exceeding 30cm in girth (measured at a height of 1m above the ground level) on either side of runway, taxi track, aprons and other places in techincal area by deploying bush grass cutter with operator including fuel, lubricant, etc. complete all as specified and as directed Notes: (i) 01No. bush grass cutter with operator shall be measured as one unit (ii) Cut grass/bushes/vegetation, etc. shall be removed outside techinal area and or as directed (iii) Minimum 02 units of bush grass cutter with operator shall be deployed at site. The requirement may vary as per quantum of work required (iv) Refer to BOQ Note No. 9 on serial page No. 17
M&L for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings not exceeding 30cm in girth (measured at a height of 1m above the ground level) on either side of runway, taxi track, aprons and other places in techincal area by deploying 03Nos. labourers including all necessary tools, etc. complete all as specified and as directed Notes: (i) Cut grass/bushes/vegetation, etc. shall be removed outside techinal area and or as directed (ii) Minimum 03Nos. of laboureres shall be deployed at site. The requirement may vary as per quantum of work required (iii) Refer to BOQ Note No. 10 on serial page No. 17
M&L for taking out of old sealing compounds grade 'B' with rakers and cleaning, removing all foreign materials/particles, dust, etc. with coir brush, fine particles cleaned with air compressors from joints any type, thickness and depth of taxi tracks / runways and preparing surfaces, applying two coats of primer, providing approved quality closed cell polythene backup rod of dia 25% more than the width of joint over joint filler board in position and filling in polyurethane joint sealant compound [minimum Movement Accommodation Factor (MAF) +30% conforming to BS: 5212, BS-4254 and EN-141875-2003] using mechinical means to a depth of 10mm (minimum depth above back up rod) including and applying masking tape on edges of joints to prevent accidental slippage of sealant on top surfaces and to give a neat finish to the sealant and removing the masking tape after sealant is applied as required and removing all taken out refuse materials to a distance exceeding 100m and not exceeding 500m including all carting, etc. complete all as specified and directed for the following widths:
upto 12mm
exceeding 12mm but not exceeding 25mm
exceeding 25mm but not exceeding 35mm
Notes for item Nos. 4 to 7: (i) Work shall be got done through authorised applicators of the manufacturer approved (ii) All tests viz. Hydrolysis test / water resistance test, etc. and as required in accordance to relevant IS / BS are to be done and TCs shall be submitted (iii) The Contractor shall submit 10years guarantee on Rs. 100 non-judicial stamp paper and also submit FDR as security, amount of which shall be attained @5% on amount of work done
M&L for repairs to cracks in existing bituminous surfaces of taxi tracks by cutting to a width of 10 to 25mm and 30 to 50mm deep by mechanical cutters, etc. cleaning with air compressor to remove all loose particle, dust, etc. and filling with epoxy tar compound as per manufacturer's instructions and disposing all rubbish/ refuse to a distance exceeding 50m but not exceeding 100m complete and all as specified and directed
M&L for repairs to damaged / broken edges of existing cement concrete slabs of taxi tracks by cutting to a depth 10 to 50mm, cleaning with air compressor to remove all loose particle, dust, etc. with air blowers, etc. and applying evenly one coat of epoxy rich primer with sealer and filling in with epoxy resin compound and disposing all rubbish/ refuse to a distance exceeding 50m but not exceeding 100m complete all as specified and as directed
Notes for item Nos. 9 & 10: (i) Work shall be got done through expert applicators in accoradnace to procedure detailed by the manufacturer and as approved (ii) The Contractor shall submit 10years guarantee on Rs. 100 non-judicial stamp paper and also submit FDR as security, amount of which shall be attained @5% on amount of work done
M&L for preparation of old surfaces by removing all foreign materials, dust, etc. by scrapping, etc. cleaning with water spray and or air blowers, of rigid concrete / bituminous pavements of runways / taxi tracks and the like exceeding 10cm wide and painting lines, dashes, strips, circles, markings, etc. with one coat of weather proof runway marking paint in required pattern and in required tint complete all as specified and as directed
M&L for preparation of old surfaces by removing all foreign materials, dust, etc. by scrapping, etc. cleaning with water spray and or air blowers, of rigid concrete / bituminous pavements of runways / taxi tracks and the like exceeding 10cm wide and painting lines, dashes, strips, circles, markings, etc. with two coats of weather proof runway marking paint in required pattern and in required tint complete all as specified and as directed
Bairagi Builders
RAJINDER KUMAR AND ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .