Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.9 L+₹27,735 (5.96%)Rejected-Finance VPO BARI TEHSIL GANAUR SONEPAT 131101 | SONEPAT | SONIPAT | HARYANA | 131101 | L2 | Rejected-Finance Higher | |
| 3 | L3₹5.1 L+₹40,307 (8.67%)Rejected-Finance | L3 | Rejected-Finance Higher | |
| 4 | L4₹5.1 L+₹41,257 (8.87%)Rejected-Finance | L4 | Rejected-Finance Higher |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
25 Nov 2022, 9:00 amClosed
E.E
MC Sonipat
Estimate for open gym equipments at Eldico Colony Sonipat
2022_HRY_226799_2
Job No.2304/XEN/MCS
Open Tender
Civil Works
Fixed-rate
60 days
Sonipat city
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹10,000
Yes
13 Dec 2022
18 Nov 2022
25 Nov 2022
18 Nov 2022
25 Nov 2022
18 Nov 2022
Amount
Air Walker: Providing, designing and fixing of Air-Walker of size 100 x 550 x 1480mm fabricated with main post of 140mm dia and 3.00 mm thick and other pipes of 40mm dia 3.00mm thick made up of hot rolled tubular steel and hot dipped galvanized, and powder coated 80-120 micron thick using Akzo Nobel or equivalent in desired shade and colour. All welding joints of pipe shall be robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Base plate cover shall be made up of virgin LLDPE plastic by rotational moulding with minimum 4.00mm thickness U V resistant and colour as approved by Engineer-in Charge. High quality grip rubber should be used on handles. Foothold shall be made of Nylon alloy with rounded edge to prevent impact and injury. Maintenance free bearing should be used in equipment manufactured by reputed company duly sealed and self lubricated to be approved by Engineer in charge. Equipment to be fitted with inbuilt limiters . The equipment should be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and when concrete is set, fixing the equipment on to it and cover nuts and bolts with base plate cover, all complete as per direction and approval of Engineer-in-Charge regarding material, shape of equipment, colour (of metal, seat and pedal), and fixing of equipment etc.
Horse Rider Station: Providing, designing and fixing of horse rider station of size 1000 x 600 x 1100 mm fabricated with main post of 140mm dia and 3.00 mm thick and other pipes of 40mm dia 3.00mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Akzo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Padals shall be made up Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing used shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Engineer-in-Charge. Equipment to be fitted within built limiters to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and once the concrete is set, fix the equipment on to it and cover nuts and bolts with the base plate cover, all complete as per direction and approval of Engineer-in-Charge regarding material, shape of equipment, colour on metal, seat and base cover plate and fixing of equipment etc
Leg Press: Providing, designing and fixing of stair stepper in a combination of pair and a single step of size 2000 X 550 X 1600 mm fabricated with main post of 140mm dia and 3.00 mm thick and other pipes of 40mm dia 3.00mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Akzo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Handle bars are to be provided with high quality grip rubber at top end. Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing used shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Engineer-in-Charge. Equipment to be fitted within built limiters to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and once the concrete is set, fix the equipment on to it and cover nuts and bolts with the base plate cover, all complete as per direction and approval of Engineer-in-Charge regarding material, shape of equipment, colour on metal, seat and base cover plate and fixing of equipment etc.
Seated Chest Press :- Providing, designing and fixing Seated Chest Press of Pull pair of size 1800 X 700 X 2000 mm fabricated with main post of 140mm dia and 3.00 mm thick and other pipes of 40mm dia 3.00mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Akzo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Handle bars are to be provided with high quality grip rubber. Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing used shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Engineer-in-Charge. Equipment to be fitted within built limiters to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and once the concrete is set, fix the equipment on to it and cover nuts and bolts with the base plate cover, all complete as per direction and approval of Engineer-in-Charge regarding material, shape of equipment, colour on metal, seat and base cover plate and fixing of equipment etc
Arm Wheel :- Providing, designing and fixing Arm Wheel in a pair of size 850 X 800 X 1800 mm fabricated with main post of 140mm dia and 3.00 mm thick and other pipes of 40mm dia 3.00mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Akzo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Handle bars are to be provided with high quality grip rubber. Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing used shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Engineer-in-Charge. Equipment to be fitted within built limiters to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and once the concrete is set, fix the equipment on to it and cover nuts and bolts with the base plate cover, all complete as per direction and approval of Engineer-in-Charge regarding material, shape of equipment, colour on metal, seat and base cover plate and fixing of equipment etc
Double Cross Walker :- Providing, designing and fixing Double Cross Walker of size 1600 X 600 X 1600 mm fabricated with main post of 140mm dia and 3.00 mm thick and other pipes of 40mm dia 3.00mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Akzo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Padals shall be made up of Nylon alloy with rounded edge of prevent any impact of injury and seat to be made from virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing used shall be maintenance free, duly oiled sealed and self lubricated made by reputed company to be approved by Engineer-in-Charge. Equipment to be fitted within built limiters to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and once the concrete is set, fix the equipment on to it and cover nuts and bolts with the base plate cover, all complete as per direction and approval of Engineer-in-Charge regarding material, shape of equipment, colour on metal, seat and base cover plate and fixing of equipment etc
Sit Up Station: Providing, designing and fixing of double sit-up station of size 1500 x 1150 x 650 mm fabricated with main post of 140mm dia and 3.00 mm thick and other pipes of 40mm dia 3.00mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Akzo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe shall be robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Seat and Base plate cover shall be made up of virgin LLDPE plastic by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. The equipment should be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and when concrete is set, fix the equipment on to it and cover nuts and bolts with the base plate cover, all complete as per direction and approval of Engineer-in-Charge regarding material, shape of equipment, colour (of metal, seat and pedal), and fixing of equipment etc.
Air Swing: Providing, designing and fixing of airs winging pair of size 1150 x900 x1250 mm fabricated with main post of 140mm dia and 3.00 mm thick and other pipes of 40mm dia 3.00mm thick all pipes made up of hot rolled tubular steel and hot dipped galvanized, and powder coated using Akzo Nobel or equivalent of 80-120 micron thick. All welding joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. Zinc primer paint to be applied at all welding points prior to finishing. Seat and Base plate cover shall be made up of virgin LLDPE manufactured by rotational moulding with minimum thickness of plastic 4.00mm, colourful and U V resistant environmental friendly. Bearing used shall be maintained free, duly oiled sealed and self lubricated made by reputed company to be approved by Engineer-in-Charge. Equipment to be fitted within built limiters to prevent unwanted movements. All open ends of pipe to be coloured by GI/LLDPE caps for user safety. The equipment to be fixed on ground with concrete of minimum strength M25 and J shaped welded bolts and once the concrete is set, fix the equipment on to it and cover nuts and bolts with the base plate cover, all complete as per direction and approval of Engineer-in-Charge regarding material, shape of equipment, colour on metal, seat and base cover plate and fixing of equipment etc
Bidder Name
Amount
Deepak Kumar Contractor(GSTN-06CXJPK5986M1ZO)
THE SHIVAM CO OP L AND C SOCIETY LIMITED(GSTN-NA)
The Shree Radhey Coop. L&C Society Limited Gharaunda(GSTN-NA)
vardhman associates(GSTN-NA)
The Shree Radhey Coop. L&C Society Limited Gharaunda
THE SHIVAM CO OP L AND C SOCIETY LIMITED
Deepak Kumar Contractor
vardhman associates
The Shree Radhey Coop. L&C Society Limited Gharaunda
THE SHIVAM CO OP L AND C SOCIETY LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .